比降 的英文怎麼說

中文拼音 [jiàng]
比降 英文
gradient
  • : Ⅰ動詞1 (比較; 較量高下、 長短、距離、好壞等) compare; compete; contrast; match; emulate 2 (比...
  • : 降動詞1. (投降) surrender; capitulate 2. (降伏) subdue; vanquish; tame
  1. So this article analyses deeply in the method of ensur ' my designing food rolume which is an important element to affect the " designimy height of bridge " it brings forward an " arverage optiminmy suiting line " method which is a bondage discommode series at the same time it puts forward a ensurmy principle for rough coefficient " and " fallimy flood proportion which are both suitable to heilongjiang province at last this article introduces the " three - days rainimy rolume " method

    本文立足於黑龍江省各種河流的洪水特點,結合以往工程實際,對影響跨河橋梁設計高度的主要因素? ?設計洪水流量及其相應洪水位的確定方法加以詳細分析。提出有約束不連序系列的加權優化適線法及適合於黑龍江省的河流粗糙系數和洪水比降的確定原則,並介紹了三日雨量法。
  2. As a practical application, the safety situation of jiujiang dike under the 1998 pluvial condition of once a hundred years in yangtze river has been evaluated by the reliability method from the point view of the seepage stability in terms of probability analysis and two dimensional saturated seepage finite element analysis combining with the mechanism of seepage burst in jiujiang dike summarized in the thesis

    通過滲流有限元和滲流可靠性分析論證了1998長江流域特大洪水災害中九江市防護大堤發生的嚴重潰口破壞的滲流破壞機理。分析、較得出結論:堤防下游坡腳的出逸比降接近和超過臨界比降,在1998年長江百年一遇的洪水條件下九江大堤潰口斷面的抗滲可靠性僅在55左右的非常低水平。
  3. In this study, we found that the activity of cytochrome oxidase in sos2 was lower than wild type

    在本研究中我們發現, sos2突變體中細胞色素氧化酶活性與野生型相比降低。
  4. The results of carp ' s growth performance indicated : the mixed nutrient solution of psb could improve the increase of carp ' s weight than other three groups ( carp ' s diet of juxing, flavomycin, " yixubao " ), they are 9. 5 %, 9. 6 %, 15. 4 % respectively. and it could decrease the feed consumed / gain of carps than others, they are 2. 6 %, 6. 3 %, 4. 8 % respectively. all those showed that the mixed nutrient solution of psb could enhance the growth performance of carp

    光合細菌復合培養物作為飼料添加劑應用於鯉魚生產試驗,在飼喂35天後試驗組總增重分別某公司魚飼料組、添加黃黴素組( 3ppm ) 、 「益畜寶」組提高9 . 5 、 9 . 6 、 15 . 4 ,料肉比降低了2 . 6 、 6 . 3 、 4 . 8 ,說明光合細菌可以提高鯉魚的生產性能。
  5. The factors include antecedent precipitation of low flow period and status of karst basins ( such as lithology, landform, drainage area, drainage density, length and ratio of demotion of main river and so on. ). based on the former studies, integrated the conventional statistic methods, the technique of anns is applied in this paper for researching the law of the low flow of karst basins in guizhou altiplano

    影響喀斯特流域枯水徑流的因素異常復雜,其影響因素主要有枯季前期水量和巖性、地貌、流域面積、河網密度、主河道長度及其比降等流域下墊面狀況。本文在前人研究的基礎上,採用人工神經網路技術,結合傳統的統計方法,研究貴州高原上喀斯特流域的枯水徑流規律。
  6. The bulk of effect on dredging river for deposition reduction is relative to chosen datum of dredging channel geometry parameter. geometry parameters include dredging channel length, morphology of transversal section and longitudinal slopes

    挖河減淤效果的大小與挖槽幾何參數的選值有關,幾何參數包括挖河長度、斷面形態及挖槽比降等。
  7. Hydraulic slope ; energy gradient

    水力坡度水力比降
  8. The main aim of system harness of man - made debris flow is to make potential debris flow not broken out and present debris flow decreased

