橫向抗力 的英文怎麼說

中文拼音 [héngxiàngkàng]
橫向抗力 英文
lateral resistance of pile
  • : 橫形容詞1. (蠻橫; 兇暴) harsh and unreasonable; perverse 2. (不吉利的; 意外的) unexpected
  • : Ⅰ動詞1 (抵抗; 抵擋) resist; combat; fight 2 (拒絕; 抗拒) refuse; defy 3 (對等) contend with...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 橫向 : broadwise; infeed; crossrange; abeam;transverse; transverse direction; cross; crosswise; lateral;...
  1. Variation ratio of dimensional after water rinse, ultimate strength, neps and pile, tearing resistance, bursting strength, joint strength, commissure ' s swerve strength, fabric shift ( slip ), ventilate degree, elasticity ( resilient rate / deformation rate ), anti - water permeability ( hydrostatic pressure ), extension and resilience, abrasive resistance, gets wet the nature, hydroscopicity, stock ' s transverse ductility, fire resistance, antistatic

    水洗尺寸變化率(縮水) ,斷裂強,起毛起球,撕破強,彈子頂破強,脹破強度接縫強,縫口脫開程度,紗線滑移性能(滑脫) ,透氣量,彈性(回復率/變形率) ,滲水性(靜水壓) ,延伸及回復性,耐磨性,沾水性,吸水性,襪子延伸,阻燃性能,靜電。
  2. 2 ) the structure elements should be laid out symmetrically and uniformly when designing steeve - arch structure, what ' s more, the reasonable selection of section geometric size near the arch foots of first beams is paid attention to and the arrangement difficulties of steel bar due to the big eccentric pressures 2, the analyses of anti - seismic features on transverse direction of the aqueduct l ) the method of adjusting the elements " mass can be harnessed in order to even the layout of seismic loads

    2 )設計吊桿式拱架支承結構時,各部分構件應當均勻對稱布置。另外,還應注意頭道梁拱腳附近截面的尺寸擬定,克服地震內造成的大偏心受壓狀態給結構配筋設計增加的困難。 2 、震性能分析1 )可利用調整構件質量的方法,使得結構的某些構件的地震荷載分佈均勻一些。
  3. Some conclusions are drawn : 1 ) effect of inertial force from superstructures on the lateral seismic response of single pile can not be ignored ; 2 ) the lateral seismic response of single pile induced by far - field earthquake are mainly affected by acceleration mass of superstructure > site eigenperiod. it increases with the increment of accele ration and mass of superstructure. as the site characteristic frequency approaches the self - oscillation frequency of the pile, sympathetic vibration occurs and the value of lateral seismic response reaches maximum ; 3 ) as the stiffness ratio of pile to soil increase, the relative displacement of pile to soil increases ; 4 ) the lateral seismic response of fixed - head pile is much smaller than that of free - head pile

    將其解析解與具體的的震設防烈度和場地特徵周期結合起來,計算分析了成層地基中單樁的地震響應,得到了以下結論: 1 )上部結構慣性對樁的地震響應的影響不可忽略; 2 )成層地基中的單樁的地震響應主要受地震基本加速度、場地特徵周期、上部結構質量的影響,隨地震基本加速度、上部結構質量的增大而增大;場地特徵頻率越接近樁基自振頻率,樁基地震響應越大,等於自振頻率時,由於發生共振現象,樁基響應幅值最大; 3 )樁土剛度比越大,樁土之間的相對位移的幅值越大; 4 )樁頂固接的連接方式,可以有效地降低地震時單樁的地震響應。
  4. It's important to ensure adequate stiffness to resist lateral forces induced by wind, or seismic or blast effects.

    保證足夠剛度以抵風、地震或爆炸氣浪效應所引起的是很重要的。
  5. This paper deals with seismic response of a tunnel - soil system immersed tunnel , as an underground structure , must be compatible with the deformation of the surrounding soil thus the simplified model for a tunnel - soil system is established through two steps at the first step , an mdof system is developed for modeling the foundation soil to this end , dynamic behavior of the foundation soil is analyzed a typical section of the foundation soil simplified as a single mass - spring system on the basis of some equivalent criteria those mass are linked longitudinally by elastic springs to form an mdof system at the second step , the tunnel is treated as a beam on elastic foundation ; that is , the tunnel is connected with the soil massed to form a tunnel - soil system this model has been applied to the seismic analysis of huangsha fangcun immersed tunnel across the pearl river in guangzhou design recommendation is proposed on the basis of this analysis

