水位延時曲線 的英文怎麼說

中文拼音 [shuǐwèiyánshíxiàn]
水位延時曲線 英文
stage duration curve
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : 曲名詞1 (一種韻文形式) qu a type of verse for singing which emerged in the southern song and ji...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 水位 : stage; water level
  • 曲線 : [數學] curve; bight; bought; profile; net曲線板 french curve; irregular curve; curve board; splin...
  1. This study made a conclusion ? amely in order to realize following the geological target while drilling, on the basis of making a better geological and drilling design for horizontal well, we must make full use of mwd, lwd and integrate logging to carry out lithfacy identifying in real time, the lwd interpretation and formation evaluation, to set up geological model of target formation, to select geosteering marked formation and compare simulative curves with lwd curves f to fix on the drilling direction of bit upper and declination, the position in target oil - gas layer, to revise borehole track in real time, to make it extend in reservoir better interval as possible

    研究認為,在做好平井地質設計和鉆井設計的基礎上,要實現隨鉆跟蹤地質目標鉆井,必須充分利用隨鉆測量、隨鉆測井和錄井等資料,從實巖性識別、隨鉆測井解釋和地層評價、目標層地質模型建立、導向標志層的選取及模擬對比等方面入手,確定鉆頭上下傾鉆進方向及在目標層中的置,以實調整井眼軌跡,使其盡可能在儲層物性較好的部伸。
分享友人