機組容量 的英文怎麼說
中文拼音 [jīzǔróngliáng]
機組容量
英文
capacity of sets-
Accurate load forecasting is helpful to planning generators " starting and stopping in the interior of the electrical networks economically and reasonably, preserving the security and stability of power system, reducing the unnecessary circumvolving repertory capacity, making planning to overhaul the units in reason, ensuring the normal production and life of the society, effectively reducing the cost of generating electricity, increasing the economical and social benefit
電力負荷預測是供電部門的重要工作之一,準確的負荷預測,可以經濟合理地安排電網內部發電機的啟停,保持電網運行的安全穩定性,減少不必要的旋轉儲備容量,合理安排機組檢修計劃,保證社會的正常生產和生活,有效地降低發電成本,提高經濟效益和社會效益。With the developing trend of large size and large capacity, the turbine ' s natural frequencies are decrescent, maybe reaching the input forces " order of magnitude. so, it is becoming more and more important to analyze the stability of a turbine
隨著水輪機組朝著大尺寸、大容量的方向發展,其自身的固有頻率也隨之降低,與干擾激振力的頻率屬于同一數量級,因此,水輪機組運行的穩定性就變成更為重要的問題。Along with the a enhancing proportion of hydroelectricity in the whole electricity system in our country, the increase of the single unit capacity, the faults ratio of the large - scale hydropower units is more and more important to the whole system safe operation, if we do n ' t manage it well, it will cause the collapse of the whole system and bring a great loss of country ' s economy, hi addition, accompany with " to dispart plant and grid, connect to the grid according to the price " put into practice, how to control the production cost of the power plant has to be put into consideration
隨著我國水電在系統中所佔比重的增加及單機容量的增大,大型水電站和機組的故障率對系統的安全運行也越來越重要,如果處理不好,甚至會引起整個系統的崩潰,給國家帶來巨大的損失。另外,隨著我國「廠網分開,競價上網」的逐步實施,如何控制發電廠的生產成本,也將提上各個電廠的議事日程。The main computer is programmed under windows, while the assistant computer is programmed under dos. the last, based on the idea of module - structure, the software of the testing system are designed, thus this software system is compatible and transplantable to design again. the experiment of measuring principle is taken : take the xy flat of lathe as the parallel - pole device and adjust the angle of sensor, the rotating - probe can test the felloe mould in scanning way
藉助虛擬儀器的思想,對測控系統進行了設計:採用光柵尺、光電編碼器測量可動部件的運動量,解析度高、誤差小;採用細分驅動的步進電機裝置,控制性能好;系統實施環境溫度的檢測、補償,提高了檢測精度;基於兩級微機組建測控系統:主機為人機界面,採用windows編程,從機用dos編程,實時性好;軟體設計採用兼容性和移植性好的模塊式結構,便於二次開發。With increasing of capacity of power grid, every unit may turn into peak load unit
隨著電網容量的不斷增長,各類機組都會參與調峰。Finding a feasible and efficient load balanced strategy for the ultra - scalable multi - plane multi - stage switch architecture is a top of nowadays research. the dissertation proposes a two - stage load balanced scheme for the ultra - scalable multi - plane multi - stage switch architecture based self - routing and non - blocking permutation benes network. the approach uses reasonable and efficient logical queueing strategy and schedule scheme in ingress traffic managers and switch planes to realize the two - stage load balancing of ip traffic which for different destination addresses
本文提出一種適用於基於完全可重排無阻塞benes拓撲構建的多平面多路徑(多級)超大容量交換結構的兩級負載均衡策略,通過在輸入流量管理器和benes交換平面內部實施合理而高效的隊列組織調度方法,有效實現了基於不同目的地址的ip流量在兩個層次上的負載均衡,較好彌補了ciscocrs - 1系統在平面選擇和中間級選擇時所採用的簡單隨機或輪循方案的不足。With aggrandizement of capacity and ascent of automating the degree of modern power station machine unit, the quantity of the power station cable also increasing quickly
