段塞處理 的英文怎麼說

中文拼音 [duànchǔ]
段塞處理 英文
slug treatment
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  • : 處名詞1 (地方) place 2 (方面; 某一點) part; point 3 (機關或機關里一個部門) department; offi...
  • : Ⅰ名詞1 (物質組織的條紋) texture; grain (in wood skin etc ) 2 (道理;事理) reason; logic; tru...
  1. Villefort stood watching, breathless, until his father had disappeared at the rue bussy. then he turned to the various articles he had left behind him, put the black cravat and blue frock - coat at the bottom of the portmanteau, threw the hat into a dark closet, broke the cane into small bits and flung it in the fire, put on his travelling - cap, and calling his valet, checked with a look the thousand questions he was ready to ask, paid his bill, sprang into his carriage, which was ready, learned at lyons that bonaparte had entered grenoble, and in the midst of the tumult which prevailed along the road, at length reached marseilles, a prey to all the hopes and fears which enter into the heart of man with ambition and its first successes

    然後他轉過身來急忙去他留下來的那堆東西,把那黑領結和藍披風進旅行包的箱底里,把帽子仍進了黑洞洞的壁廚里,把手杖折成幾,一下子投進了壁爐,然後戴上他的旅行便帽,叫僕人來,用眼色示意讓他不要提任何問題,付了飯店的賬,跳上那輛早已等候著的馬車里,他在里昂得知波拿巴已進入格勒諾布爾,沿途到都是兵荒馬亂的,他終于到達馬賽,這個野心勃勃的人初嘗成功的喜悅,但同時,他心中又充滿了種種希望和憂慮。
  2. The results indicate that the thermal stress and comprehensive stress of 6aa dam section and f6 fault concrete tuck during construction and operation are all within the allowed concrete tensive strength. the results indicate that the construction scheme of 6aa dam section and the disposal scheme of f6 fault is feasible and meet the need of dam temperature control and crack. prevention

    計算分析表明,施工期和運行期6aa壩及f6斷層混凝土的溫度應力、綜合應力均未超過該工程碾壓混凝土的設計允許抗拉強度,表明6aa ,壩的施工方案和f6斷層的方案在溫控和防裂方面是可行的。
分享友人