    控制固體物質補給是關鍵,合理設計規劃棄土石渣的排放場地是重點,搞好匯水區水土保持系統工程是基礎,調整溝床比降,減少水流動能,使泥石流暴發減少到最低程度。
  9. The statistics show that the correlation of antecedent precipitation, lithology, landform, drainage density, drainage area, length and ratio of demotion of main river and four characteristics of low flow is very complex

    統計結果表明:流域的枯季前期水、巖性、地貌、流域面積、河網密度、主河道長度及其比降等因子與喀斯特流域的枯水四特徵的相關關系異常復雜。
  10. The traction motor drives through a constant ratio reduction gearbox to the standard rear axle which is the sole means of driving the rear wheels of the trolleybus

    無軌電車的動力馬達經由一恆比降速波箱,標準的巴士尾輪軸推動尾輪。
  11. ( 2 ) a series of experiments on time scale distortion are made with real river model, inflow and outflow boundary condition, and continuous simulation. by means of analysis of the experimental data on model water level, water - surface gradient, cross velocity, outflow discharge process and the sediment transportation capacity, the main physical reasons for the above hydraulic parameters deviations caused by time scale distortion are illustrated : response delay of model channel storage capacity and rate of water level with time

    ( 2 )採用真實的河工模型和入出流邊界控制條件以及連續模擬的方法進行了有關時間變態率的系列試驗,通過模型水位、比降、流速、出口流量過程線和斷面挾沙力試驗資料的分析,闡明了時間變態引起上述各種水力參數偏離的主要物理原因:模型的槽蓄響應和洪水過程時間變化率的響應滯后。
  12. The experiment data shows that the region with large surface gradients in longitudinal and horizontal direction locates at the vicinity of spur dike. backwater appear upstream the spur dike, and there exist a recirculation area at the same side downstream the spur dike

    實測水位資料表明水流縱橫向比降大的區域位於丁壩上下游附近,在丁壩的上游出現壅水,下游存在有收縮區和恢復區,離丁壩越遠縱橫向水位的變幅越小。
  13. Abstract : variations of flow pattern, flow velocity in deep poo l and side bar, mainstream thread, and water surface, caused by excavation project, are investigated by two - dimensional mathematical model in an orthogonal curvili near coordinate system. the change of bed - load transport rate, and redeposition r ate are predicted. the influences of the excavation project on navigation are ana lyzed. grid - type and flat - type excavation alternatives are proposed and discuss ed

    文摘:採用正交曲線坐標系下的河道平面二維數學模型,研究了嘉陵江何家磧邊灘采砂后河道流勢、流態、灘槽流速、主流位置、水面高程及比降的變化規律,預測了采砂方案完成後卵石推移質輸沙率變化及其對航道的影響,並對格形開挖和平整開挖方案進行了較分析
  14. It shows that the water level in the definite reach is lower than that with same discharges before dredging river, the surface slope on upper reaches dredged is enlarged and deposition load on bed is reduced or eroded

    主要表現在可以引起一定范圍河段內的水位較挖河前同流量下有所低,開挖上遊河段水面比降增大,床面淤積量有所減少或發生沖刷。
  15. With the using of microsoft visual basic 6. 0, a multimedia computer - aided design system of small type pumping irrigation district is developed in this paper. provided with the live multimedia messages as well as a good man - machine conversation mechanism, this system can help the user to finish the planning of an pumping irrigated area such as the layout of canal system, the selection of pump models, the establishment of the irrigation program, the calculating of canals " parameters, the estimate of the project magnitude, the selection of the field constructions, the economic analysis of the project, the output of results, etc, a new oo ( object oriented ) programming method is adopted in this system, various softwares are integrated in this systems as well by the " automation " technic provided by vb, in addition, the multimedia technic is applied to this system for the first time, it makes the system easy to ope rate. as for the optimization of the canals " section, a new optimization method is adopted based on the existing theories about the canals " section, and in this way, with the purpose of minimizing the project ' s investment as well as a stalized canal, limited by the longituding slope, the canals " best feasible parameters can be deduced. furthermore, a integral method to reckon the earth work is developed in this paper, by this way, the estimate precision of the earthwork is enhanced notably. this paper includes the particular illumination for the developing procedure of each systems " segment, and in the end, the directions of the system are demonstrated in a sample area which lies in the zhaija village, taizhou city, jiangsu province, the running results showed that the initial purposes are achieved effectively, and it has a preferable practicability

