橋堰 的英文怎麼說

中文拼音 [qiáoyàn]
橋堰 英文
bridge weir
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : 名詞(較低的擋水建築物) weir
  1. Design and construction of grouting, water sealing and reinforcement for surrounding weir of loading pile of ji ' an bailu bridge

    吉安白鷺大承臺圍注漿止水加固的設計與施工
  2. Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985

    自從武漢長江大工程中擯棄了過去一直沿用的氣壓沉箱,首次採用了鋼板樁圍管柱基礎以來, 1985年建成的九江長江大基礎獨創性地採用雙壁鋼沉井圍鉆孔樁基礎,鋼圍梁基礎施工中的應用越來越多。
  3. Construction of cofferdam for bearing platform and steel sheet pile of main piers of huangzhou bridge

    黃洲大主墩承臺鋼板樁圍施工
  4. The design of the drilling platform for bored pile construction of hangzhou bay cross - sea bridge

    杭州灣跨海大承臺鋼板樁圍的設計與施工
  5. Practice shows that this design is successful and presents a new design - concept and method

    實踐證明本異型鋼圍的設計是成功的,為今後特大型異型鋼圍設計提供了新的設計思路和方法。
  6. The design and construction of boxed cofferdam of the zhujiang bridge

    珠江特大吊箱圍設計與施工
  7. In the light of the low - lying pile cap foundations designed for main piers no. 2 and no. 3 of tianluo bridge on wenzhou - fuzhou railway. this paper describes the ways to resolve the construction problems of the foundations in deep water in sea and at seabed that is steep and without overburden, using the construction techniques of underwater rock blasting, steel cofferdam floating, positioning, bottom sealing and manual pile digging

    摘要針對溫福鐵路田螺大2號、 3號主墩設計上採用低樁承臺基礎情況,介紹運用水下巖石爆破,浮運鋼圍就位、封底、人工挖孔樁等施工技術解決海上深水、河床陡峭且無覆蓋層的基礎施工難題。
  8. The new construction technique applied to the huge steel boxed cofferdam for foundation of pylon pier no. 2 of wuhan tianxingzhou changjiang river rail - cum - road bridge was to fabricate the cofferdam in integrity in workshop, shift it down to river and float it to the pier site where it is then accurately positioned by pre - tensioning at the anchor pier

    摘要武漢天興洲公鐵兩用長江大2號主塔墩基礎大型鋼吊箱圍採用工廠整體製造,下河浮運至墩位,利用錨墩施加預拉力精確定位的施工新工藝。
  9. This paper gives an account of the construction schemes of building artificial islands and sinking concrete cofferdams for shoal piers no. 53 and no. 59, and the construction schemes double - wall steel cofferdams for deep water piers no. 54 ~ 58 of hengyang xiangjiang river bridge on wuhan - guangzhou passenger dedicated railway

    摘要介紹武廣客運專線衡陽湘江特大53號、 59號淺灘墩採用的築島、下沉混凝土圍施工方案,以及54 ~ 58號深水水中墩採用的雙壁鋼結構圍施工方案。
  10. The characters of the steel round the barrage are : very convenient in producing and section, fast in construction and in good quality. so, it has been adopted in many bridge ' s deep water foundation in our country

    鋼圍這種結構型式,製造及拼裝都很方便,施工速度快,質量好,因此國內多座梁的深水基礎相繼採用了這一結構形式。
  11. Based on the construction practice of steel cofferdam for pier base of main pier no. 6 close to the pylon of sutong bridge, the key techniques for design and construction of the deep water double - wall steel cofferdams of the bridge are described

    摘要以蘇通大近塔墩主6號承臺鋼圍工程實踐為基礎,介紹該深水雙壁鋼圍設計、施工的關鍵技術。
  12. Abstract : the steel cofferdam used for the construction of the main pylon of junshan changjiang river highway bridge is designed as a combination of circular - form and special form in one unit to satisfy the different requirements in different construction - stages

    文摘:武漢軍山長江公路大主塔墩鋼圍巧妙地將圓形和異形結構結合在一起,以滿足不同施工時期的需要。
  13. At first, i analyses the geological characters, and studies the procedure of the construction of deep water pile foundation of the highway bridges. then i put forward two programs of the construction in this condition : one is the construction of the steel round the barrage before the bore peg ' s, the other is on the contrary, and compare the shortcomings and the advantages of those

