橋接區 的英文怎麼說

中文拼音 [qiáojiē]
橋接區 英文
bridge region
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 區名詞(姓氏) a surname
  1. A few blocks from the bridge lies one of the oldest bullring in spain

    的這邊幾個街著西班牙最老的舊城
  2. This structure connects the hamburg tree port area with a western motorway bypass.

    這座了漢堡自由港與西部南速幹道的支線。
  3. Major projects under planning include the traffic improvements to tuen mun road town centre section, reconstruction and improvement to tuen mun road, widening of the tolo highway fanling highway between island house interchange and fanling, the central - wanchai bypass and the island eastern corridor link, improvement to island eastern corridor between causeway bay and north point, central kowloon route, widening of gascoigne road flyover, route 4 between kennedy town and aberdeen and retrofitting of noise barriers on 8 existing road sections. hk - zhuhai - macao bridge hk project management office

    而籌劃中的項目有屯門公路市中心段交通改善工程屯門公路重建及改善工程舊政務司官邸附近道路交匯處與粉嶺之間的吐露港公路粉嶺公路擴闊工程中環及灣仔繞道和東走廊連路銅鑼灣至北角的東走廊改善工程中九干線加士居道行車天擴闊工程四號干線堅尼地城至香港仔及加建隔音屏障工程於八條現有道路。
  4. Construction of a single - lane road bridge of 70 m in length across the san tin eastern main drainage channel stemdc connecting an existing unnamed road along the eastern side of stemdc near the vha and tyr

    興建長70米並橫跨新田東面主要排水道的單線行車道路,以連沿該主要排水道東面近車輛輪候的現有未命名道路與淳裕路
  5. They are the natural highways of all nations, not only levelling the ground and removing obstacles from the path of the traveller, quenching his thirst and bearing him on their bosoms, but conducting him through the most interesting scenery, the most populous portions of the globe, and where the animal and vegetable kingdoms attain their greatest perfection

    它們是連所有國家的天然梁,不僅將土地沖刷得平整,從旅行者的腳下移走障礙,渴了給他水喝,累了載他一程,而且還領著他見識最迷人的風景,最熱鬧的地,最繁榮的動物和植物的王國。
  6. For hksar government s purpose, the amount of this percentage of the total aggregate net revenue generated by the lantau link has been used directly to pay down the outstanding balance of the account used by hksar government to pay for non - scheduled maintenance costs of the lantau link

    就香港特政府而言,青嶼干線產生的合計凈收入所佔百分比,已直用作支付青馬管制墊支賬戶的未償還餘額資料來源:香港五隧一有限公司章程
  7. Ma ” anshan green friend machine manufacturing corp. ltd. locates in the bowang special economic zone in the east suburb of ma ” anshan and enjoys transportation convenience

    馬鞍山市綠之友機械製造有限公司位於馬鞍山市東效博望經濟特工業園,距南京祿口國際機場僅18公里, 314省道貫穿工業並連蘇、浙、皖、滬,交通十分便利。
  8. The qing dao huan mold co., ltd. locates the qingdao economic development zone fuyuan industry garden, east the company meets the yellow island ferry, west the neighbour jiaozhou bay is high speed, south side front the bay port, north depends on periphery the cross sea big bridge the traffic convenience, the environment is exquisite

    青島華安模具有限公司位於青島經濟技術開發富源工業園,公司東黃島輪渡、西鄰膠州灣高速、南面前灣港、北靠跨海大周圍交通便利、環境優美。
  9. Enginuity, the ironbridge gorge museums - interactive, cutting edge centre will bring the traditional in line with technology with a bang

    喬治鐵博物館的互動式的尖端科技中心將用一聲巨響將傳統與技術連在一起。
  10. Shanghai gongkang urban industrial district located in miaohang town of baoshan. it is surrounded by changzhong road, gongkang road and the green belt of airport river. it is 1km between gongkang to gonhe elevated roadway and the light track, 3km to shanghai north suburb railway station, 7km to shanghai port, 10km to people square, 15km to hongqiao international airport and 55km to pudong international airport. it has obvious advantages in geography. the standardized factory buildings are suitable for urban industries

    場中路、北臨共康路、東規劃中的康寧路、西傍機場河綠化帶,交通四通八達;園距離共和新路高架,輕軌1公里、離鐵路北郊站3公里、離上海港7公里、離人民廣場10公里、離虹機場15公里、離浦東國際機場55公里,域優勢十分明顯,園內的標準廠房主要適合於都市型工業的落戶。
  11. The collapsible loess is often met during the construction of the high - grade highway in the loess area, and the main failure is the uneven subsidence of the roadbed and the culvert, which affects the safe usage of the roadbed and the culvert, etc. directed against this, based on the chankou - lanzhou freeway construction, the paper analyzes the application of the composite ground formed by lime - soil pile under the bridge and designs the project, discusses the rules of the contact pressure, the stress ratio of the pile and the soil, compares the p - s curves of one pile, the composite ground formed by one pile and the composite ground formed by two piles based on the in - situ plate loading test, evaluates the bearing capacity of the composite ground of the project