隨著現代電廠機組容量的增大和自動化程度的提高,電廠電纜的數量也大幅度增加。3 ) the content of generator module design includes the design factor, design outline, software design and experimentation. the generator module must complete the analog signals calculating, and make an order for shutting off connected generators in the condition of generators settings, concatenated logics and switch signal input, then communicate with the decision module
3 )發電機模塊的設計內容包括設計考慮因素、設計要點、軟體設計以及實驗驗證等,模塊必須完成對接入的發電機機組模擬量的計算;在機組設置、連鎖邏輯和開入信息等條件下對接入的發電機機組排出一個切機順序;完成模塊間通信。Further investigated and analyzed composition structure and flow data that dsa ' s formation of image is systematic at first in this paper, carried on intact summing up to the data in the system, having given out the plan of design of high speed and large capacity data channel of digital formation of image system of x - ray ; deeper discussion of control way on sdram, give solution that many pieces of sdram works togetherses of realizing heavy capacity, designing of heavy capacity deposit board realize storing at a high speed to vision data by frame on the basis of this ; through further investigations of interface of pci bus, optimize back end state machine design and urge procedure making with lower, giving intact pci interface scheme that realize high speed dma data transmission and satisfy request of video transmitting ; further investigate the figure systematic design method of programmable logic devices, due to the difficult point of drifting about of enabled signal in fifo in common use and setting up and keeping of output signal, method has been proposed of improving stability of system making use of signal utilizing the phase locking ring in fpga to offer a lot of clocks to move thus realize coordinating the data between every module of system to transmit at a high speed by making use of fifo
本文首先對數字減影血管造影( dsa )成像系統的組成結構和數據流向進行了深入研究和分析,並對系統中的數據流向進行了完整的歸納和總結,給出了x線數字成像系統中的高速大容量數據通道的設計方案;在對sdram的控制方式做了深入探討后,給出了實現大容量多條sdram共同工作的解決方案,在此基礎上設計了大容量幀存板實現對圖象數據進行高速存儲;通過對pci總線介面的深入研究,優化後端狀態機設計和低層驅動程序開發,給出了完整的pci介面方案實現高速dma數據傳輸,完全可以滿足視頻傳輸要求;深入研究了基於大規模可編程器件的數字系統設計方法,針對通用fifo使能信號漂移、輸出數據難于建立和保持等設計難點,提出了利用fpga中的鎖相環提供多個時鐘相移的信號來提高系統穩定性的解決方案,從而實現利用fifo來協調系統各模塊之間的數據高速傳輸。Exchangeable aluminium, humic acid component content in rhizosphere soil and non - rhizosphere soil, activity acidity, organic matter content, humus component content, total amount of fifteen types of amino acid, the content of various forms of phosphorus, the amount of three main types of microbes, enzyme activity, and bulk density in non - rhizosphere soil increased
根際和非根際土壤交換性鋁含量、胡敏酸組分,非根際土壤活性酸、有機質含量、腐殖質組成、 15種氨基酸總量、各磷形態含量、三大土壤微生物數量、酶的活性和土壤容重增加。Mongolica young stand, secondary natural forest, and the mixed forest of larix olgensis and fraxinus mandshurica rupr. countermeasures for controlling soil degradation were also recommended. the study got following results : ( 1 ) from young stand to mid - age of larix olgensis, with the closure of canopy and the decrease of undergrowth vegetation cover, soil acidity, enzyme activity, total inorganic phosphorus, available k, soil moisture and total porosity decreased significantly ; while soil organic matter content, humus component content, the amount of three main types of microbes, acid phosphatase activity, and bulk density in rhizosphere soil and non - rhizosphere soil increased with the increase of the amount of forest floor litter ; from mid - age stand to near mature stand, with the