    本文通過對巖溶地區公路梁深水樁基礎施工的地質特徵分析,研究了深水樁基施工程序,提出了在巖溶地質條件下先下鋼圍后施工鉆孔樁和先成樁后施工鋼圍的兩種施工方案,並對兩方案的優缺點進行了分析比較。
  14. Supervision and consultation projects completed : ( 1 ) jiangsu xindadou square ( 50, 000m2, two 30 - story buildings ), worked as chief supervision engineer ( consultation ) ; ( 2 ) " yanqiao overpass service center of xicheng highway ( the first overpass type service center on highway in china ), worked as chief supervision engineer ( consultation ) ; ( 3 ) the ninth 5 - year - plan updating technology project of huaiyin tobacco plant, 50, 000m2, worked as chief ( supervision and consultation ) ; ( 4 ) the softy testing, analysis and consultations of nanjing international conference and exhibition center, site - erected structure, 75m span steel roof truss ( the largest one in china ), worked as chief of test and consultation ; ( 5 ) " the consultation service of the testing, analysis and update technology of the reliability of the joints of intermediate floor slabs, beams and columns of base beam of sanshanjie station of nanjing metro " etc

    完成"江蘇新大都廣場( 5萬多平方米,二幢30層) "建設監理咨詢(總監) ; "錫澄高速跨線服務區(國內首座) "建設監理咨詢(總負責) ; "淮陰卷煙廠9 . 5技改項目( 5萬多平方米) "建築監理咨詢(總負責) ;主持了"南京國際會展中心75m跨鋼屋架(國內最大距)現場施工安裝結構安全性測試分析咨詢" ; "南京地鐵三山街站中樓板及底板樑柱節點構造技術安全可靠性的測試分析與技術改進咨詢服務"等項目。
  15. In this paper, by way of example of the elevated pile cap construction of sanmenjiang bridge in liuzhou city, the design and construction of the column steel boxed cofferdam of tensile and compressive type are introduced with particular details given to its design scheme, working principles, construction technology and construction key points, and the matters of attention in the construction with the cofferdam are expatiated as well

    以柳州市三門江大高樁承臺施工為例,介紹拉壓柱式鋼吊箱圍的設計與施工,重點介紹鋼吊箱圍的設計方案、工作原理、施工工藝及施工要點等技術細節,同時對鋼吊箱圍施工中的注意事項進行了闡述。
  16. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大高樁承臺吊箱圍的全結構模型,相對準確地模擬灌注封底混凝土后、抽除吊箱內河水后、承臺破冰體施工后等三種受力工況,並用模型進行了應力和變形的計算,計算各工況荷載作用於吊箱全結構箱體板面、內支撐、吊桿、懸吊頂梁、底梁等的應力和變形,並對比吊箱圍板面計算變形和施工實測變形,結果是吻合的;對大遼河特大高樁承臺輕型吊箱的穩定性進行了計算分析;論文研究工作表明,應用組合有限元方法計算大型施工結構問題具有現實意義。
  17. With reference to the hydrologic data and geologic conditions of the changjiang river over the years, this paper analyzes the features of and key technical problems to be resolved in the construction of in - water pier foundations in the north river branch of tianxingzhou changjiang river bridge. accounts for the construction organization principle preparation and construction implementation of the foundations, comparison and selection of working platform and steel cofferdam to be used at each pier site, and also summarizes the construction methods for the deep water steel cofferdams of the bridge

    摘要根據長江歷年水文資料、地質情況,分析了天興洲長江大北汊水中墩基礎施工的工程特點和要解決的關鍵技術,介紹了施工組織的原則制定和實施過程、各墩位平臺及圍的方案比選,總結了該深水鋼圍的施工方法。
  18. Its main span, which is 60m long, is made up of prestressed concrete continuous beam. the fourth pier, one of the main piers, adopts the compound foundation constituted with double - siding steel cofferdam and drilled shafts which stands on the deep - water and slopping river bed where geological condition is very complex, so the cofferdam has the trend of slippage

    渝懷鐵路第20標段阿蓬江大全長343 . 06m ,主跨為60m的預應力混凝土連續梁, 4 #墩是其一個主墩,基礎採用雙壁鋼圍與鉆孔樁相結合的復合基礎。
  19. Construction of cofferdam for piers nb44 sb44

    44號墩-圍建造中
  20. Pier 1, sb - cofferdam construction

    Sb1號墩-圍建造中