檢查安裝 的英文怎麼說

中文拼音 [jiǎnzhāānzhuāng]
檢查安裝 英文
re-install
  • : Ⅰ動詞1 (查) check up; inspect; examine 2 (約束; 檢點) restrain oneself; be careful in one s c...
  • : 查名詞1. [植物學] (山查) hawthorn; haw2. (姓氏) a surname
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • 檢查 : 1 (用心查看) check up; inspect; examine; censor; survey rummage; review; jerque; docimasia 2 (...
  1. 2. practical meteorology : making weather observations ; encoding and decoding of codes in normal use ; manual and computerized plotting of weather charts ; preparation and dissemination of weather bulletins by microcomputers ; principles and exposure requirements of meteorological instruments ; simple fault detection and adjustment of instruments and autographic recorders ; upper - air sounding ; wmo and aftn aeronautical fixed telecommunications network message formats and telecommunications procedures ; handling telephone enquiries

    2 .實用氣象學:天氣觀測編制與翻譯常用電碼以人手及電腦繪畫天氣圖使用微型電腦編排及傳送天氣報告氣象儀器原理及條件儀器及自動記錄器的簡單故障與校正高空探測,世界氣象組織及航空專用電信網電報格式及電信程序接聽電話詢問。
  2. At last turn connected - implement with hand, to check if have the phenomenon of grinding and collide or not, if the turning become breezily and equably well then the installation over

    5完畢。最後用手盤動聯軸器,有無擦碰現象,轉動輕松均勻則結束。
  3. Place the units in their intended mounting locations to check the cable length and monitor installation conditions

    把設備放入計劃好的位置,電纜長度和監視器條件。
  4. Inspecting fitting accuracy of hatch coaming on board

    貨艙口圍板船上精度
  5. Fourth, the paper treats two kinds of hoisting projects of high alititude construction in bulk and member assembly, hositing machine and plan layout, setting up scaffold and joints, and installing trunks, branches and joints etc. then in detail discusses the method which applys total station to measure three - dimensional coordinate of dendriform structure, including selecting survey sign points, creating survey system and converting survey coordinate system etc. the paper also deep research on the welding performance, welding method, welding process, welding stress and control, welding strain and rectification, weld defects analysis and weld quality inspection, and so on complicated heterogeneity steel weld proplems

    接著系統的論述了高空散法和分單元法兩種樹狀結構吊方案,樹狀結構吊機械及平面布置,樹狀結構胎架及節點的搭設,以及樹狀結構樹干、樹枝和節點的吊工藝等諸多工藝問題。詳細的論述了採用全站儀對樹狀結構進行空間三維坐標測量的方法,包括測量標志點的選取、測量系統的建立及測量坐標的轉換等問題。深入地研究了樹狀結構可焊性、焊接方法、焊接工藝、焊接應力及控制、焊接變形及矯正、焊接缺陷分析及焊接質量等復雜的異種鋼焊接問題。
  6. Inspection installation and water tightness transducer of echo sounder on berth

    測深儀換能器船臺和水密性
  7. Available options and accessories such as ground plate, lift off protection, upper welding plate and welding gauge make the module extremely versatile and ensure a very easy installation and safe operation under rugged conditions

    可選配件有接地板吊保護上焊接板及焊縫樣板。這些配件使模塊能用於各種用途,保證方便,且在凹凸不平的情況下也能全操作。
  8. When you install a new pcv valve, inspect and clean the system thoroughly.

    新PCV閥時,應仔細地和清洗PCV系統。
  9. Inspecting fitting accuracy of draught mark ( loading line mark )

    吃水標志(載重線標志)精確性
  10. 9 inspect the amount, arrangement, fixing position of the signal equipment ( inspect all kinds of signal equipment according to “ navigation signal arrangement and mast structure drawing ” “ safe drawing ” ( such as signal light, signal shape things, signal flag, pyrotechnic signal, self igniting light of lifebuoy, sound signal etc ) whether satisfy finished plan, and check the qualified certificate of this equipment before and after installation on the ship

    信號設備的驗與試驗(按照《航行信號布置及桅桿結構圖》 , 《全圖》 )各種信號設備(如信號燈、信號形狀用品、信號旗、煙火信號、救生圈的自亮燈、聲音信號等)的數量、布置、位置是否滿足設計的完工圖紙,並在到船上之前和之後這些設備的質量合格證。
  11. Master gears for checking spur gears ; receiving arbors

    圓柱直齒輪用的標準齒輪.心軸
  12. Install virus scanning software and never execute any programme until you have checked it for virus

    防毒軟體,並所有不明來歷的檔案。
  13. But suppose you want to check what service pack has been installed

    但是假設您想要檢查安裝了什麼級別的服務包。
  14. Step 3 : verifying your installation of the database engine

    步驟3 :檢查安裝的數據庫引擎
  15. Check to see if the installation has been completed without any error messages

    檢查安裝是否已經完成並且沒有任何錯誤消息。
  16. Verify the installation

    檢查安裝
  17. If you plan to manually configure your bootloader, you should check the name of the installed kernel in

    如果您打算手動設定boot - loader ,您需要檢查安裝
  18. Before starting this tutorial, you should carefully check the minimum hardware and software requirements for a lotus workplace v1. 1 installation

    開始前,仔細檢查安裝lotus workplace v1 . 1的最小硬體和軟體需求
  19. To check the installation, you must create a database, bind it to xml extender and cli, and run the installation check program

    為了檢查安裝情況,您必須創建一個數據庫,將該數據庫綁定到xml extender和cli ,然後運行程序。
  20. Pug is used to check the assembly relation of all relative parts of components, it helps to reassure the precision of the auto body, and to find the faults of the design, so as to find and remove the existing problems

    總成具主要用來潢件單件或總成件各件之間的匹配關系,保證車身各部分的匹配精度,依靠pug總成具,能及時發現設計缺陷,識別和排除存在的問題。
分享友人