    在渠道縱橫斷面優化方面,本文在利用已經較成熟的縱橫斷面優化理論的基礎上,提出以工程總費用最小為目標函數,以渠道縱坡i為控制變量,以渠道不沖不淤流速及灌區允許地面比降為約束條件,通過縱橫斷面聯動優化的方法得到渠道的最佳工程可行的斷面參數。另外,針對部分地區的取土困難的狀況,本文採用積分法計算渠道工程土方量,從而大大提高了土方量的估算精度,有助於準確控制工程投資規模及資金投向。本文詳細闡述了該系統所採用的編程方法、系統構成、系統各組成模塊的開發過程以及灌區規劃所採用的優化方法及原理,最後應用本系統對泰州市翟家村機電灌區進行規劃設計,運行結果證明其操作較簡便,界面友好,運行速度快,規劃成果合理,基本達到了系統預定的要求,具備較強的實用性。
  16. Total vehicle production volume dropped by 3. 3 % year on year in january - april, and production levels are set to drop further over the next year or so

    在1月到4月,總的車輛生產額與同年相比降低了3 . 3 % ,生產的水平在明年也開始大幅度的下滑。
  17. The reduced level of cell - free rumen fluid had no significant effect on xylanase production, but had significant effect on the cmcase activity. without cell - free rumen fluid, the high concentration level of yeast extract could improve xylanase and cmcase production. in the third section, crude enzymes produced by anaerobic fungus a4 was extracted, and their characteristics of the crude enzyme was also investigated

    與基礎產酶培養基相低培養基中無細胞瘤胃液濃度對厭氧真菌所產木聚糖酶的酶活及活力無顯著影響( p 0 . 05 ) ,但對其所產的羧甲基纖維素酶的酶活及活力有顯著影響( p 0 . 05 ) 。
  18. The width of main channel would influence the water level rising rate greatly in flood events. when the discharges in main channel increased to 8000 m ' / s from 3000 m3 / s the water rising amplitude at hydrometer stations in the lower yellow river was correlative well with the exponent ( - 0. 65 ) of main channel width and the exponent ( - 0. 33 ) of river longitudinal slope

    洪水期主槽寬度對水位漲率有較大影響,主槽流量從3000m ~ 3 s增大到8000m ~ 3 s時,下游各水文站斷面水位的抬升幅度與主槽寬度的( - 0 . 65 )次方和河道縱比降的( - 0 . 33 )次方具有較好的相關關系。
  19. Considering the joint operation of the three gorges and gezhouba hydropower stations, influences of the daily regulation planning of the hydropower stations on the water surface slope of the downstream reach of the three gorges reservoir are studied

    ?結合三峽和葛洲壩兩電站聯合運行的實際情況,研究了調節方案對三峽水庫下遊河道水面比降的影響。
  20. ( 2 ) the results of the rainfall - affected runoff scouring experiments in lab. when the rainfall intensity was less than l. omm / min, the soil erosion caused by the combination of rainfall and the upslope runoff was more than that caused by only the simulated rainfall. when the rainfall intensity was more than 2. 0mm / min, the upslope runoff strengthened the effect of the runoff yielded in the local area on the dyke slope surface, and the effect increased with an increase of rainfall intensity

    2 、室內模擬雨+放水沖刷試驗結果雨強小(如i 1 . 0mm min )時,上游注入水量對戧坡侵蝕作用比降雨在戧坡上所產生徑流的侵蝕大;雨強大時( i 2 . 0mm min ) ,上游水量下泄與當地雨徑流一起增強對戧坡面的侵蝕作用,雨強越大,侵蝕作用也越大。
分享友人