機加工時間 的英文怎麼說

中文拼音 [jiāgōngshíjiān]
機加工時間 英文
machining time
  • : machineengine
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • 時間 : time; hour; 北京時間十九點整19 hours beijing time; 上課時間school hours; 時間與空間 time and spac...
  1. Abstract : based on a numbers piled up for varies resources ( labor, materials, mechines ) in neuron plan, a composed distribution for various resources was obtained. then, using time difference and quantities of materials, the best selected work and time started as astrictive conditions, the best optimum distribution which satisfied variou resources in difference optimodel and astrictive conditions was got

    文摘:將多種資源(人、材料、械)的數量同在神經網路計劃技術上實行數字化疊,從而獲得多資源疊的合成分佈,再利用神經網路計劃技術中各個作的不同差和資源數量,按收斂條件選擇最佳開作和開,滿足多種資源在優化模式中按收斂條件進行最優分佈
  2. It will save considerable machining time to use more than one tool in one machine to perform several machine operations either in sequence or simultaneously.

    在一臺器上使用數種刀具來順次或同進行幾項器操作,將節省大量
  3. Abstract : on the basis of that the proportion of time spent sparking is analyzed in electrical discharge machining ( edm ) process, a new method. which is used to ascertain the trend of discharge gap change, is presented. and a fuzzy control strtegy is introduced to parctical use, the results is well

    文摘:通過對電火花成形放電狀態的分析,提出了利用分析周期內出現異常放電狀態的比例及開路狀態所佔的比例,來判別電火花成形隙放電狀態及其變化趨勢的方法,並在此基礎上利用模糊控制策略實現了對電火花成形過程中放電狀態的控制,取得了令人滿意的效果。
  4. Nowadays, the machining center carries through the precision inspection only following the fixed coordinates " axes, which can not completely reflects the real error of the spacial position of the practical machining outside the axes and leads to having no the directive relation between the inspected precision and the practical machining precision. so, this paper introduces that the error factors of influencing workpiece ' s outline on machining and carries out the solid inspection of every spot ' s error inside the workaround on the horizontal machining center

    本文針對當前中心僅沿固定的坐標軸線進行精度(含幾何精度和定位精度)檢驗,並不完全反映軸線外實際的空位置真實誤差,導致檢出精度與床實際精度無直接對應關系的現狀,論述了影響件型面輪廓精度之中心的誤差因素,對中心實施其作區內各點誤差的立體檢測。
  5. We show that under the consideration of discounted factor, jobs in the p - maximal initial set / * of module m should be processed prior to other jobs in module m, and the schedule is the optimal if the jobs in i * are n ' t be preempted by the jobs in n i *. this result is a extension of lawler ' s method for minimizing total weighted completion time with a series - parallel precedence

    證明了在考慮折扣因子的條件下,模塊m的因子最大初始集合i中的任務優先於模塊m中的其他任務,並且被連續所得的排序為最優排序:該結果推廣了lawler用來求解約束為串並有向圖的單權總完問題的由底向上搜索分解樹的方法。
  6. Measuring engine transient process data in ca1258p1k2l11t1 truck in accelerated mode, recording and analyzing the data, then analysis the test error. 4. building model and simulating two typical running mode ? fixed 6th gear acceleration with initial vehicle speed 40km / h and gear change acceleration starting with 2nd gear, comparing calculated result with test result, revising transient process simulation model and analyzing error between calculation

    本文基於ca1258p1k2l11t1載重卡車對ca6df2 - 26發動的瞬變況進行試驗和模擬計算,結果表明: 1 ) gt - power軟體可以很好的模擬、分析、預測發動瞬變過程,模擬計算的結果與試驗結果很接近,試驗證明,預測分析指出的改進方向是正確的; 2 )裝電動增壓器可以降低整車使用油耗,改善低速煙度排放,縮短,改善整車的速響應; 3 ) gt - power軟體預測分析配合發動和整車試驗是分析、解決發動瞬變過程的有力具。
  7. On the basis of computer simulation, the relationship among plasma channel, plasma configuration and the final crater are clarified

    根據計算模擬實驗,得出了短、長脈沖放電通道半徑、放電通道位形半徑以及最終放電痕半徑三者之的關系。
  8. In modeling, the machine shop based on the color petri net is researched ; in simulation, the object - oriented event activity scanning is used, time - a research is given based on the traditional control algorithms

    在建模方面,主要研究了基於賦色petri網模型的系統;在模擬方面,採用面向事件活動掃描模擬模型,在傳統模擬演算法的基礎上提出了- a模擬演算法。
  9. The result indicates : the new techno - logy of mechanical peeling, color and luster protection with an average of 2. 0 % humidity and hot wind plus microwave drying can replace the traditional processing, it shorten processing time, promots the processing efficiency

