步進梁框架 的英文怎麼說

中文拼音 [jìnliángkuàngjià]
步進梁框架 英文
walking beam frame
  • : Ⅰ名詞1 (步度; 腳步) pace; step 2 (階段) stage; step 3 (地步; 境地) condition; situation; st...
  • : 進構詞成分。
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • : 框名詞(框架; 框子) frame; case
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • 步進 : step by step步進操作 step by step operation; 步進傳動 step by step drive; 步進法 step by step met...
  • 框架 : [建築] frame; framing; shell frame; skeleton frame; frame mount; trellis; sash; pigsty(e); rack...
  1. In this paper, the steps and frame of analysis and design is presented and the influence of column capital, drop panel, edge beam and flat beam on structural analysis is introduced

    在本文中,還給出了預應力混凝土板柱結構用等代行分析和設計的驟和圖,闡述了柱帽、托板、邊、扁對結構內力分析的影響。
  2. On the basis of research achievements under small earthquakes, some failure dependency rules of beam and column are obtained under strong earthquakes

    在小震研究成果的基礎上,對鋼筋混凝土結構在大震情況下的失效相關性問題研究,得出、柱在大震作用下的部分失效相關性規律。
  3. This paper, in allusion to damage of expansion joint of bridge, introduces a sort of new structure of jointless device - semi - integral abutment jointless bridge, and establishes model of general structure finite element of this bridge, and in details analyses its qualities of stress. the model considers the interaction of superstructure - substructure - soil. resistance of the soil behind abutment adopts still soil pressure and elastic resistance when the temperature rising, but active soil pressure when dropping. analysis of qualities stress of bridge includes of action of dead load, car load, temperature load of season character. taking an 100m length pc semi - integral abutment jointless bridge as instance, the paper establishes the model of plane frame by applying large common software - anasys, and analyses it by elastane and large deformation to imitate character of stress and deformation of general bridge. at the same time corresponding models of finite element of joint bridge and integral abutment bridge are established, and unique stress and performance of structure of semi - integral abutment jointless bridge are researched by comparing and analysing character of three different models under same loading, and controlling factor of design and constitution are generalized. in conclusion, for semi - integral abutment jointless bridge, on one hand shear, moment and deflection of the main beam and axis force of substructure are approximate with that of joint bridge, and integral stifmess of structure is increased and damage of expansion joint is eliminated, on the other hand there is axis force in main beam, shear and moment of substructure are bigger than that of joint bridge. in all this type of jointless bridge has rational stress and is worth of application and popularization

    半整體式橋臺無縫橋計算模型考慮了上部結構-下部結構-土的共同作用;臺後土抗力升溫時採用靜止土壓力加彈性土抗力,降溫時採用主動土壓力;分析橋受力性能時考慮了結構自重、車輛荷載和季節性溫變荷載的作用。以一座橋長100mpc半整體式橋臺無縫橋為實例,採用大型通用軟體ansys建立平面模型,行彈性、大變形分析,模擬全橋受力和變形特點;同時建立與此對應的有伸縮縫橋和整體式橋臺無縫橋有限元模型,通過三種橋型同加載對比分析,研究半整體式橋臺無縫橋獨特的受力特點和結構性能,總結其設計控制因素和構造要求。通過本文研究知:半整體式橋臺無縫橋的剪力、彎矩、撓度和下部結構的軸力與式橋相近,結構整體剛度增大,併除去了伸縮縫病害;但主增加了軸力,下部結構剪力、彎矩較式橋大;綜合分析是一種受力合理有實踐和推廣價值的橋型。
  4. Based on such characteristics and the researches of the country and outside, this paper mainly studies at the automatic distribution of prestressing cables of prestressed concrete beam bridge and the automatic working drawing of the steel bundles. in this paper, based on the study of the group of the project, it sets up a fuzzy optimum math - model of the prestressed degree for prestressing cables disposition of prestressed concrete continuous beam bridges. and in the drawing of the steel bundles, the set up of the " prestressing cable model " makes its course convenient

    本文針對現有的橋cad系統的不足,從工程實際應用的角度出發,初構想了預應力混凝土橋cad系統的,並主要在其自動配束以及預應力鋼束布置圖的自動繪制方面作了一定的分析與研究:在配束方面,根據其設計的特點及存在預應力束調配過程煩瑣的現象,引入數學方法,基於模糊集合和預應力度的概念,初探討了連續橋預應力鋼束自動配置的機理;在鋼束圖的繪制上,根據對鋼束特點的分析,提出了「鋼束模型」的概念,對預應力束行描述,並給出了控制「鋼束模型」以及鋼束布置的參數,據此,作者採用fortran語言編寫了鋼束布置圖的繪製程序,實現了鋼束布置圖的自動繪制。
分享友人