橋樁 的英文怎麼說

中文拼音 [qiáozhuāng]
橋樁 英文
bridge pier
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  1. Directed against the problem on confirming vertical bearing capacity of large diameter cast - in - place pile in the west of coteau area of yunnan province, the paper, analyses the influence degree of the variety of soil physics and mechanics property in area geology condition on bearing capacity of pile foundation, through 5 piles " loading test ; the influence degree of construction technics on bearing capacity of pile foundation under the influence of every exterior factors ; the influence degree of grouting injection around the pile shaft on bearing capacity of pile foundation

    本文針對滇西山區大直徑灌注豎向承載力確定存在的問題,進行了5根試的靜載荷試驗,分析了區域地質條件下土的物理、力學性質的變化對基承載力的影響程度;地下水對承載力的影響程度;各種外部因素影響下,的施工工藝對承載力的影響程度;通過在體周圍土中注漿對承載力的影響程度。
  2. Test study on pile of hangzhou bay bridge

    杭州灣跨海大橋樁基承載力的自平衡試驗
  3. The major diameter filling pile drilling machine of qj250 - 1 type applies to major diameter bridge pier hole of various geologic conditions such as ravelly ground, clay loam layer, sandy gravel, breaking layer and lithosphere as well as other various major diameter pore forming construction

    1型大直徑灌注鉆孔機適用於鬆散地層、粘泥層、砂礫層、破碎層和巖石層等多種地質條件的大直徑橋樁孔,以及其它各種大直徑成孔施工。
  4. Remedy of quality problem of pile diameter shrinkage

    清遠北江三橋樁基施工及質量控制
  5. Calculation of double coordinate system for curved bridge stake site

    橋樁位的雙坐標系計演算法
  6. Pile foundation drilling construction plan of kekexili 2 large bridge in qiangzang railway

    青藏鐵路可可西里2號特大橋樁基鉆孔施工方案
  7. Looking down over the rails, prince nesvitsky saw the noisy, rapid, but not high waves of the enns, which, swirling in eddies round the piles of the bridge, chased one another down stream

    涅斯維茨基朝著欄桿向下望了一眼,看見恩斯河上湍急的喧囂的浪濤,然而浪頭不高,在橋樁四周匯合起來,泛起了一片漣漪,然後折回,後浪推前浪,奔騰不息。
  8. On the basis of summarizing the current studies, some typical practical cases and treatment methods are introduced, some key problems encountered in the present studies are put forward and some new ways for researching are expected for the future

    在分析地鐵施工對鄰近橋樁影響研究現狀的基礎上,介紹典型實例和處理方法,提出目前研究中亟待解決的關鍵問題,並對未來的研究途徑做出展望。
  9. Regarding natural sand of the spot as model sand, using series model, and under the interaction of irregular wave and tidal current, a systematic test on scouring around pile of land - island approach bridge of jiangsu lng receiving station is carried out

    摘要以現場天然沙為試驗床質,利用系列模型,採用不規則波與潮流相結合的方式,對江蘇lng接卸站陸連島橋樁基周圍的沖刷情況,進行了系統試驗。
  10. The construction of pile fundation of overhead crossing bridge

    長安互通立交橋樁基的施工
  11. So carry through the construction technology of typical sect of natm by shallow - buried summary on west fourth ring road buried culvert of beijing branch of the middle line of south - to - north water transfer project, which would offer reference for future similar projects

    其中,暗涵工程交叉管線眾多,在西四環立交橋樁基中間穿過,淺埋暗挖法施工有一定的難度,為此,對南水北調中線北京段西四環暗涵淺埋暗挖典型段施工技術進行總結,以為今後類似工程提供參考和借鑒。
  12. The disposal of karst of constructing pile foundation of lushui river bridge of jing - zhu highway

    京珠公路陸水河大橋樁基礎的巖溶處治
  13. Construction of approach pile foundation of tianzhuangtai bridge of g305 line

    305線田莊臺大橋樁基礎施工
  14. This paper presents the selection of vibratory hammer types for construction of the pile foundations of dashengguan changjiang river bridge in nanjing and the problems and solutions to the problems encountered in application of model ape400b tandem vibratory hammers to the construction of the bridge

    摘要介紹南京大勝關長江大橋樁基施工作業中振動錘的選型,及ape400b型並聯振動錘在南京大勝關長江大施工中碰到的問題、解決的方法。
  15. Application of steel casing as formwork for construction of pile caps for sea crossing bridge of contract in hangzhou bay

    在杭州灣大橋樁基礎施工測量中應用
  16. Wrapped strengthening method of the foundation pile of dashib ridge in g105 national main highway

    105線番禺區大石大橋樁柱的包加固
  17. Abstract : it introduces the boring method under different geometric conditions and points to be noted in constructing foundation for piles of tieshan harbor bridge

    文摘:介紹鐵山港跨海大橋樁基礎不同地質情況下的鉆孔方法和注意的問題。
  18. Construction technology of pressure grouting on the base of pile in cross - sea bridge of hangzhou bay

    杭州灣跨海大橋樁底壓漿施工技術
  19. Research on the construction technology of pressure grouting on the base of pile in hangzhou bay cross - sea bridge

    杭州灣跨海大橋樁底壓漿施工技術研究
  20. The application of gps - rtk in pile foundation construction survey of hangzhou bay cross - sea bridge

    杭州灣跨海大橋樁底壓漿水泥漿的回收利用
分享友人