檢查進度 的英文怎麼說

中文拼音 [jiǎnzhājìn]
檢查進度 英文
progress
  • : Ⅰ動詞1 (查) check up; inspect; examine 2 (約束; 檢點) restrain oneself; be careful in one s c...
  • : 查名詞1. [植物學] (山查) hawthorn; haw2. (姓氏) a surname
  • : 進構詞成分。
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 檢查 : 1 (用心查看) check up; inspect; examine; censor; survey rummage; review; jerque; docimasia 2 (...
  • 進度 : 1. (工作進行的速度) rate of progress; rate of advance 2. (工作進行的計劃) planned speed; schedule
  1. This paper mainly aims at the characteristics of the hardware and software structure of the parallel computer on satellite, and has fulfilled researches of fault tolerant technique in three aspects of control theories and engineering : the first research of the system level fault - tolerant module is based on the system structure of the parallel computer on satellite, a kind of cold backup module and a kind of hot backup module for multiprocessor computer have been put forward. then the research of software fault tolerant technique which is based on the operate system named rtems has been carried, the mission level fault - tolerate arithmetic and the system level fault - tolerate mechanism and strategies based on the check point technique have been put forward, at the same time the self - repair technique of software which has used the technique of system re - inject has been studied. finally the technique of components level fault - tolerant based on fpga has been studied, a kind of two level fault - tolerant project which aims at the fault - tolerant module of the parallel computer on satellite has been put forward, and the augmentative of circuit that project design realization need is little, this project can avoid any breakdown of any part logic circuit of the fpga

    本課題主要針對星載并行計算機體系結構及軟體結構的特點,從如下三個方面行了容錯控制理論研究和實踐工作:首先行了基於星載多cpu并行計算機體系結構的系統級容錯模型研究,提出了一種多cpu冷備份容錯模型和一種多cpu熱備份容錯模型;然後行了基於rtems操作系統的軟體容錯技術研究,提出了任務級容錯調演算法以及基於點技術的系統級容錯恢復機制和策略,同時研究了利用系統重注入行軟體在線自修復的容錯技術;最後研究了基於fpga的部件級容錯技術,提出了對容錯模塊這一星載并行計算機關鍵部件的兩級容錯方案,實現該方案所需增加的電路少,可避免板級晶元以及fpga晶元內部任何邏輯發生單點故障。
  2. The operator should check with the supplier of his bin to determine recommendations concerning wall stiffeners.

    操作者應與谷倉提供者一道,以確定增加包壁強的措施。
  3. If funds should be collected level by level before the competent department hands them over to the central treasury at last, the ministry of finance shall supervise the handing over and the financial supervisor ' s office stationed by the ministry of finance in the place shall inspect the collecting and handing over of funds

    各級財政部門要一步建立和完善有關收入的繳庫(含財政預算外資金專戶)制、繳庫單分送制,認真履行監督、職責,根據公、、法、工商部門行政性收費和罰沒收入的執收、執罰和解繳情況,加強催繳和監繳,並建立稽機制,堵塞漏洞,做到應收盡收。
  4. Enterprises must compare with the best satisfaction value after receiving the index satisfaction at all levels, find out one ' s own advantage and disparity from it, implement and improve, about improve model question that input and output maximized in fact, enterprises are in a situation that the capital cost is certain, the rational input to each index of distribution, make customer satisfaction get the greatest improvement customer satisfaction test and assessment is a dynamic course, enterprises must also implement a lot of investigations, measure satisfaction value many times, in order to check the impro ved result, cany on essential adjustment, make the improvement scheme correspond to reality

    企業在得到各級指標滿意之後,必須與最佳滿意值比較,從中找出自己的優勢和差距,實施改,關于改模型實際上是投入產出最大化的問題,企業在投資額一定的情況下,合理的分配對各個指標的投入,使得顧客滿意得到最大的提高。顧客滿意測評是一個動態的過程,企業還必須實行多次調,多次測量滿意值,以的效果,行必要的調整,使得改方案符合實際。
  5. To comply with monitor and inspection of the quarterly, half yearly, and yearly inspection and remedy of rooftop, roof space, deck, ground, basement, down pipe, sanitary pipe, air vent, cement & concrete, structural, foundation, beams, ironmongery and all related

    對屋頂,地板,地下室,下水道,排水管,排氣口,水泥和混凝土,地基等相關的結構設備行每季,每半年,每年的和修理。
  6. The 3d coordinate measurement machine form usa, universal tool microscope from germany, intellectual flatness check device, metalloid graphic analyzer, electric and pneumatic measurement instruments and high performance steering test equipment ensure the products quality and play the important role for the products development

    從國外口的三坐標測量儀、德國萬能工具顯微鏡、智能平面儀、金相圖像分析系統、電動量儀、氣動量儀和日本的高性能動力轉向系統試驗設備,保證動力轉向器的性能質量。
  7. Produce sells the produce that the enterprise sells to its, ought to build examination of perfect replenish onr ' s stock to check and accept a system ; via checking what do not accord with standard of produce quality safety, do not get a sale

    農產品銷售企業對其銷售的農產品,應當建立健全驗收制;經驗不符合農產品質量安全標準的,不得銷售。
  8. To ensure that room temperature was set at 25. 5 xc in accordance with etwb s requirement, surprise inspections were conducted at the immigration headquarters as well as outstations and similar offices in 2005 - 2006

    為確保辦公室的溫保持在環境運輸及工務局規定的攝氏25 . 5,本處於二零零五至二零零六年在總部和外設及同類的辦事處行突擊
  9. Progressive leaders in the states, moreover, made a concerted campaign to overhaul the existing structure of political institutions.

