橫向坡 的英文怎麼說

中文拼音 [héngxiàng]
橫向坡 英文
cro fall
  • : 橫形容詞1. (蠻橫; 兇暴) harsh and unreasonable; perverse 2. (不吉利的; 意外的) unexpected
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • 橫向 : broadwise; infeed; crossrange; abeam;transverse; transverse direction; cross; crosswise; lateral;...
  1. 4 ^ included the content of single - picture rectification, image enhance, cutaway view of cavity, all kinds of image revelation through mosaic, and dsm collection of tunnels, many image processing method is studied. 5 ^ the paper introduces the method of photogrammetry geology catalog. all kinds of projective graphs in various layers are received

    不同洞型影像的幾何糾正;不同邊影像的幾何糾正;糾正或鑲嵌像片的影像增強;洞室編錄縱/剖面圖;影像鑲嵌分別得到洞室影像展示圖、面正射影像圖、面正射影像鑲嵌圖;基坑的像對定及dsm生成; 5 、研究了基於影像的地質編錄。
  2. When change cross fall and stroke still might maintain the surface of bed movement balance ; the spring lays aside in box in vivo ; the structure is compact, also it could obtain the final ore concentrate and the final debris onetime

    在改變橫向坡度和沖程時仍可保持床面運行平衡,彈簧放置在箱體內,結構緊湊,且能一次得出最終精礦和最終尾礦。
  3. Often lack of fusion adjacent to the girder web in the transverse groove welds led to the cracking.

    在靠近主梁腹板的橫向坡口焊縫處常常出現未熔透而導致裂紋。
  4. A cross slope of one in fifty is usually enough.

    通常150的橫向坡度就已足夠。
  5. Of an angle of over 70 degrees are ever - present while the south - west side is blanket - ed in snow all the year round. halfway up the mountain, ravines abound and gulles crisscross. " rolling stone " and " wolf s fang " areas scattered with huge rocks from t

    雪寶頂東北為70度以上的懸崖絕壁,西南終年積雪,山腰溝壑縱,通頂峰之路又必經怪石崢嶸,險景叢生的滾石區和「狼牙區」 ,有較大的攀登難度,對登山探險者很有吸引力。
  6. The slope zone in northern biyang sag is characterized by complex structure, developed minor fault blocks, varied seismic vertical and horizontal velocities and difficult to get imaging, which result in that conventional imaging approaches are hard to meet the needs for exploration and development of this area

    摘要泌陽凹陷北部斜帶構造復雜,小斷塊發育,地震縱、速度變化劇烈,成像困難,常規的地震成像方法成果難以滿足勘探開發的需要。
  7. According to the special surface structure and actualities that the city is extending along the transportation line and river region because of the restriction caused by the mountains in the two sides of every cities in qingyang. the author thinks it is not good to squeeze out the existence of cave dwellings during the course of urban construction, and it is necessary to emphasize the symbiosis between urban and cave dwellings. the author conceives that it is feasible to develop group - dwellings in the steep - sides of mountain and especially to adapt to constructing " climb - slope cave dwellings which are covered with earth "

