母線聯接 的英文怎麼說

中文拼音 [xiànliánjiē]
母線聯接 英文
bus-coupler
  • : Ⅰ名詞1 (母親) mother 2 (泛指女性長輩) one s elderly female relatives 3 (配套的兩件東西里的凹...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : Ⅰ動詞(聯結; 聯合) unite; join Ⅱ名詞(對聯) antithetical couplet
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • 聯接 : [電工] strapping; coherence; lashing; link up; coupling; [宇航] mate聯接板 gusset piece; gusset p...
  1. Based on analyzing the disadvantage of gripping device connecting technology between anode rod and bus to the roasting of aluminum reduction cells, the new method of flexible connecting device between anode rod and bus is proposed

    摘要文章在分析導桿與夾具夾緊連方法對鋁電解槽焙燒的不利影響的基礎上,提出了軟新方法。
  2. The characteristics : the unit is composed of high voltage parallel capacitor, serial reactor, switch ( disconnector, grounding switch, breaker etc. ), lightning arrestor, fuse, discharging coil, current transformer, insulator, busbar and steel bracket, includes two kinds of structure : frame type and cabinet type

    產品特點:裝置由高壓並電容器、串電抗器、開關(隔離開關、地開關、斷路器等) 、避雷器、熔斷器、放電圈、電流互感器、絕緣子、排和鋼架組成,裝置有框架和櫃式兩種結構。
  3. After electric heating system is installed, check electrical insulation of all circuits. the insulation resistance between generatrix and shielding layer, core wires of series cable before connection at end not be less than 20 m. and then check if dc resistance of circuit is normal and phase resistance is banlance

    電伴熱系統安裝完工後,應逐路檢查系統的絕緣電阻:各種電熱帶與屏蔽層之間、串帶芯尾端末短前的各芯間絕緣電阻均應不小於20m ;然後再檢查電熱帶直流電阻是否正常,三相電阻是否平衡。
  4. Then the paper uses the same typical four network operating conditions as the primary given conditions and when adding one set of the parallel capacitor bank, changing the 330 / 220kv transformer tap changer position step by step to change the transformer ration, through this study methods this paper found out all the optimized combination of the tap changer position and the amount of input reactive power, also obtained four sets of the 330kv, 220kv and hokv s / s bus voltage and the active and reactive power losses changing curves. through analyzing the optimized combination control curve and the network power flow, the paper generalizes the rules as following : the chief measure of coordinative control is inputting shunt reactor in chengxian s / s in winter time both in the planning year of 2010 & 2005 ; in summer time in planning year of 2010 the chief measure is to input proper shunt capacitor

    本研究通過分析所獲得的最優綜合控制組合曲及電網潮流,總結出了如下規則:隴南電網在2005年及2010年冬大、以及2005年夏小運行方式下,綜合控制應以成縣變投入適量並補償電抗器作為主要措施;在2010年夏小運行方式下則投入適量並補償電容器作為主要措施,再輔助以選擇合適的主變有載調壓分頭來調節,達到控制網內無功潮流分佈合理、各變電站電壓在理想的范圍內時電網有功損耗最小,從而也提高了電網安全運行水平及供電質量。
  5. In 2004, the company s technology development department has actively and successfully developed the shield - type american - style european - style cable heads, high - low - voltage cable branch cases for load switch busbar coupler system, outdoor ring network cabinets, box - type transformer substations and auxiliary products, which have passed the authentication one after another and been launched into the market in large batches, giving a strong support to the upgrading of the national urban power grids and the construction of key projects ; in 2006, the company has developed the four - splitting and dual - splitting wire and cable box and released to market ; the 2nd half of 2006, over 500kv ultra - high voltage electrical hardware being developed for 2007 market ; four products awarded national patents in 2006

    2004年公司技術開發部積極開發了屏蔽型美式歐式電纜頭,負荷開關母線聯接系統的高低壓電纜分箱,戶外環網櫃,箱式變電站及配套產品相繼通過鑒定,大批量投入市場,有力支持國家城網改造與重大工程建設2006年公司又研製出四分流二分流電電纜分盒,已投放市場2006年下半年,正在研製開發超高壓500kv及以上電力金具,有望2007年投放市場2006年有六種產品已申請國家專利。
  6. The study bases on the four operating conditions of which the longnan network will be implemented in the year of 2005 and 2010. first, this paper calculates the power flow distribution that including the line charging reactive power and input of the low - voltage shunt reactor in chengxian s / s. assumed that the bus voltage of tianshui s / s and bikou power plant to be constant, the study count the voltage level of the 330kv and 220kv bus - bar when the 330 / 220kv transformer in standard tap changer position. in order to set control rules

    本文基於隴南電網在規劃發展水平年2005年及2010年的四種可能的運行方式下及潮流條件,計算出了計入路充電無功及投入成縣變低壓並電抗器后的潮流分佈,在設定甘肅大網側及碧口電廠側電壓恆定條件下,計算了330kv及220kv主變在有載調壓標準分頭變比下的330kv及220kv電壓水平。
  7. Because of forecasting reactive load at first, it can detect the change of voltage at low - voltage bus from the change of reactive load or the change of voltage at high - voltage bus, then it can decide that adjusting transformer tap or capacitor switch, and avoid blindly and deficient adjusting. on the condition the reactive power is balanced and voltage qualified, it can realize the switching times of loaded taps and capacitors being efficiently decreased

    由於預先預測出無功負荷,提前了解了無功功率變化的趨勢,可以有助於判定低壓電壓變化是由無功負荷變化引起還是由高壓側電壓變化引起,從而適時決定是調有載調壓變壓器分頭還是投切電容器,以此避免了盲目和不充分的調節,實現在保證無功基本平衡和電壓合格率的前提下,減少有載調壓變壓器分頭的調節和並電容器組的投切次數。
  8. Paralleling breaker a paralleling breaker is the circuit breaker that connects the generator set to the emergency bus, and across which all the individual generator synchronizing functions occur

    開關並開關是連發電機組和應急排的路斷路器,所有的單個發電機通過它完成同步運行。
  9. In fault state, a double circuit transmission line can he decoupled into common sequence component network and differential sequence component network

    由於並電抗器的安裝,直測取雙回兩端處的電壓及路流過的電流進行測距,必然會引起誤差。
分享友人