水上發電站 的英文怎麼說

中文拼音 [shuǐshàngdiànzhàn]
水上發電站 英文
floating power plant
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 上名詞[語言學] (指上聲) falling-rising tone
  • : 名詞(頭發) hair
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 水上 : water; overwater; water borne; aquatic水上芭蕾 water ballet; aquathenics; 水上城市 aquapolis; 水...
  • 電站 : power station電站船 generating ship
  1. Along with the a enhancing proportion of hydroelectricity in the whole electricity system in our country, the increase of the single unit capacity, the faults ratio of the large - scale hydropower units is more and more important to the whole system safe operation, if we do n ' t manage it well, it will cause the collapse of the whole system and bring a great loss of country ' s economy, hi addition, accompany with " to dispart plant and grid, connect to the grid according to the price " put into practice, how to control the production cost of the power plant has to be put into consideration

    隨著我國在系統中所佔比重的增加及單機容量的增大,大型和機組的故障率對系統的安全運行也越來越重要,如果處理不好,甚至會引起整個系統的崩潰,給國家帶來巨大的損失。另外,隨著我國「廠網分開,競價網」的逐步實施,如何控制廠的生產成本,也將提各個廠的議事日程。
  2. Based on the demand of power department, a full distributed multifuncitional monitoring device is studied. this instrument not only can measure the data of hydroelectric plant, but also integrate the funcition of control the dynamotor, by cooperate with the program of epigynous system, it can realization the auto generate electricity on the hydroelectric plant and ordinal startup - stop of the dynamotor. 2 furthermore, performance of integrated dft arithmetic enhances the acturacy and reliability of measure. by communication several devices can run online to be controlled dispersedly and managed centrally

    本文分析了國內外自動控制裝置的研究和展狀況,尤其是國內小型的自動化現狀,針對現有力部門的需求,設計並實現了一種單元式的微機自動監控裝置,該裝置不僅實現了對內各種模擬參數和數字信號的實時監測功能,還對機組進行了調控,通過與位機處理程序的配合,可以實現的自動控制、機組順序啟停;在測量機組機端壓和流參數的時候,採用32點離散傅立葉演算法( dft ) ,增加了測量的準確性和可靠性;通過通訊可以實現裝置的聯網運行,做到「分散控制、集中管理」 。
  3. Hydropower stations of shiquan and xihe river both lie on the hanjiang river upstream and work in multifunction of irrigation, flood control, water carriage, aquiculture etc. in addition to electric power generation

    石泉、喜河位於漢江游,均以為主,兼有防洪、灌溉、航運、養殖等的綜合利工程。
  4. Aiming at the compensation benefits calculation combined with development layout of the yellow river mainstream cascades is now taken into account the dynamic characteristic of different level years, the compensation benefit simulation model of the yellow river mainstream cascade reservoirs is adopted to calculate the power generation compensation benefits of the yellow river upstream run - of - river power stations in three level years of 2000, 2010 and 2020

    摘要針對以往補償效益的研究都是靜態計算而言,本文結合不同平年黃河幹流梯級的滾動開規劃,考慮不同年代補償效益的動態特性,採用黃河幹流梯級庫補償效益的模擬模型,計算了2000 、 2010以及2020三個平年黃河游徑流式梯級補償效益。
  5. Ln power system full dynandc simulation, the electric - mechanical transient processes of dynamic elements of power system should be simulated in detail, and the detailed dynandc models of mid - term and long - term processes are necessary based on the research and analysis for the ndd - term and long - term models, the dynandc models, such as thermal power plant, hydraulic power plant, nuclear power plant and the automatic generation control ( agc ), which are necessary to power syst