    根據慶陽特殊的地表結構和城鎮發展受兩側山體限制而沿交通線與川區無限蔓延的現狀,筆者認為在慶陽城鎮建設中不應完全排擠窯居的存在,而是要強調城鎮與窯居的共生,並設想充分利用兩側陡地帶發展居住組團模式,建設新型「爬式覆土窯洞」建築群落,這種「城鎮型窯洞」可作為城鎮建設空間的延續和拓展,防止城鎮呈線狀無限蔓延的畸形發展態勢;提倡運用現代科學技術對傳統窯洞民居進行改造與創新,要加快新式窯居的試點建設;建議積極開發慶陽窯洞旅遊資源,並提出了「窯洞地產」和「綠色窯洞產業」的全新概念。
  8. With the using of microsoft visual basic 6. 0, a multimedia computer - aided design system of small type pumping irrigation district is developed in this paper. provided with the live multimedia messages as well as a good man - machine conversation mechanism, this system can help the user to finish the planning of an pumping irrigated area such as the layout of canal system, the selection of pump models, the establishment of the irrigation program, the calculating of canals " parameters, the estimate of the project magnitude, the selection of the field constructions, the economic analysis of the project, the output of results, etc, a new oo ( object oriented ) programming method is adopted in this system, various softwares are integrated in this systems as well by the " automation " technic provided by vb, in addition, the multimedia technic is applied to this system for the first time, it makes the system easy to ope rate. as for the optimization of the canals " section, a new optimization method is adopted based on the existing theories about the canals " section, and in this way, with the purpose of minimizing the project ' s investment as well as a stalized canal, limited by the longituding slope, the canals " best feasible parameters can be deduced. furthermore, a integral method to reckon the earth work is developed in this paper, by this way, the estimate precision of the earthwork is enhanced notably. this paper includes the particular illumination for the developing procedure of each systems " segment, and in the end, the directions of the system are demonstrated in a sample area which lies in the zhaija village, taizhou city, jiangsu province, the running results showed that the initial purposes are achieved effectively, and it has a preferable practicability

    在渠道縱斷面優化方面,本文在利用已經比較成熟的縱斷面優化理論的基礎上,提出以工程總費用最小為目標函數,以渠道縱i為控制變量,以渠道不沖不淤流速及灌區允許地面比降為約束條件,通過縱斷面聯動優化的方法得到渠道的最佳工程可行的斷面參數。另外,針對部分地區的取土困難的狀況,本文採用積分法計算渠道工程土方量,從而大大提高了土方量的估算精度,有助於準確控制工程投資規模及資金投。本文詳細闡述了該系統所採用的編程方法、系統構成、系統各組成模塊的開發過程以及灌區規劃所採用的優化方法及原理,最後應用本系統對泰州市翟家村機電灌區進行規劃設計,運行結果證明其操作比較簡便,界面友好,運行速度快,規劃成果合理,基本達到了系統預定的要求,具備較強的實用性。
  9. The study results reveal some laws : ( 1 ) two failure modes exist in different obliquity slope and influence the internal force of soil nailing ; ( 2 ) the connection between face shield and soil nailing determines the distribution of the axial force along length ; ( 3 ) the influence of face shield involves its connection with soil nailing and its stiffness on soil nailing wall ; ( 4 ) the transversal effect of soil nailing depended on the joint of nail head is little ; ( 5 ) the maximum axial forces of other soil nailings except the first soil nailing increase gradually with excavation

    研究表明: ( 1 )素土隨著角的變化,存在兩種破壞方式,破壞方式不同,土釘受力狀態不同; ( 2 )土釘和面層的連接方式決定著土釘長度方上的軸力分佈形態; ( 3 )面層主要通過面層與土釘的連接和面層的本身剛度兩個方面對土釘內力和墻體變形產生影響; ( 4 )土釘抗剪抗彎作用的發揮程度和土釘釘頭的連接方式有關,但作用不大,實際設計時可以忽略其影響; ( 5 )隨著體的開挖,第一排土釘的最大軸力變化不大,其它土釘的軸力都穩步增加。
  10. In this thesis, analysis of whole performance and interior mechanism of plain soil slope and soil nailing wall with flag finite difference program has been carried out. at the same time, the impacts on the internal force distribution of soil nailing and the deformation of soil nailing wall of many factors, including the connection between face shield and soil nailing, the friction decline between soil nailing and soil, the shear force & bending moment resistance of soil nailing, the cement crack in soil nailing, face shield, excavation, the obliquity of slope, and so on are studied in this thesis

    本文通過flac有限差分程序,分析了素土基坑和土釘墻體的整體性能和內在機理,研究了土釘和面層的連接變化、土釘表面性能的下降、土釘的抗剪抗彎作用、土釘漿體的開裂、面層的有無、基坑的開挖過程、基坑放角度等因素對土釘內力分佈和土釘墻變形的影響。
  11. As regard our stand, we refer you to the yokohama bank, ltd., singapore branch

