檢修計劃 的英文怎麼說

中文拼音 [jiǎnxiūhuà]
檢修計劃 英文
repair schedule
  • : Ⅰ動詞1 (查) check up; inspect; examine 2 (約束; 檢點) restrain oneself; be careful in one s c...
  • : Ⅰ動詞1 (修飾) embellish; decorate 2 (修理; 整治) repair; mend; overhaul 3 (寫; 編寫) write;...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
  • 檢修 : examine and repair; overhaul; recondition; service
  • 計劃 : 1 (工作、行動以前預先擬定的內容和步驟) plan; project; programme; device; devisal; design 2 (做...
  1. Accurate load forecasting is helpful to planning generators " starting and stopping in the interior of the electrical networks economically and reasonably, preserving the security and stability of power system, reducing the unnecessary circumvolving repertory capacity, making planning to overhaul the units in reason, ensuring the normal production and life of the society, effectively reducing the cost of generating electricity, increasing the economical and social benefit

    電力負荷預測是供電部門的重要工作之一,準確的負荷預測,可以經濟合理地安排電網內部發電機的啟停,保持電網運行的安全穩定性,減少不必要的旋轉儲備容量,合理安排機組檢修計劃,保證社會的正常生產和生活,有效地降低發電成本,提高經濟效益和社會效益。
  2. On basis of studying the current situation of the maintenance schedules design in power supply system, combining the actual status of foochow power administration, the maintenance schedules auto - designing system is further investigated and exploited in this thesis

    本論文在研究供電系統檢修計劃制定現狀的基礎上,結合福州電業局實際情況,深入研究並開發了供電系統檢修計劃優化自動制定系統。
  3. ( l ) it is very important for the state repair of diesel enging in our country ; ( 2 ) it will help with the more accurate decicision of repair cycle of the engine ; ( 3 ) it will improve the combustion state of the diesel enging and will keep the oil comsume at a lower level, at the same time, it lessens the dilute of the lubricanting oill in the engine. there are still some more research work to do, for it is just the begining. the mathematic model should be made and more accurate data rule should be established

    ( 1 )為推行內燃機車狀態做準備,這在跟蹤國際機車先進技術上有著十分重要的意義; ( 2 )為更合理制定內燃機車的周期提供實驗分析方法和數據,試驗數據作為每臺柴油機的技術資料被存儲,藉助算機軟體系統可以輔助制定機車的檢修計劃,使機車的工作更科學合理; ( 3 )提高機車質量,降低費用; ( 4 )改善柴油機燃燒狀態,降低燃耗,節約運營成本,同時,可以減少燃油滴漏,降低滑油消耗。
  4. Building a reasonable maintenance scheduling has become one of the most important strategies for generation companies to maximize profits. the traditional approach of generation maintenance scheduling employed by the system operator through a centralized optimization method is no longer acceptable by generation companies and does not match with the electricity market operation mechanism. new methods must be developed for this purpose

    在此背景下,傳統的、由系統調度機構基於系統可靠性要求或使系統總的運行成本最小來統一安排發電機組檢修計劃的管理方式因無法保證公平性而難以為發電公司所接受,也與市場機制不相吻合,必須尋求新的解決辦法。
  5. Be responsible for making maintenance plan and implementation

    負責維護、檢修計劃的編制、報審及組織實施。
  6. Database organization of visualized scheduled maintenance for power supply system

    可視化供電系統檢修計劃的數據庫組織方法
  7. Patrol the mechanical equipments status of plant and carry out troubleshooting

    根據檢修計劃進行機械設備的維和維護工作。
  8. Plant maintenance plan

    設備檢修計劃
  9. Repair and maintain the mechanical equipments according to the maintenance plan

    根據檢修計劃進行機械設備的維和維護工作。
  10. Develop weekly & annual equipment preventive maintenance plans and drive the implementation

    制定每周和每年的設備定期檢修計劃並且付諸實施。
  11. Constitute the maintenance plan of the responsible equipment and push it to be finished

    制定所管轄設備的年、季、月度檢修計劃,並督促的有效實施。
  12. Implement various examination plans, schemes, maintenance measures implementation requirement regulations