    研究沉管隧道在地震條件下整體受的分析方法分兩步建立計算模型第一步通過分析場地地基土切片的動特性,根據等效原則將其化為等效單質點體系,然後在縱用等效彈簧連接而成為多質點體系的地基土計算模型;第二步將隧道看作彈性地基梁與上述多質點體系通過等效彈簧連結而得到土隧道體系的計算模型本文結合廣州黃沙芳村珠江水下隧道工程實例建立了具體的計算模型並對多種不同的約束條件,進行了縱地震響應時程分析,為該隧道的震設計提供依據
  6. The possible factors including the deviation of temperature in length and breadth of rod, the changes of transfiguration resisting force under the changes of temperature, the adjustment of roll gap, the variation of rolling pressure, the changes of roller speed during dynamic adjusting press, the unmatched of seconds - flux under the dimension fluctuation of the coming sample and so on. the whole system was a closed loop which factors in it interacts each other

    可能的影響因素有:沿軋件縱溫度變化、由溫度引起的軋件變形變化、軋機輥縫值變化、負載變化、電機調節系統由不穩定穩定過渡過程中軋輥轉速的變化(如咬鋼過程中的動態速降后的回復階段) 、來料尺寸波動造成秒流量不匹配等,整個模擬系統是各個因素相互影響關聯的一個閉環系統。
  7. Treating the soil as a two - phase mixture and considering the interactive influence of seepage and solid deformation, this paper analyzes the dynamic impedance of group piles in layered saturated porous media by indirect boundary element method and investigates the effects of pore fluid in saturated soils on dynamic impedance of piles

    摘要將飽水軟土地基視為兩相介質,考慮水的滲流和土骨架變形的耦合作用,用間接邊界元法分析層狀飽水軟土地基中受荷群樁動,探討飽和土中孔隙流體對飽和土中受荷群樁動的影響。
  8. The study results reveal some laws : ( 1 ) two failure modes exist in different obliquity slope and influence the internal force of soil nailing ; ( 2 ) the connection between face shield and soil nailing determines the distribution of the axial force along length ; ( 3 ) the influence of face shield involves its connection with soil nailing and its stiffness on soil nailing wall ; ( 4 ) the transversal effect of soil nailing depended on the joint of nail head is little ; ( 5 ) the maximum axial forces of other soil nailings except the first soil nailing increase gradually with excavation

    研究表明: ( 1 )素土坡隨著坡角的變化,存在兩種破壞方式,破壞方式不同,土釘受狀態不同; ( 2 )土釘和面層的連接方式決定著土釘長度方上的軸分佈形態; ( 3 )面層主要通過面層與土釘的連接和面層的本身剛度兩個方面對土釘內和墻體變形產生影響; ( 4 )土釘彎作用的發揮程度和土釘釘頭的連接方式有關,但作用不大,實際設計時可以忽略其影響; ( 5 )隨著坡體的開挖,第一排土釘的最大軸變化不大,其它土釘的軸都穩步增加。
  9. In this thesis, analysis of whole performance and interior mechanism of plain soil slope and soil nailing wall with flag finite difference program has been carried out. at the same time, the impacts on the internal force distribution of soil nailing and the deformation of soil nailing wall of many factors, including the connection between face shield and soil nailing, the friction decline between soil nailing and soil, the shear force & bending moment resistance of soil nailing, the cement crack in soil nailing, face shield, excavation, the obliquity of slope, and so on are studied in this thesis

    本文通過flac有限差分程序,分析了素土基坑和土釘墻體的整體性能和內在機理,研究了土釘和面層的連接變化、土釘表面性能的下降、土釘的彎作用、土釘漿體的開裂、面層的有無、基坑的開挖過程、基坑放坡角度等因素對土釘內分佈和土釘墻變形的影響。
  10. The experimental result indicate that the working characters of the test floor slab is typically two - way obviously, the floor slab that is reinforced two - way by setting transverse steels through the rectangular cores in the ribs of the precast slabs, has excellent bulking property, high bearing capacity, cracking resistance and so on

    試驗研究表明,試驗樓蓋在加載過程中呈現了明顯的雙特徵; pk預應疊合樓蓋通過在預制構件板肋預留長方形孔穿置鋼筋實現雙配筋具有良好的整體性能,還具備承載高和裂性能良好等特點。
  11. The result shows that the ability of anti - interference from strong - narrow band can be improved by using albefaction filter, the interference resisting property of the dual tap filter is much better than that of predicted error filter

    模擬結果表明,加白化濾波器確實能提高系統的強窄帶干擾的能,同時也表明雙抽頭濾波器的干擾性能比預測誤差濾波器的性能要好。
  12. On the other hand, for the pre - press stress being threw by the hub was inserted after cooling with liquid nitrogen, the poor transverse tension strength of the multi - ring flywheel rotor could be counteracted. so the rotate speed and energy storage density can be increased efficiently