    力系統全過程動態模擬除了需要詳細模擬力系統動態元件的機暫態過程外,還要有詳細的中長期過程的模型。本文在綜合調查和分析的基礎,研究了力系統全過程動態模擬所需要的火廠動力系統的數學模型、廠動態模型、壓堆核模型以及自動控制( agc )模型及其演算法,並在力系統全過程動態模擬軟體中得到了實現。
  6. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂位於四川省阿壩藏族羌族自治州汶川縣境內的岷江河段為低閘引式開。正常蓄位1268 . 0m ,最大閘高31m ,庫容297 . 4萬m ~ 3 ,引隧洞長19 . 57km ,裝機360mw 。福堂閘壩建於深厚覆蓋層基礎,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。
  7. Di - on electrics service and products cover the power electric field including power generation transmission distribution, power equipment manufacturing, subway, utilites, ac dc metrology field as well, more than 500 units of electric power utilities and stations such as beijing power supply bureau, guangzhou power supply bureau, baosteel, three gorges power station and more manufacturers like siemens, abb, alstom, bicc, pirelii, toshiba and more and 30 units of metrology institutes in china like nim, tsinghua university and more are our user. di - on electric is sole and exclusive distributor for numerous famous companies like transinor doble norway, measurements international canada, ndb canada, schuetz germany, aan germany, dr. strauss germany and etc, taking care of their business and service in p. r. china including hongkong

    絕大多數員工擁有本科和研究生以學歷,在力系統和計量系統工作多年,從事力檢測帶監測和計量測試儀器的技術服務和市場銷售工作長達10年以,為約500多家力工業系統的部門如北京供局,廣州力局,深圳供局,三峽廠,廣州抽蓄能廠,田灣核等等,科研調試部門如廣東省力試驗研究所,湖北省力試驗研究所等等與設備生產廠如siemens , abb , alstom , toshiba等等提供了國際最先進可靠的測試技術和儀器設備為約30多家國內二級以相關計量科研院所,包括國家計量院,清華大學,中國運載火箭研究院,空間技術研究院,航天二院,成飛,西飛和各省市計量院,力試驗研究院所等提供了大量最先進可靠的計量檢測儀器。
  8. To stand on the three gorge dam, you could see at plate force of unequal than any other hydraupower plant on earth

    在三峽大壩頂,你看到的是地球最壯觀的
  9. Hunan general motor pump industry limited a complete range of products, involving metallurgical machinery, mining transport, energy development, power plant auxiliary equipment sets, urban transport, ships, ports and offshore drilling platforms electrical and mechanical equipment, power distribution equipment, high - rise city, - complete sets of equipment, water supply and drainage pumping station complete sets of equipment, water projects, environmental protection projects, as well as wire and cable, electrical materials

    湖南通用機泵業有限公司的產品門類齊全,涉及冶金機械,礦山采運,能源開輔機成套,城市交通,船舶,港口和海鉆井平臺機設備,輸配設備,城市高樓控成套設備,給排成套設備,利項目,環境保護項目以及纜,工材料等。
  10. Mechanical vibration - evaluation of machine vibration by measurements on non - rotating parts - machine sets in hydraulic power and pumping plants

    機械振動.在非旋轉部件測量評價機械振動.廠和泵機組
  11. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型機組的科學研究。
  12. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型機組的科學研究。
  13. The axial - flow turbine generator set is suitable for low head from 2m to 70. its feature is that the water flow passes through the runner axially. the axialflow turbine generator set can be classified into two forms according to the runner construction : one is fixed blades propeller for small variation of head and power, the other is movable blades kaplan for large variation of head and power

    貫流式機組是低頭大流量的較好機型,一般適用於頭2 ~ 15米,其特點是流從進口到尾出口都是軸向的,流道基本成直線,因而貫流式機組具有流特性好,效率較高等特點。
  14. The focus domains of b - king are as follows : infrastructure such as hydrodynamic power plant, speedway ; renewable energy resources project such as floating ocean wave energy power plant and other marine resources project ; heavy - duty, special equipment high - tech project such as intelligent tridimensional parking garage ; living tissues technology and overseas listing, etc