    黃土地的高等級公路建設中經常遇到濕陷性黃土問題,其病害類型主要是地基土受水浸濕后引起路基、臺、涵洞等的不均勻沉降,直影響路基、構造物等的正常使用。針對此問題,本文依託甘肅讒口至蘭州柳溝河高速公路建設工程,對基灰土樁復合地基應用的可行性進行了深入分析,根據具體工程進行了合理的設計與計算,並配合現場靜載荷試驗及壓力盒實測數據,探討了基底應力分佈規律,樁土應力比,變形模量的變化關系,對比分析了單樁、單樁復合和雙樁復合的p ? s關系,對基灰土樁復合地基承載力進行了整體評價。
  12. The main work and conclusion for this paper is as following : according to the flashover test results of several kinds of iced insulators under positive voltage and negative voltage, this paper obtained : for the single porcelain insulator, the single glass insulator and the composite insulator bridged completely by icicle, the metal cathode ' s strong ability of emission electron is the primary reason that results in the lower negative flashover voltage ; the position difference of the high resistance district in method anode side results in that porcelain insulator cluster and glass insulator cluster have an evident effect of polarity ; when less ice and no icicle at the brim of the sheds, due to numerous non - polar arcs on the composite surface, the effects of polarity of composite insulator was lost using the test method of the average flashover voltage in the freezing period, dc flashover performances were investigated of several insulators with some typical structures and different material

    本文的主要工作和結論如下:在人工氣候室內,根據不同覆冰絕緣子正、負極性下的閃絡試驗結果,得出負極性電弧金屬陰極的強電子發射能力造成了單片瓷、玻璃絕緣子及被冰凌的合成絕緣子有較低負極性冰閃電壓;正極性電弧金屬陽極側產生高電阻所處位置的差異使得瓷和玻璃絕緣子串具有明顯的極性效應;覆冰較少時,合成絕緣子表面出現數量較多的非極性電弧使合成絕緣子無極性效應。利用覆冰期內平均閃絡電壓的試驗方法,對不同材質和結構的絕緣子在覆冰、低氣壓和污穢共存環境中的直流閃絡特性進行了研究。試驗結果表明,直流平均閃絡電壓隨著海拔的升高、覆冰量的增加以及污穢度的增加而降低,且其特徵指數與絕緣子結構、覆冰量、覆冰狀態、污穢度等有關。
  13. Shanghai jinqiao export processing zone is the first state - level development zone named “ export processing zone ” that was approved by the center of pudong new area with a planned area of 20 square km, bordering lujiazui finance and trade zone in the west, waigaoqia free trade zone in the north and zhangjiang hi - tech park in the south

    上海金出口加工是1990年經國務院批準設立的第一個以「出口加工」命名的國家級開發,位於上海市浦東新踣,西連陸家嘴金融貿易,北外高保稅,南近張江高科技園,規劃面積20平方公里。
  14. Then on the evening of the 17th, mrs. pez received a very encouraging phone call informing her that a group of men from suretka had fixed the damaged bridges with their own tools and shovels, reconnecting their community with bribr

    17日下午, pez女士到一通令人振奮的電話,得知蘇瑞卡社的十幾位原住民同胞,以自備的工具與鐵鍬將損壞的梁修復,使得蘇瑞卡與布裡布里之間的交通再度恢復暢通。
  15. The beiren hotel is a two star hotel located on the zhong shan road, near the railway statione 2 km, near west hong qiao airport 5 km, near national road 204, 312, near motorway shangai - jia xing and snaghai - ningbo. a perfect choice for both the holiday or business travelers

    北人酒店集商務度假娛樂於一體,雄峙申城最大規范的中山北路物貿街,東鄰上海火車站,西距虹機場,北204 312國道和滬寧滬嘉高速公路,內環線高架與浦東開發緊密相連,輕軌明珠線鎮坪站一步之遙。
  16. An 18th century bridge over the gorge joins the old and new sides of the town

    一座建於18世紀的舊橫跨峽谷連新舊城兩
  17. Recently, i have received complaints from many members of the public that bicycles or trolleys, some of which being rather worn - out, are often illegally parked at railings alongside footpaths, in pedestrian subways and on footbridges in many places in tsuen wan, tung chung and tin shui wai of yuen long

    本人近日獲不少市民投訴,指荃灣東涌及元朗天水圍內多處經常有單車或手推車違法停泊在行人路旁的欄桿行人隧道內及行人天上,當中部分單車和手推車已經殘破不堪。
  18. Microscopically with cirrhosis, the regenerative nodules of hepatocytes are surrounded by fibrous connective tissue that bridges between portal tracts

    用顯微鏡觀察肝硬化,肝細胞再生結節被匯管的纖維結締組織包繞。
  19. It is a core and focus point. land use and land cover change have important significance on sustainable development

    土地利用與土地覆被變化過程不僅是自然與人文過程交叉最為密切的環節,而且是連域可持續發展同全球環境變化的中間梁。
  20. Firstly, the analyses on the dynamical response of the tsing ma bridge ( tmb ) under traffic loading are performed on the basis of the three dimensional finite element model of the full - scale structure of the bridge, and some regions critical to fatigue damage are determined from the result of the dynamical response. the hot spot stress approach is usually adopted in the fatigue design and analysis of tubular welded joints. to apply the hot spot stress approach for the fatigue evaluation of long - span suspension bridges, the fem is further used to determine the hot spot stress of the critical fatigue locations

    首先,在青馬大三維有限元模型和整體動力響應分析計算的基礎上進一步進行關鍵疲勞構件的局部熱點應力分析,對疲勞危險部位處的焊構件建立三維有限元模型,施加符合梁實際工況的載荷與位移邊界條件,進行局部熱點應力分析,確定這些焊構件內的名義應力和相鄰焊域內熱點應力之間的關系,得到相應的應力集中系數。
分享友人