橋接式雙工 的英文怎麼說
中文拼音 [qiáojiēshìshuānggōng]
橋接式雙工
英文
bridge duplex- 橋 : 名詞1. (橋梁) bridge 2. (姓氏) a surname
- 接 : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
- 式 : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
- 雙 : Ⅰ形容詞1 (兩個) two; twin; both; dual 2 (偶數的) even 3 (加倍的) double; twofold Ⅱ量詞(用...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
-
Brief introduction the model kx920 wheel is one of the series leading products made in our works that is well received both at home and abroad for its reaso - nable design, beautiful contour, and advanced norms. by adopting of three - ele ment torque converter, fixed - axle type pcwer shifing transimission box, in = bub reduction, double - axle drive, hinged frame, all hydraulic steering, and clamping brade. the loader has such features as : large power reseve, fi - neaccelerating performace, comfortable operation, wide field of vision, it " s muti = function, high - effic ient and flexible engineering machinery. mor - eover, it can be equipped with many kinds of working attachments such as flat fort, muti - fnction bucket, and snow plow, so it may be used for loading and unloading, transporting, piling and leveling materials in various kinds of projects. mines, enterprises and city. welcome friends both at ho - me and abroad to visit our factory and to order our products
Kx920裝載機是我公司生產的系列主導產品之一,該機設計合理,外形美觀,指標先進,在國內外享有盛譽.它選用三元件液力變矩器,定軸式動力換檔變速箱,輪邊減速,雙橋驅動,鉸接式車架,全液壓轉向,汽液鉗盤式四輪制動,手動鉗盤式停車制動,反轉連桿機構,動力儲備大,加速性能好,駕駛舒適,視野寬廣,是一種用途廣,效率高,機動靈活的工程機械.備有平叉,圓木叉,多用途斗,推雪板,側翻,抓草機等多種工作裝置,因此廣泛用於各類工程,工礦企業和城鎮的物料,垃圾裝卸,運輸,堆垛,平整等作業,歡迎國內外朋友們來公司參觀,選購According to the design theory of the cable - stayed bridge and to the feature of the cantilever construction the authors propose a construction control method called optimum completion state method ( ocsm ) for rc cable - stayed bridges in the proposed method, the optimum completion state is regarded as the final target of the construction control, and the optimum construction state at each construction stage is taken as the technical route the key of the method is to properly choose or adjust the cable forces the objectives function of optimization is to minimize the elevation error of the girder under the constraint condition that the internal forces ( bending moments ) of the girder are bounded the optimization variables are the cable forces on the basis of the above principles, a optimum model for a construction step is established and cable force adjustments can be found for each construction step in this model, the creep and shrinkage effects of concrete have been considered a bridge example is given which shows that the final state of the bridge is very close to the design aim and that this method is much better than the so - called double - control method the example is a good illustration of the soundness and practical value of the proposed method
根據現代斜拉橋結構設計理論和懸臂施工方法的特點,提出了以最佳成橋狀態作為施工控制的最終目標,以實施最佳施工階段為技術路線,以索力調整為核心內容的斜拉橋施工控制理論,簡稱為最佳成橋狀態法;以斜拉橋主梁標高誤差最小為目標函數,以主梁內力(彎矩)為約束條件,以索力為優化變量,建立了最佳施工階段的索力調整計算模型;推導了考慮徐變收縮效應的索力調整計算公式;用最佳成橋狀態法對一實橋工程進行了施工控制全過程計算研究,得到的成橋狀態與設計目標相當接近,優于該橋以「雙控」為控制目標的實測結果,有力地證明了本文方法的正確性及其工程實際價值
分享友人