    事務所服務的領域主要集中在、高速公路等基礎、能源項目,漂浮式海洋能等可再生能源與資源類的項目,全智能立體停車庫等重型特種裝備高科技產業,組織工程生命科學新型生物高科技產業,及海外市。
  15. The axial flow type turbines manufactured by the ganfa, are raging from 3 to 45m in water head, 100kw to 30mw in capacity and 0. 8 to 6m in runner diameter. in recent years, ganfa gained fast growth in this type of turbines. since manufacturing type zz560 - lh - 250 3. 2mw units for the nanhe power station in jiangxi, ithas also manufactured type zdjp502 - lh - 275 5. 5mw units for the niubilong power station in chongyi, jiangxi, and zd680 - lh - 420 4. 5mw units for the shamaoshi power station in shanghang, fujian

    我公司軸流式輪機適應頭345m ,轉輪直徑0 . 86m ,容量10030000kw ,自80年代為江西南河廠生產zz560 - lh - 250型3 . 2mw機組以來,軸流式機組有較快的展,近年來又先後為江西牛鼻壟設計製造了zdjp502 - lh - 275型5 . 5mw機組,為福建設計製造了zd680 - lh - 420型4 . 5mw軸流式機組。
  16. Quantity of generating electricity should be also calculated while the river inflow, quantity of water transfer and its duration curve are taken into account. as a company, it is necessary to take a series of measures to increase its benefits while water transfer leads to the decrease of hydro power inevitablly. the efficient methods can be taken into account as follows : i ) to improve the forecast accuracy, to decrease surplus water, and to increase seasonal electricity energy, ii ) to raise the peaking ability of dan jiang kou power station to obtain peaking benefits, iii ) to choose a suitable site to construct a pumped storage plant for peaking benefits

    在進行以四方面內容深入探討的基礎,論文針對丹江口利樞紐運行任務、運行方式的重大變化,提出漢江集團應採取以下因應措施以適應企業產業結構的調整,這些措施包括:準確計算效益減少值;合理地核算源的供成本;以述兩項計算成果為基礎,核算企業結構調整后總效益變化量;提高預報平,減少棄量,爭取增季節性能;研究新的調度方式,提高調峰能力,提高的容量效益;在適當的地點修建抽蓄能,提高的調峰能力。
  17. Guishan sliding mass is located just above the intake ( outlet ) of the lower reservoir of the proposed baoquan pumped storage reservoir, being 550 - 800m long from east to west, 260 - 350m wide from south to north, 110m thick in average and up to 210m thick, with a total volume of 21 million cubic meter

    龜山滑坡體位於寶泉抽蓄能系統下庫進出口的方,滑坡體長550 800m ,寬260 350m ,最大厚度210m ,平均110m ,總方量2100 10 ~ 4m ~ 3 ,形成於距今14 21萬年,其穩定性如何直接影響下庫及整個的安全。
  18. 2. analysis to the structure and function advantage of the ring gate adopted in the xiaolangdi hydropower plant was made in the paper. the result indicate that the ring gate is adaptive for the hydropower station constructed on the silt - laden river, especially for the station working to the regulate peak value, has an advantage

    2 、對小浪底機組的筒閥結構及功用特點進行了研究,結果說明對于多泥沙河流,尤其是在網中擔任調峰和備用任務的,採用筒閥具有明顯的優勢。
  19. The bingling ( si gou xia ) hydropower station is a series of power stations on the yellow river, in order to the expropriation and the emigration be reduced, after studied the relation of water level and flux of the bingling hydropower station on the taping dam location, under the different running circumstances of the liujiaxia reservoir, to located the bingling hydropower station on the head of the liujiaxia reservoir, and keeping the total installation and the generated energy not be changed all made use of the floodwater of the liujiaxia reservoir

    摘要黃河炳靈(寺溝峽)是黃河幹流的一個梯級,為了減少征地移民損失,經對炳靈(塔坪壩址)尾斷面在劉家峽庫不同運行方式下的位與流量關系進行分析研究,在總裝機和年量基本不變的情況下,充分利用劉家峽庫汛限位,將樞紐選址在其庫尾內。
  20. The three gorges dam will be the largest hydropower station and dam in the world, with a 1. 2 mile stretch of concrete and a 370 mile - long reservoir and 525 feet deep

    工程完成後,三峽將成為世界最大的,擁有1 . 2英里長的混凝土縱向圍堰、 370英里長、 525英尺深的庫。
分享友人