毛石基 的英文怎麼說
中文拼音 [máodànjī]
毛石基
英文
rubble mound-
The factory undertakes the composing of the following business mainly : white marbl carved stone crouches the lion, the sleeping white marbl carved stone lion leak from the lion, white marbl carved stone, white marbl kylin, white marbl mythical wild animal ( pixiu ), white marbl dragon and phenix lamp pole, white marbl ornamental column, the cattle opening up virgin soil, white marbl figure of the buddha, the top of a pillar stone, white marbl fairy maiden, white marbl personage, white marbl carved stone elephant ( figure in stone ), white marbl dolmen, white marbl shi ting, stone bridge, white marbl stele, white marbl check dragon post, white marbl balustrade, granite dysmorphism, stone strip, flat piece of stone, foundation stone, door block, jade article treating, emboss, ornamental column, dragon post, lettering, silica sand, white marbl woollen cloth, ancient times build gardens ( breast board, platform ming dynasty, artificial stone with textures cut with an axe, rockery design, flowerpot, eroded limestone, mechanism cobblestone, mushroom stone etc. ), rockery fountain, nursery stock flowers and plants etc. paper of, saying that the stone table, stone bench, stone light, board carve characters on a seal, the column, vase post, window cover with, the door pocket, geomantic omen ball wait, and managing
本廠主要承做以下業務:漢白玉石雕蹲獅、漢白玉石雕走獅、漢白玉石雕臥獅、漢白玉麒麟、漢白玉貔貅(皮休) 、漢白玉龍鳳燈柱、漢白玉華表、拓荒牛、漢白玉佛像、柱頂石、漢白玉仙女、漢白玉人物、漢白玉石雕大象(石像) 、漢白玉石牌坊、漢白玉石亭、石橋、漢白玉石碑、漢白玉盤龍柱、漢白玉欄桿、花崗巖異形、石條、石板、漢白玉奠基石、門墩、玉器加工、浮雕、華表、龍柱、刻字、硅砂、漢白玉毛料、古建園林(欄板、臺明、剁斧石、板道、石桌、石凳、石燈、牌匾刻字、圓柱、花瓶柱、窗套、門套、風水球等,並經營假山石、花盆、太湖石、機制鵝卵石、蘑菇石等) 、假山噴泉、苗木花卉等。Sixties primers were used for dna amplification and a total of 237 amplification products range from 450bp to 2500bp were generated. a similarity matrix for all pairwise comparisons was calculated using nei and li ' s formula and then transformed to distance matrix. dendrograms were constructed by applying unweighted pair - group arithmetic average ( upgma ) and neighboring - jointing cluster analyses using the phylip software
在第二部分,應用改進的ctab法提取了石蓴屬和滸苔屬各3個種及作為對照的剛毛藻的基因組dna , 60個引物被用於擴增,共獲得237個片段大小在450 - 2500bp之間的擴增片段,依據nei和li ( 1979 )的公式計算出樣品成對比較的相似性距陣並換算成遺傳距離,應用phylip軟體包,按照upgma法和n - j法分別構建聚類圖。The association of larval and adult stages of ecologically important caddisfly ( insecta : trichoptera ) using mitochondrial dna sequences larval and adult amplification fragments were cloned and sequenced. dna sequences were aligned using clustal x software ( gene codes corporation )
線粒休dna一coi 、 u基因序列在毛翅目成幼蟲聯系中的應用研究擴增並測定了4種鱗石蛾的成、幼蟲的mtdnacoi 、 coh及trna一leu基因序歹『 j 。Cementitious capillary crystalline waterproofing coating ( abbreviated ccwc ) is a new type of cement - based waterproofing materials, which is characterized by its very good adhesive performance and impermeability to water, self - rehabilitating ability, permanent waterproofing effect, good aging resistance and corrosion resistance, simple construction method and harmless to hunman etc. ccwc consists of ordinary portland cement, quartz sand and reactive substances and other supplementary ingredients, whose reactive substance can permeate into the internal part of concrete structures through water and produce insoluble crystals filling capillary pores or crack of the concret through reaction with cement hydrates and unhydrates
水泥基滲透結晶型防水材料是以硅酸鹽水泥或普通硅酸鹽水泥、石英砂等為基材,摻入活性化學物質而組成的一種新型防水材料。摻入的活性化學物質以水作載體向混凝土內部滲透,與混凝土中未水化的水泥及部分水泥水化產物發生結晶反應,生成不溶於水的結晶體,堵塞毛細孔道,使混凝土緻密、防水。這種防水材料具有粘結力強、抗滲性能好、自愈合能力強、防水效果持久、耐老化、耐腐蝕、易施工、對人類無害等特點。Rock fill mound foundation
毛石堆地基Figure 7 - typical section of rock fill mound foundation for cooling water pumping station
圖7 -冷卻用水抽水站毛石堆地基剖面圖The pile foundation or mat foundation methods would cost considerably more than 10 times that of a rock fill mound foundation
-樁柱地基與席式地基的造價較毛石堆地基的造價超出10倍。The alternatives for foundation design are rockfill mound foundation, the pile foundation driven piles or bored piles and the mat foundation
-地基設計方案包括毛石堆地基樁柱地基打入樁或鉆孔樁及席式地基。The slope of the rock fill mound is inclined about 35 degrees to the horizontal. the deeper the dredging level, the wider the base of rock fill required
-毛石堆與水平面的角度約35o ,越挖得深,毛石堆地基底座的闊度便要越大。The rock fill mound foundation has the merit of simple construction method. after dredging the soft marine clay, the rock fill is then laid into position by barge until the desired elevation is reached
-毛石堆地基的優點是建造方法簡單,只需在挖走松軟的海泥后,以躉船把石填料投放在適當位置至所需的高度。分享友人