    而採用多環套裝纏繞技術製造的多層飛輪輪環,在利用溫差過盈裝配方法給復合材料輪環施加預壓應后,能夠有效避免飛輪轉子的復合材料輪環部分因較低的纖維拉強度而破壞失效,從而大幅度提高飛輪轉子的極限轉速和儲能密度。
  13. The longitudinal stresses in the tunnel structure calculated by using the model of tamura & okamoto are obviously greater than the stresses in transverse direction obtained by using two dimensional finite element analysis. it is proposed that the axial and bending stresses should not be ignored for the underground structural design

    計算結果表明,由彈簧質量模型算得的地下結構在地震作用下縱振動和振動產生的縱和彎曲正應及剪應明顯高於由二維平面有限元算得的平面內產生的正應和剪應,由此可見軸和彎曲應是地下結構震設計中不容忽視的因素。
  14. For the application of sic devices to radiation fields, it is important to know the irradiation effects and characteristics of sic materials and devices. the main contributions in this thesis are as following : temperature - and electric field - dependent electron transport in 6h - s1c is studied by single - particle monte carlo technique. the physical model used in the simulation is developed considering the main scattering mechanisms in details

    為了能充分發揮sic輻照的優勢和潛,本文首先對sic區別于常規半導體的特性作了系統的研究:用單粒子montecarlo方法研究了6h - sic的電子輸運規律,模擬的結果體現了6h - sic具有良好的高溫和高場特性以及遷移率的各項異性,其遷移率和縱遷移率相差近5倍。
  15. At last the dynamics of trailer is analysed when trouble is take place including the lateral stability when the anti yaw dampers become ineffective, the ride index when airsprings have no air and the negotiation when the trailer runs on the curve the tilting actuator does n ' t work or work in the contrary direction

    最後,論文分析了拖車在幾種故障工況下的動學性能,包括蛇行減振器失效工況的穩定性;空氣彈簧無氣工況的運行平穩性;曲線通過時傾擺作動器不動作和傾擺作動器反動作工況拖車的動態曲線通過性能。
  16. To ensure the integrity of the girder and resist transverse bending due to dead load and service load, powerful transverse prestressing tendons were disposed in the diaphragms

    為加強主梁受的整體性,抵靜載和動載產生的彎矩,梁結構內設置了預應鋼束。
  17. To plant steel rods in the assemble type concrete slab bridge deck and execute transverse pre - stresses not only can strengthen links between the assemble type concrete slabs and the bridge deck, but also can strengthen the transverse entirety of the whole bridge structures, and intensify the resistance of the bridge to active loads, vibrations and abrasions

    摘要通過在裝配式混凝土板板頂植筋並對橋面施加預應,不但可以加強板與橋面鋪裝層的連接,而且還可以加強整體結構的整體性,增強結構對動載沖擊、震動、磨耗抵
  18. First1y, in this paper, the testes about tensi1e resistance of masonry components in different period are processed and re1ated suppositions and formu1as are brought forward : the formu1a about maxima1 shear stress of top side in high or tier masonry bui1dings is deduced. it can be found easi1y that the factors affect ing the maxima1 shear stress are vertica1 resi stance coefficient 1oad magnitude wa11 geometry dimensions and its modu1us of e1asticity

    首先,進行了不同齡期下的砌體試件學性能試驗,提出了相關的假定和公式,推導出了縱墻荷載差影響下的多、高層砌體結構房屋頂層的最大剪應公式,從中可以看出影響最大剪應的因素有豎系數、荷載大小、墻體的幾何尺寸和墻體的彈性模量等。
  19. This dissertation introduces the latest test and the research findings of the frame structure utilized in the central workshop of firepower power plan by engineering design. this paper introduces the seismic analysis method of vertical frame, horizontal framed bent plate structure and space structure seismic analysis in framed bent structure system. this paper analyzes and researches the design plan of the framed bent structure in the central workshop of fangsheng power plant, selects the most safety, economic and proper structure form according to the result of the analysis and research, mainly analyzes the vibration mode of framed bent structure, period and the structure earthquake response by computer program calculating

    本文通過方盛電廠主廠房工程的設計,對火電廠主廠房框排架結構最新的試驗及研究成果進行了介紹;對框排架結構體系中縱框架震分析方法、框排架平面結構及空間結構震分析方法進行了介紹;對方盛電廠主廠房框排架結構體系設計方案進行分析探討,並根據分析研究的結果,選擇最安全、經濟、適用的結構形式;通過計算機程序計算,著重分析框排架結構的振型、周期及結構的地震反應。
  20. For the brittle ceramic materials, flexural strengths are determined by the stress at fracture in transverse bending tests

    對脆性陶瓷材料來說,彎強度即為彎曲試驗中樣品斷裂時的應
分享友人