decrease of stand density and crown cover as well as the restoration of undergrowth vegetation after preliminary thinning, soil organic matter content, fulvic acid, exchangeable acidity, exchangeable aluminium, neutral phosphatase activity, total amount of inorganic phosphorus, the amount of actinomycetes, soil moisture, and total porosity in rhizosphere soil and non - rhizosphere soil apparently increased ; from near matu re stand to mature stand, soil activity acidity, organic matter content, humus component content, available phosphorus, total amount of amino acid, available k, soil enzyme activity, soil moisture, and total porosity in rhizosphere soil and non - rhizosphere soil decreased, but total phosphorus, soil acidity ( in particular, exchangeable aluminium ), and bulk density increased
結果表明: ( 1 )從落葉松幼齡林到中齡林,隨著林冠的郁閉和林下植被蓋度的急劇下降,林地土壤酸度、土壤酶活性、無機磷總量、速效鉀、土壤水分含量、總孔隙度呈明顯下降趨勢,而根際和非根際土壤有機質含量、腐殖質各組分含量、三大類微生物數量、酸性磷酸酶活性和土壤容重隨著凋落物的增加呈明顯上升趨勢;從中齡林到近熟林,由於撫育間伐,林分密度及郁閉度下降,林下植被蓋度逐步得到恢復,根際與非根際土壤有機質含量、富里酸、交換性酸、交換性鋁、中性磷酸酶、無機磷總量、放線菌數量、土壤水分含量、總孔隙度呈明顯的上升趨勢;從近熟林到成熟林,隨著林齡的增大,根際與非根際土壤活性酸、有機質含量、腐殖質各組分含量、有效磷含量、氨基酸總量、速效鉀、土壤酶的活性、土壤水分含量和總孔隙度呈下降趨勢,而根際與非根際土壤全磷含量、土壤酸度(特別是交換性鋁)和容重呈增加趨勢。With the development of the electric power system, static - state reactive power compensators ca n ' t have met the requirements of the actual production and operation, and the trend to the fast and dynamic compensation for reactive power become greater and greater. since ertan hydroplant and 500kv transmission systems in sichuan power system have been operated, many power plants of load center are forced to halt during the high - water period, because the great deal of power is transmitted to far - distance load center. thus the load center loses voltage sustentation and the level of the system stabilization is debased greatly
四川電網的二灘水電站和500kv輸變電系統投入運行后,由於二灘水電站的大量電力遠距離輸送至負荷中心,迫使負荷中心的火電機組在豐水期大量停機,使負荷中心失去電壓支撐,大大降低了電網的電壓穩定水平;同時,因為四川電網中的無功補償裝置全為靜態無功補償電容器(或電抗器) ,這些設備只能在系統正常運行狀態下起到無功補償和電壓支撐的作用,而在電網出現事故時,不但不能起到電壓支撐作用,反而會促使電網電壓崩潰事故的發生。On the basis of this theory, the applications of the sdr structure of wideband and bandpass sampling in if ( intermediate frequency ) in flight test were offered : increase the sampling in if ( intermediate frequency ) in flight test were offered : increase the capacity of the transmitter and the terminal receiver channels without changing the apparatus of original system and on the conditions of obeying the standard remote sensing
首先對軟體無線電的組成結構和飛行測試中實際使用的通道進行了闡述,在此基礎上提出了基於寬帶中頻帶通采樣軟體無線電結構在飛行遙測測試中的應用,在不改變原系統設備的情況下,在遵守遙測標準的前提下,提出增加機載發射機和接收機通道容量的設計方案。The impulse type turbines made by ganfa, are ranging form 80 to 1, 000m in water head, 200kw to 20mw in capacity and 0. 55 to 2. 3m in runner diameter
我公司生產的沖擊式機組適應水頭801000m ,轉輪直徑0 . 552 . 3m ,容量20040000kw ,根據安裝方式分為立式臥式兩種,有單噴嘴雙噴嘴和多噴嘴。The work principle of dual stator - winding induction generator system, and the researches on practical application of dual stator - winding generator system are analyzed in detail. aimed at the work condition of wide rotor speed and optimization of static reactive power generator ’ s volume, the performance of dynamic state and static state and optimal control of high - voltage dc generator system based on dual stator - winding induction generator, are studied in this paper. these researches not only achieve the work characteristic of dual stator - winding induction generator system, but also set up the foundation of optimal design of dual stator - winding induction generator and engineering realization of dual stator - winding induction generator system used in wind generating