    結果表明,械去皮、 2 . 0 %噴淋均濕護色、熱風微波乾燥新藝能較好地替代傳統藝,並起到縮短、提高效率的作用。
  10. According to the number of processors, scheduling problem can be grouped as single - machine scheduling problem and multi - machine scheduling problem. according to whether the job ' s processing time, released time and the surroundings of the processors are deterministic or stochastic, scheduling problem can be grouped as deterministic scheduling problem and stochastic scheduling problem. according to whether the parameters of the jobs are given before - hand, scheduling problem can be grouped as static scheduling problem and dynamic scheduling problem

    按處理個數將排序問題分為:單排序問題和多處理排序問題;根據任務和到達以及處理作環境等數據是確定的或服從某種隨分佈可分為:確定性排序問題和隨排序問題;根據所有任務的參數是否是預先給定的可分為:靜態排序問題和動態排序問題。
  11. Single machine scheduling with precedence constraints and processing time dependent on starting time

    具有優先約束和依賴開的單排序問題
  12. Abstract : in this paper, we discussed a new kind of single machine scheduling problems with controllable processing times. the objective function being considered was the sum of weighted completion times of all jobs plus the maximum dissatisfaction of all jobs ' processing times that deviated from their specified ones. we presented a polynomial algorithm to solve the problem

    文摘:本文討論了一類新的可控的單排序問題.我們所考慮的目標函數由所有件的權完之和與對所有件的實際偏離額定的最大不滿意程度這兩部分組成.對此問題,我們提出了一個多項式演算法
  13. Multi - rule single machine scheduling problems with discretely controllable processing times are considered

    摘要討論了件具有離散可控的單多準則下的排序問題。
  14. In this paper, we address the single machine scheduling problem with discretely controllable processing times, our objective is to minimize the makespan plus the total processing cost

    摘要考慮離散可控的單分批排序問題,目標函數是極小化最大完費用之和。
  15. Abstract : a scheduling problem on the single machine with fuzzy processing time is studied

    文摘:研究單模糊下確定最遲開的調度問題。
  16. By considering both fuzzy processing time and fuzzy due date as well as specific operator of the workpiece with alternative machines, a fuzzy job shop scheduling problem with alternative machines was studied

    摘要在車實際中,件的和交貨期是一個模糊數,而且件的某道序有多臺器可供選擇。
  17. For instance, embranchment working procedure, embranchment point working procedure, working procedure total, working procedure and correspond process time. moreover, this thesis worked out priority area chart. it was based on successively sequence of process manufacture and principle to lessen number of one man working more machine to the best of our abilities

    從預處理過的序分析表可以找出分支序、分支點序、序總數、各序及相應序的等數據信息,另外根據的先後順序和盡量減少一人多的原則,做出了優先權區域圖。
  18. First we give some notations : where r lti : the load of the machine at step t ( i. e., immediately after the ith job has been scheduled ) optt : the current optimum makespan in step t ( for the job set { j1 ; …, jt } ) lbt : the lower bound of the length in step t for a set of jobs with processing times p1, …, pn, there are three straightforward lower bounds for the makespan of any preemptive schedule on m identical machines : max so we have lb = max ( 3. 2. 1 ) the algorithm will schedule jobs in such a way that, at any step t algorithm : a new job jt + 1 ( which arrives at time t + 1 ) is assigned as follows : step 1 compute the new lower bound lbi + 1 according to ( 3. 2. 1 ) step 2 research the following reserved intervals

    n個件人; … ;人,每個件是在線到達( oneb , olle )且可打斷的,器人人的準備為az ,怎樣安排順序,使件的最大完( makespan )盡可能地小,稱此問題為帶器準備的平行在線排序問題。它是帶器準備的平行排序和平行在線排序問題的綜合和推廣;具有廣泛的應用背景。這里件在線到達( onebyone )指的是件的情況並不是提前知道的,只有將件jj人安排完以後我們才能知道jj的一些情況p件的p 。
  19. By normalizing all job sizes and machine cost, we assume that the cost of purchasing one machine is 1. we further know the total size of all jobs in advance

    通過標準化所有件長度和器費用,我們可假設購買一臺器的費用是1 .所討論的半在線模型假設已知所有件的總
  20. We are given a sequence of independent jobs with positive sizes, which must be assigned to be processed on machines

    給定一個件序列,每個件都有非負的長度即,並且必須分給
分享友人