橋部 的英文怎麼說

中文拼音 [qiáo]
橋部 英文
hashibe
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : Ⅰ名詞1 (部分; 部位) part; section; division; region 2 (部門; 機關或組織單位的名稱) unit; mini...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉的發展及其施工工藝,並指出了梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大監控細則、組織機構及監控的主要工作和難點分;論文的核心分,在介紹了炳草崗金沙江大施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. Wherethe long bridge deck within 0. 5 l amidships is regarded as strengthdeck, the midship section modulus and minimum thickness of the deckplating comply with the requirements of 2. 2. 1 and 2. 4. 2. l of this ischapter

    例1 :在船中0 . 5l區域內的長樓甲板作為強力甲板時,其船中剖面模數及最小厚度應滿足本章2 . 2 . 1及2 . 4 . 2 . 1的要求。
  3. The paper is based on an arcuated built - up system bridge - zhongshan no. one bridge to be built in guangzhou, adopts the large universal finite element programme ansys, takes spatial action among members into account, establishes a three - dimension finite element model, and discusses the following several aspects : firstly, when three - dimensional finite model of a complicated bridge is founded, a beam - lattice method is a kind of applied and effective spatial analysis method, which is used to analyze superstructures of a bridge

    本文以廣州市中山一為背景,採用大型通用有限元程序ansys ,考慮構件間的空間相互作用,建立了三維的有限元模型,重點對以下幾個方面進行深入探討:首先,在對復雜的梁結構進行三維的有限元模型建立時,梁格法是分析樑上結構比較實用而且有效的空間分析方法。
  4. In the research area, the incised valley was formed during the sea level downwards and was provided source by the arenaceous river from qiaotou. it is stacked by 3 incised valleys formed in 3 different sequences

    研究區內子洲鎮川堡地區發育的下切河谷形成於海平面下降時期,來源於頭的砂質河流沉積,為疊置的、形成於三個不同三級層序底的下切河谷充填沉積。
  5. Assault troops were repelled from the west bank of the river before they were able to establish a firm bridgehead

    進攻的隊還沒來得及建立起堅固的頭堡就被從西河岸擊退。
  6. Assault troops were repulsed from the west bank of the river before they were able to establish a firm bridgehead

    突擊隊還沒來得及建一座堅固的頭堡就被從河西岸趕了回來。
  7. In single pylon cable stayed bridges, and cable stayed bridges without backstays, when the bottom of the tower bears the moment from the dead load, it is concluded that non - symmetric configuration of pile cluster corresponding to the upper structure is more practical than symmetric configuration of pile cluster

    當獨塔斜拉、無背索斜拉梁塔底永久作用有彎矩時,與完全對稱的基礎形式相比較,和上結構相協調的不對稱基礎形式更加適用。
  8. To improve the binding strength between the deck slabs and deck surfacing layer of badong changjiang river highway bridge and to provide the surfacing layer with anti - cracking ductility, a series of technical measures has been taken in the construction of the deck surfacing of the bridge, including those of embedding binding reinforcement in the deck slabs, spraying inorganic binding agent between the slabs and layer, replacing part of the cement with micro expansion agent and adding appropriate amount of polypropylene fibers to the concrete

    摘要巴東長江公路大面鋪裝,通過採取預埋面粘接鋼筋、噴塗無機界面粘結劑、用微膨脹劑替代分水泥、在混凝土中摻入適量的聚丙烯纖維等措施來提高面板與鋪裝層間的界面粘結強度和給面抗裂增韌。
  9. My conclusion is that the first goal must be to establish a bridgehead through which men and supplies can be funneled at speed.

    我的結論是,首先需要建立一個便於迅速運送隊和給養的頭堡。
  10. This was followed with the 6th fy activity and budget plans report by rwppi s secretary general, which was unanimously approved by the attending member company s clap of hands

    再下來,委託先鋒株式會社afm的佐先生作了第5屆決算報告,事務長做的第6屆活動計劃報告及預算草案也相繼通過。
  11. This structure connects the hamburg tree port area with a western motorway bypass.

    這座連接了漢堡自由港區與西南速幹道的支線。
  12. In 1928, freysinet used the cantilever concept to construct the springing of the arch rib in the plougastel bridge.

    在1928年,弗萊西奈運用懸臂的概念,在德國普魯加斯泰爾修築了拱的起拱分。
  13. The company has the department of aluminum door and window, department of curtain wall r d and department of aluminum curtain wall engineering. according the different regional requirements, it develops " xingqiu " series of aluminum door and window and large - scale curtain wall. lt can produce and process various high gas - proof, high strength and leakage proof push - and - pull windows, casement windows, heat insulation doors and windows and other patented products

    公司設有鋁門窗幕墻科研開發技術鋁幕墻工程,可按不同的地區要求研製「星球」系列鋁門窗及大型幕墻,可生產及加工各種高氣密高強度防滲推拉窗開平窗斷隔熱門窗以及其它專利產品。
  14. Repairing technical requirement for special equipment of bucket dredgers part 2 : guide wheel of bucket chain bridge

    鏈斗挖泥船專用設備修理技術要求第2分:斗導輪
  15. It is one of the big scale museums of henan province with brilliant buildings. the thirteen exhibition halls contain the art of stone carving of past dynasties, history of the song

    陳展大樓一樓大廳正面裝飾有大型黃楊木雕《清明上河圖》中的虹橋部分,反映了北宋東京的繁華盛況。
  16. This bridge was built in 1993. it was found that some problems such as twisting, departure and cracking occurred in 1 # and 4 # parts of curved girder bridge in 2000

    於1993年建成, 2000年初發現1 # 、 4 #預應力曲線梁橋部分發生側移及轉動現象,分帽梁和梁底出現裂縫。
  17. To pass over the east rail tracks and the slaughterhouse sidings, a new bridge with a clear span of 250 m will be required

    要興建一條這樣的高架墩無可避免會座落於屠房內,對屠房的運作造成干擾。
  18. Through the analysis and studying of this subject, we can make conclusion as followed : the condensation is getting severely impaired, adopt outside insulation treatment in the position of the thermal bridge, which is an effective measures to reduce the energy consumptions of the buildings " thermal bridge

    最後通過實例分析了熱橋部位採取何種保溫處理方法更有利於降低熱能耗,研究結果是:降低建築熱能耗的有效措施,是在墻體熱橋部位採用外保溫處理。
  19. I set up the mathematics model of heat transfer of the thermal bridge of the building and utilize numerical method to analysis whether occur condensation problem on the internal surface in the thermal bridge or not. through the analysis and studying of this subject, we can make conclusion as followed : because the internal surface of the bared wall body incline to be lower than the air dew point indoor, which apt to dew, with the reducing of out air temperature and increasing of the air temperature indoor

    另外,通過建立建築熱的傳熱數學模型,利用數值求解的方法,分析了外墻熱橋部位內表面是否結露的問題,研究得出裸露墻體內表面極易低於露點溫度而結露,並且隨著室外溫度的降低,室內溫度越高,外墻熱橋部位的內表面越容易結露。
  20. Environmental impact assessment exemption of shenzhen section of the shenzhen bay bridge order

    環境影響評估豁免深圳灣公路大橋部份令
分享友人