機動抽水機 的英文怎麼說
中文拼音 [jīdòngchōushuǐjī]
機動抽水機
英文
engine driven pump- 機 : machineengine
- 抽 : 動詞1 (把夾在中間的東西拉出; 提取) take out (from in between) 2 (從全部里取出一部分; 騰出) ...
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 機動 : 1 (利用機器開動的) motor driven; motorized2 (權宜; 靈活) flexible; expedient; mobile; manoeuv...
- 抽水機 : hydro-exhauster
- 抽水 : 1. (用水泵吸水) draw [pump] water 2. (縮水) (of cloth through wetting) shrink
-
By using questionnaire, i investigated 950 students, from grade 5 of primary schools to grade 3 of middle schools, of 8 schools located in changsha city and in lengshuitan district, yongzhou city. lots of materials in this paper were collected by group meeting and individual conversation, including many aspects of their outside reading : the interests and the motives, the time and, the content, the habits and the methods, the efficacy and the guidance, etc. a thorough, detailed analysis. and research of the present situation of outside reading of students was conducted in the current free educational period
本文採用問卷調查法,以長沙市和永州市冷水灘區八所學校的小學五年級到初中三年級共950名學生為對象抽樣調查,並輔以座談和個人談話法收集了大量的資料,從課外閱讀的興趣與動機、時間與內容、習慣與方式、效能與指導等方面對當前義務教育階段的學生課外閱讀現狀進行了較全面、具體的分析與研究。In this paper, the design philosophy and configuration of the power generation / motor - transformer group relay protection, as well as the design characteristics of the protection system for the pumped storaged units in huilong power station
文章介紹了回龍電站發電電動機變壓器組繼電保護的設計原則、配置方案及抽水蓄能機組保護的設計特點。The engine draws water along the pipe.
發動機將水沿管道抽來。The overhaul of power units are arranged in terms of peaking capacity balance and the power loads are dispatched based on the principle of equal incremental coal consumption rate in the new method, which is anticipated to solve the economic operation of the power system
實際上,抽水蓄能電站的容量效益與電網的負荷水平、負荷曲線形狀和常規水電的比重有關,而節煤效益除與負荷水平、負荷曲線形狀有關外,還與電網的電源結構、火電機組的動力特性有關。Start - up test code for reversible pump - storage units
可逆式抽水蓄能機組起動試驗規程Diamond press machine, synthetic diamond and its products various pressure containers other produts sucker rods, various derricks, drilling tools, hydraulic jacks, water swivels, hydraulic breakout tools, hydraulic pumping units and so on
該廠的主要產品有:地質巖芯鉆機工程施工鉆機水文水井鉆機汽車鉆機鉆塔泥漿泵金剛石壓機人造金剛石及製品液動螺桿鉆泵井壁管和抽油桿以及一Condition monitoring, analysis and diagnosis system of a 300 mw pumped storage power unit
抽水蓄能機組振動狀態監測分析診斷系統研究This was invented that first taiwan uses the solar heating air to expand acting and machine drawn water initial stage to the men that solar energy uses from 1615 france engineer luo virtue cock, and the mankind directly use solar energy as the one kind of sources of energy and motive force, and has had the history of more than 300 years
太陽能的利用從1615年法國工程師所羅門?德?考克斯發明了第一臺利用太陽能加熱空氣膨脹做功而抽水的機器開始,人類將太陽能作為一種能源和動力直接加以利用,已有300多年的歷史了。The development of solar energy cell : from 1615 this was invented that first taiwan uses the solar heating air to expand acting and machine drawn water initial stage to france engineer luo men virtue cock, and the mankind directly use solar energy as the one kind of sources of energy and motive force, and has had the history of more than 300 years
太陽能電池的發展:從1615年法國工程師所羅門?德?考克斯發明了第一臺利用太陽能加熱空氣膨脹做功而抽水的機器開始,人類將太陽能作為一種能源和動力直接加以利用,已有300多年的歷史了。Research on a novel control method of a hf link dc ac converter
勵磁控制下抽水蓄能電機靜止變頻器起動研究The paper is written by way of background as remote monitor system in tianshi pump station as well as my own factual labor fruit, in order to carry on discussing about research and construction of remote monitor system for large - scale pumping station. the paper mainly deals with five aspects : 1. describing problems existed now and trend in the future on remote monitor system for large - scale pumping station. 2. providing network integration project of constructing remote monitor system for large - scale pumping station