    有關我司的資信,請徑濱銀行新加分行查詢。
  12. The project mainly solved the problems from the flood control, the morphological diversity of river profile and cross section, and the diversity of habitats in the river through the layout of shoreline and structures, the design of river profile and cross section, the design of riverbank protection, which is one effective engineering practice of eco - hydraulic engineering

    治理工程在岸線布置、沿河建(構)築物布置、河流縱斷面設計、岸防護設計等方面解決了防洪安全、河流縱形態多樣性、斷面形態多樣性以及河流內棲息地多樣性等問題,是生態水工學理念的一次有效工程實踐。
  13. Gubei slope locates in the middle structure area of bohaiwan basin which stretch toward near north and south, and the faults which tend towards east and west spread all over of the whole district. three huge faulty trap whic h control the sediment formation growth distribute in order, which result in the stratigraphy dropping in step along the slope

    孤北斜帶地處于渤海灣盆地中部近南北伸展的構造區上,近東西走的斷層及其斷裂帶縱全區,三階大斷裂沿斜規律性分佈,基本上控制了全區地層的發育,使得地層沿斜降式分佈。
  14. Through the correlation of nww - see and sn, the thickness and limestone intervals of matuo formation gradually increase from west to east. this represent the center of sedimentation is possible located in east of the region. the matuo formation thickness gradually increase and then reduce from north to south

    通過北西西?南東爾和南北剖面對比,瑪托組地層變化表現為由西往東,瑪托組地層厚度逐漸加大,灰巖夾層也增多,反映當時沉積中心在研究區東部,而由北往南,厚度先逐漸增大,后減小,灰巖夾層增多,由北往南的古地理格架為濱面?碳酸鹽臺地?斜環境。
  15. Experimental results demonstrate that the proposed vision measurement method for the lateral deviation error can achieve the cm - level real - time accuracy on the general road with low gradient under the condition of near view, which can satisfy the measurement demands of the multi - sensor integrated navigation system of intelligent vehicles

    試驗表明,所提出的偏差測量方法在近視野情況下對于度不大的一般道路可以取得厘米級的實時測量精度,能夠滿足多傳感器組合導航對偏差測量的要求。
  16. Based on the theory of bekker, this paper also analyzes the process of steering on flat ground and on a slope. this paper also considers the centrifugal force and the air resistance when tank is driving at middle or high speed

    在分析坦克所受外力作用時,考慮了履帶的滑動和擺角,並且根據bekker的理論,分別討論了坦克在水平面和斜上的轉過程,在分析過程中,充分考慮了坦克高速轉時的離心力的影響。
  17. It compleated enterprise chongqing guest house, continuusly taps running projects and opens up the overseas markets. it has established branches and running bodies in singapore, thailand and costal areas cuccessively. now, chongqing sunshine tourism group is rapidly advancing to the modern international tourism and striding forward to the internationalized way

    現有職工1200餘人,固定資產近3億元,集團充分發揮其核心企業重慶賓館的人才優勢和地理優勢,不斷挖掘經營項目拓展海外市場,先後在新加泰國以及沿海一帶開設了子公司和經營實體,集團正以迅雷不及掩耳之勢著現代化的國際旅遊業進軍,著國際化的道路邁進。
  18. As a research authority in nanjing university from 1997, he has being taken charge of five projects on multimedia computing and graphic recognition, supported by national post - doctoral science foundation ( 1997 ) and national science foundation ( 1999, 2003 and 2004 ), program for excellent college teacher ( 1999 ) and program for new century excellent talent ( 2004 ) of the ministry of education

    自到南京大學任教以來,先後主持「中國博士后科學基金」項目一項( 1997年度) 、 「國家自然科學基金」項目兩項( 1999年度和2003年度) ,教育部「高等學校骨幹教師資助計劃」 ( 1999年度)和「新世紀優秀人才資助計劃」 ( 2004年度)各一項,主持與南京市地方稅務局和新加貝克比科技有限責任公司合作項目多項,協助主持「國家自然科學基金」項目一項( 2004年度) 。
  19. A cross slope of one in fifty is usually enough

    通常1 50的橫向坡度就已足夠。
分享友人