    此外,各州步領袖還掀起一場協同的運動,以徹底現存政治制的結構。
  10. The frequency of medical examinations for recovered sars patients conducted by ha, and whether such examinations were only targeted at functional capacities or physical constitutions in which problems have been inflicted as a result of sars treatments

    (一)為沙士康復者行身體的頻密程,以及該等是否只針對因治療沙士而引致出現問題的身體機能或構造;
  11. In the fourth and final recommendation, the organizations said that patients with intermediate or high pretest probability of pulmonary embolism require diagnostic imaging studies

    在第四項及最後的建議中,研究組說有中或高預發性肺栓塞的病人需要行診斷性影像
  12. Scientific sleuths will be examining how certain key worker bees may have been targeted as part of their ongoing inquiries

    科學研究人員正在在多大程上工蜂已經被確定為正在行的調的對象。
  13. Various steps were taken to reduce the electricity consumption of revenue tower. this was achieved by, for example, replacing the old type fluorescent strip lights with electronic ballast ones, reducing the illumination level to the minimum and by conducting routine checks to switch off lights and communal facilities when they were not in use

    本局實施節省能源措施,減少稅務大樓的耗電量,例如把舊式光管更換為具備獨立電子鎮流器的光管,把照明減至最低,以及行例行,把不需用的燈光和公用設施關掉等等。
  14. The article iv consultation is an annual exercise, and we see it very much as a health check on how we run the economy

    第四條款磋商是基金組織一年一的工作。對我們來說,這好比對本港經濟行了一次體格
  15. First of all, the assembly model of dfa is established and the data structure of the model is proposed ; in order to redesign product and structures and select optimized assembly plans, an assemblability evaluation system is constructed. secondly, assembly process planning is analyzed, including assembly path planning and assembly sequence planning ; and then the thesis brings forward the way of 11 - tuple to represent the movement of assembly / disassembly of assembly elements. in the end, this paper makes an research on the technology of interference checking, raised a kind of algorithm of swift interference checking based on envelops bounding box decomposition, hence, the accuracy and efficiency of the algorithm is improved dramatically

    首先建立了面向裝配設計的裝配模型,給出了它的數據結構;接著從面向產品結構和裝配工藝過程兩方面再設計的角,構建了裝配性評價體系;接著闡述裝配工藝規劃技術,包括裝配路徑規劃和裝配順序規劃;然後提出了11元組法來表示裝配元件的裝拆運動;最後對干涉驗技術行了研究,採用一種基於包容盒逐層的快速干涉演算法,提高演算法的精和效率。
  16. The speciality of chinese traditional medication decoction pieces means the hard job of its quality controlling and management, which covers identification of the confusion, falsify and counterfeit, checking of medicate part, impurity, humidity, bitten by insect, mustiness and oil - releasing, counting of package and number, and the quality controlling and storing management in warehouse. the author here would like to share some experiences which from both theory and the practices

    中藥飲片的特殊性決定了其質量控制和管理的難,從飲片入庫前的驗收,包括易混品、摻偽品、假冒品的鑒別,藥用部位、飲片雜質、濕、蟲蛀、發霉和走油等方面的,及包裝和數量的清點,到飲片的在庫養護如庫房的管理和飲片的保存等,都需要在實踐中結合理論行摸索和總結。
  17. Following the approval of the relevant manualsmaintenance scheduleflight test schedule and the conducting of inspections of its facilities and route proving flights to ensure its fulfillment of the department s requirements, an aoc was granted to cr airways on march 16

    民航處又審批有關的手冊維修作業表飛行試驗表,其設施和監察其航線驗證試飛,確保該公司符合處方各項要求后,於三月十六日簽發航空營運許可證予該公司。
  18. Following the approval of the relevant manualsmaintenance scheduleflight test schedule and the conducting of inspections of its facilities and a proving flight to ensure its fulfillment of the department s requirements, an aoc is granted to cr airways for the operation of its crj - 200 aircraft

    民航處審批有關的手冊?維修作業表?飛行試驗表等,相關設施和監其載客飛行試驗,確保符合處方各項要求后,始簽發許可證予中富航空營運crj - 200型飛機。
  19. As the production schedule is assigned, any department must carry out unconditionally. the production dispatcher should follow in time the implementation of the plan of the workshop to feedback the problem in time and solve them asap. 3

    加大綜合,對那些有章不循違章違紀者給予相應的經濟處罰及必要的行政處理,在企業內部真正形成一種紀律嚴明緊張有序積極取的良好工作氛圍。
  20. Spot censorship, it is to show environmental protection department is other perhaps lawfully the ministry door of exercise environment supervisory administrative power, right administer the blowdown circumstance of unit of the blowdown inside limits and the system that pollute the circumstance such as processing to undertake the spot is checked

    現場,是指環境保護部門或者其他依法行使環境監督治理權的部門,對管轄范圍內排污單位的排污情況和污染治理等情況行現場的制
分享友人