本文是以田市抽水站遠程監控系統為背景,結合筆者實際工作成果所撰寫的,旨在對大型泵站監控系統的建設進行研究與探討,全文主要涉及到以下五個方面: 1 、論述了大型泵站監控系統目前存在的問題和今後發展趨勢; 2 、提出了組建大型泵站監控系統的網路集成方案; 3 、提出了利用com 、 dcom 、 activex 、 opc組件技術實現各種監控系統之間的集成方案,並在田市抽水站實現閉路視頻監控網路、配網自動化網路和機組控制網路的無縫集成; 4 、進行監控系統通訊軟體分析與開發,實現監控系統與第三方設備通訊; 5 、結合大型泵站一般特點,引入聚類融合控制,實現田市抽水站的機組優化控制。These include operations and maintenance services for key airport authority engineering plant and systems such as airfield e & m installations and systems - - airfield lighting, airfield hvlv & emergency power generating systems, aerobridges, preconditioned air systems for planes, trunked mobile radio system, baggage handling system, aircraft parking aids, pumping systems, air - conditioning system in the passenger terminal building, as well as wastewater treatment plant
而服務所涉及的主要設施則包括飛行區照明系統、高低壓及緊急供電系統、登機橋、為停于地面的飛機提供預校空氣系統、集群流動無線電通話系統、行李處理系統、飛機停泊輔助設施、抽水系統、機場客運大樓空調系統以及污水處理廠。To be the chief technical principal in charge of the research and development of the pumped - storage unit control ; and in charge of major research subjects and to be engaged in the technical research and development of the automation and control system for the pumped - storage unit
抽水蓄能機組控制研發技術總負責,重大課題技術負責人,從事抽水蓄能電站機組自動化及控制系統的技術研究與開發。Meanwhile coaxial line phase water cut meter has realized dynamic measuring of oil well water cut. and the detecting results objectively represent flowing state in pumping wells
同軸線相位法含水率計實現了油井含水率的動態測量,其測量結果客觀反應了抽油機井中油水兩相流動狀態。We are responsible for maintaining including provision of monitoring services to more than 130 area traffic control junctions, road tunnel equipment pumping systems to avert flooding, highway lighting, toll collection systems as well as traffic control and surveillance systems in hong kong, kowloon and the new territories. working with our major customers in these areas, the transport and highways departments, we also help to spearhead the introduction of new technology, such as the evolution of hong kong s traffic lights from electro - mechanical to electronic models
我們並負責維修及監察港九、新界共130個道路交界處、行車隧道抽水系統、交通燈、收費系統及交通控制監察系統。我們的主要合作對象是運輸署及路政署。我們亦率先協助推動將本港的交通燈由機電型更換為電腦控制型。The first stage of extensions started in 1974 and was completed on 26 november 1978. the main works were based on the original system with the addition of 7 pump sets and the additional small reservoirs. the cost for the engineering works was 14, 830, 000 rmb
東深工程曾擴建三次,第一期擴建工程於1974年開始動工, 1978年11月26日完工,主要是按原規劃加建7臺抽水機及增建中小型水庫,工程費用達人民幣1 , 483萬元。The addition of two steam - driven pumps that could transfer 3, 000, 000 gallons of water per day ; and
增設兩套每天可抽調300萬加侖食水、由蒸氣推動的抽水機;Targeting at the appraisal for economical benefit and performance of pumped storage station ( so called pss ), the writer carried out a comprehensive analysis of static and dynamic benefit and performance on the basis of the practices of reform in china ' s electric power market and specific appraisal cases for pss in the past. then under the condition of separation of generation and grid, the writer defined the integrate economical benefit and performance of pss for the possible parts concerned, as while, taking both the current practice and the possible mechanism for investment, operation and price - determination, the writer described relevant industrial policies and gave a policy suggestion
本文針對抽水蓄能電站的經濟效益評價問題,結合我國電力市場改革的實際,在以往抽水蓄能電站經濟效益評價的基礎上,對其靜態效益和動態效益進行了全面的分析,並考慮在廠網分開條件下,針對不同利益主體對抽水蓄能電站的綜合經濟效益進行界定,同時結合現實以及可能的投資運營管理模式和價格機制,探討了的相應的配套產業政策,並提出政策建議。Since february 2002, twd has used the water supply system operating mode of advanced countries as a reference and compared them with the consumption characteristics in our jurisdiction. twd flexibly adjusts the pumping operation during peak times and low times to meet water pressure demand and reduce loss of water resources
自91年2月起,參考先進國家供水系統操作運轉模式及考量轄區用戶用水特性,于尖離峰時段機動調整抽水機運轉,以滿足轄區水壓需求,並減少水資源流失。Operations of the power corporation include power energy sending, purchasing, selling, pumped storing and timed balancing. in the model trading price and trading quantities of all operations are considered as model parameters, as well as operating profit as model objects. at the same time the response of user rose by price quivering, generation cost curve and unit parameters of independent power plant and pumped storage are considered as restriction
帶獨立電源電力公司包含上網、購電、售電、抽水蓄能和實時平衡等運營業務,模型以各業務環節中的交易電價和交易電量為參數,以電力公司日運營收益最大為目標,並考慮了用戶對電價波動的響應以及獨立電廠、抽水蓄能電廠的發電成本曲線和機組參數等約束條件。分享友人