    執行各類檢修計劃、方案、維護措施以及實施要求規范。
  13. The strategy to solve the arrangement of the power grid ' s device maintenance scheduling based on. the expert system

    基於專家系統編排電網設備檢修計劃的求解策略
  14. Implement various examination plans, schemes, maintenance measures and implementation requirement regulations

    執行各類檢修計劃、方案、維護措施以及實施要求規范。
  15. The risk assessment and the risk sequence of the equipment and piping of catalytic cracking unit in lanzhou petrochemical company were defined by applicating the risk - based inspection ( rbi ) technology, and the inspection program which offers scientific basis for repairing schedule and strategy was made according to different equipment, piping and different risk classes

    摘要通過運用基於風險的驗( rbi )技術對蘭州石化公司300萬噸年重油催化裂化裝置的靜設備和管道進行風險評估和風險排序,針對不同的設備,不同的風險等級制定了相應的驗策略,為制定裝置的檢修計劃和長期的策略提供了一種科學方法。
  16. First, a new methodological framework is developed for investigating the optimal strategies of maintenance scheduling for generating units with risk well taken into account, based on the widely employed power pool mode and the uniform clearing price. two scenarios are examined in detail, i. e., for the two cases that the generation company studied is / is not a price taker in the electricity market operation. based on the electricity market clearing prices estimated, a new methodological framework is presented, mathematical models formulated and a solving method developed

    以國內外廣為採用的聯營體模式、統一市場清算價結算的現貨電力市場為背景,在假設市場電價可以預測並能夠描述為某種概率分佈的前提下,採用方差或標準差來描述和度量風險;建立了相應的優化模型,為發電公司在制定發電機組的檢修計劃時適當兼顧利潤損失的期望值最小和風險最小這兩個目標提供了新的解決途徑。
  17. To minimize the impact of the overhaul of power generating, transmission equipments on the safety, stability and economic operation of power gird, this paper, aiming at the overhaul demand of lots of equipments, brings forward the practical optimization method for overhaul planning which can adapt to the dynamic changes of the scale of power grid and integrate the load forecast and the balance of power load and power volume into it, therefore solve the key technical problems encountered by using computer to realize the optimization of overhaul planning

    為最大程度減少電網發、輸電設備對電網安全、穩定、經濟運行的影響,針對電網大量設備的需求,提出了能適應電網規模動態變化,並與電網負荷預測、電力電量平衡有機結合的實用檢修計劃優化方法,解決了利用算機實現檢修計劃優化的關鍵技術問題。
  18. Based on the gis developing platform, this system considered the comprehensive planning of the digitalized power system, realized the whole course of the optimized maintenance schedules " designing. it can provide the dispatcher of the supplier department with the optimized scheme, avoid the shortcoming of the manual designing, lighten the labor intensity of plan engineering, improve the working efficiency

    該系統考慮了數字電力系統的總體規,基於gis開發平臺,實現檢修計劃優化制定的全過程,為供電調度部門的調度人員提供了優化的調度方案,避免了人工制定檢修計劃的不足,減輕編制人員的勞動強度,提高工作效率。
  19. Major duty : equipment installation, check and acceptance and commissioning ; stipulation of the regulation for equipment operation and maintenance ; robot software writing ; equipment faults diagnosis and analysis ; stipulation and implementation of equipment checking plan and program

    工作職責:設備的安裝、驗收與調試;設備操作、維護規程的制定與維護;機器人軟體編程;設備故障診斷、分析;設備檢修計劃與方案的制定與實施。
  20. And an equipment condition monitoring software is developed for user to monitor equipment condition. unstandardized working flow, unreasonable inspection and repair plan, incomplete equipment information, minor information utilization in equipment management are discussed in this paper, enterprise equipment running management system is developed, scientific, reasonable equipment management is well fulfilled

    論文分析了企業現有設備運行管理中存在的作業流程不規范、設備檢修計劃不合理、設備信息不完善、信息利用率較低的問題,在綜合企業用戶需求的基礎上,開發了企業設備運行管理系統,很好地實現了設備管理科學化、合理化。
分享友人