本文闡述了定子雙繞組發電機的基本工作原理,基於matlab軟體建立了定子雙繞組感應電機發電系統的模型,並在此基礎上詳細分析了定子雙繞組感應電機發電系統的工作機理、影響兩套定子繞組容量比的因素等,從而摸清了該系統的特性,尤其是定子雙繞組感應電機高壓直流發電系統在變轉速、變負載下工作的特性,從而為該系統的工程實現奠定了重要的理論基礎。The study has completed the design of two - phase inverter and made up of the two - phase inverter - motor system for experimental use it is a variable frequency adjustable speed system with a open - loop control of rotational speed, which consists of voltage - controlled oscillator circulating assign device inverter circuit and two - phase induction motor a accurate mathematical model is set based on the whole system, and simulator program of dynamic and steady condition is established, which is used to calculate the dynamic and steady performance by kron and symmetrical coordinate converter by simulator calculation and experimental research with specific parameter of the system, a comparison is made between predicted and experimental characteristics, experimental measurements are shown to compare closely with corresponding theoretical result it is compared with some variable frequency adjus table speed system comprising inverter and single - phase induction motor from the system efficiency torque pulsation and the effect of two - phase inverter capacitance based on the conclusion, harmonic cancellation pulse width modulation control of a two - phase inverter - fed induction - motor drive system is researched, which cancelled the low harmonic and improve the system performance
通過對電機的kron變換和對稱分量變換,建立了系統較精確的數學模型,編制了系統動態及穩態運行的模擬計算程序分別計算系統的動態和穩態性能。通過對系統的具體參數進行了模擬運算和實驗研究,實驗和模擬結果進行比較,說明實驗和理論較為一致,並從系統效率、轉矩脈動及兩相逆變器電容的影響等方面與各種逆變器和單相異步電動機組成的變頻調速系統加以比較。在此基礎上,對兩相逆變器供電-異步電動機系統使用諧波抑制pwm控制進行了研究,由於減少了低次諧波,改善了系統性能。Benefited from the ceaseless development of information technology and control technique, research on grid - connected wind power generation has been in fast progress, with commercial application from several kilowatts up to more than one megawatts per unit, and category of controls from stall type to pitch regulation type up to the state - of - the - art varying speed type
隨著計算機與自動控制技術的飛速發展,風力發電技術的發展極為迅速,其單機容量從最初的數十千瓦級發展到最近進入市場的兆瓦級機組;控制方式從基本的定槳距失速型控制向變槳距控制直到最新的變速控制發展。With the increasing of capacity of hydrodynamic motor generator, water turbine ' s blade run in villainous environment. it is n ' t advantageous to the safety of the blade
隨著水輪發電機組容量的不斷增大,水輪機葉片處于更為惡劣的環境中運行,這對葉片的安全十分不利。Along with the raising of parameter and the increase of unit capacity, it is more and more complex to start and run, the safety of unit also becomes more and more important the mechanical regulating system of fluid pressure type that adopts always can not be already complete to satisfy the requirement of production, especially the generation set of large scale power plant
隨著機組容量的增加和參數的提高,啟動和運行變得越來越復雜,機組的安全性也變得越來越重要,一直採用的機械液壓式調節系統已不能完全滿足生產的要求,特別是大型火電發電機組的要求。Severe accidents are still repeatedly seen in domestic made generator sets, even in imported sets. for an coal fired power plant, this problem is still making troubles threatening power plant safety, economics and reliability ; with the increase of generator set capacity, this problem is becoming more and more prominent
爐內嚴重結渣問題仍然在國產機組中屢屢發生,甚至在一些進口機組中也經常出現,燃煤電廠爐內結渣仍然是一個多發性難題,嚴重影響機組運行的安全可靠性和經濟性;而且隨著機組容量的增加,這一問題的嚴重性更加突出。分享友人