水位站 的英文怎麼說
中文拼音 [shuǐwèizhàn]
水位站
英文
gaging station-
Water system. water level indicator for water accumulator
水系統.泵站用水位指示器The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage
錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。Based on the demand of power department, a full distributed multifuncitional monitoring device is studied. this instrument not only can measure the data of hydroelectric plant, but also integrate the funcition of control the dynamotor, by cooperate with the program of epigynous system, it can realization the auto generate electricity on the hydroelectric plant and ordinal startup - stop of the dynamotor. 2 furthermore, performance of integrated dft arithmetic enhances the acturacy and reliability of measure. by communication several devices can run online to be controlled dispersedly and managed centrally
本文分析了國內外水電站自動控制裝置的研究和發展狀況,尤其是國內小型水電站的自動化現狀,針對現有電力部門的需求,設計並實現了一種單元式的微機自動監控裝置,該裝置不僅實現了對水電站內各種模擬參數和數字信號的實時監測功能,還對水輪發電機組進行了調控,通過與上位機處理程序的配合,可以實現水電站的自動發電控制、機組順序啟停;在測量發電機組機端電壓和電流參數的時候,採用32點離散傅立葉演算法( dft ) ,增加了測量的準確性和可靠性;通過通訊可以實現裝置的聯網運行,做到「分散控制、集中管理」 。By using the yearly data of water - sand that is gotten by a couple of adjacent hydrologic station in yellow river lower reaches, this paper makes use of kinds of math methods looking for the nonlinear disturbance among all of the factors, and introduces the thinking of analysis, logic, conclusion, inference, and random to nonlinear hydrologic forecasting. it realizes the valid approximation of the water level process in erodible - bed channel
本文選擇黃河下游兩對相鄰水文站多年水沙資料,藉助多種數學方法尋找其中的非線性擾動項,將隨機數學中分析、邏輯、歸納、演繹、隨機的思考問題方式引入到非線性水文預報中,實現沖淤河道相應水位過程的有效擬合。The spatial condition and both the technical and economic feasibilities for the layout of the light - court for the auxiliary powerhouse under the condition of higher fluctuation of the flood level downstream is basically analyzed ; in which the principles of the layout and both the spatial dimension and configuration are discussed, and then a actual design case is given with the preliminary evaluation on the ventilating and lighting effect of the light - court
初步分析了下游洪水位變幅較大等環境條件下,貫流式水電站副廠房設置自然通風採光天井的空間條件及其技術性和經濟性,討論了天井布置原則和空間尺度與形態處理,給出設計實例並初步評價了天井通風採光的效果。Baise hydraulic power plant lies in the head of yujiang river, which is 22km away from baise city
百色水電站位於鬱江上游,在百色上游22km處。A tsunami that enters the south china sea through the luzon strait would lose energy and weaken when passing over the shallow water over the continental shelf. since automatic tide gauges were installed in hong kong in the early 1950s, the hong kong observatory has detected tsunamis on four occasions, caused respectively by an earthquake in kamchatka in 1952, an earthquake in chile in 1960, another earthquake in chile in 1985 and an earthquake in luzon strait in 1988. the amplitude of the tsunami recorded in hong kong was less than 0. 5 metre in all these events
自一九五零年代初香港安裝了自動潮汐監測站以來,香港天文臺共錄得四次海嘯,引發這些海嘯的地震分別為一九五二年發生在堪察加的一個地震、一九六零年發生在智利的一個地震、一九八五年發生在智利的另一個地震及一九八八年發生在呂宋海峽的一個地震,這四次海嘯在香港所引起的水位異常都少於0The processes of surface elevation, current velocity in the compound fluid model and suspended sediment concentration in the suspended sediment transport model are verified by observed data of many stations in flood / dry season and in spring / middle / neap tide
復合流場模型的水位過程、流速過程,以及懸沙模型的含沙量過程則經過了洪、枯季及大、中、小潮的多個站點的實測過程驗證。Nilometer is widely used in the system of automatic detection and automation in many water supply such as oil industry, chemical industry, metallurgy industry, electric power, irrigation works, reservoir, bulk plant, pumping station, towns water and so on. and it is a important tool in these fields
水位、閘位計廣泛應用於石油、化工、冶金、電力、水利、水庫、油庫、泵站、城市供水等領域的自動檢測和控制系統中,是這些領域不可缺少的一種重要工具。The tailrace surge chamber shared by two units, common in hydropower stations with diversion systems, has problems of water level fluctuation and hydraulic disturbance
摘要雙機共尾水調壓室是水電站引水發電系統中一種常見的布置形式,存在尾水調壓室水位波動和水力干擾問題。Hydropower stations of shiquan and xihe river both lie on the hanjiang river upstream and work in multifunction of irrigation, flood control, water carriage, aquiculture etc. in addition to electric power generation
石泉、喜河水電站位於漢江上游,均以發電為主,兼有防洪、灌溉、航運、養殖等的綜合水利工程。Abstract : a research on theory and practice is conducted on the acoustic methods of discharge measurement in low head hydropower plant. taken hydraulic efficiency experiment in certain hydropower plant as examples, the general methods about how to locate the discharge measurement plane, install transducers and choose the integration methods are put forward. an improvement method is proposed finally
文摘:從理論上和實踐上,對低水頭電站超聲波測流進行了較為詳細的研究,並以某水電站為例,對測流斷面定位、聲路布置和面積積分給出了一般方法Taking the reach with fluctuating backwater area in jiaokou hydroplant in xiujiang river, guanxi zhuang autonomous region for instance, this paper analyzes the water - sediment characteristics of the fluctuating backwater area, calculates the design level of this reach with samples of level and discharge, etc., and propounds the determination method for the designed lowest navigable level of reach with fluctuating backwater area
以廣西繡江交口電站的變動回水區河段為例,分析了變動回水區的水沙特性,分別利用水位、流量樣本及不同方法計算與分析本河段的設計水位,提出了變動回水區河段設計最低通航水位的確定方法。The water level on the crucial wangjiaba hydrological station may soon surge above the danger line as more rains have been forecast in the next few days, cheng dianlong, deputy director of the office of the flood control and drought relief headquarters, said
防汛抗旱指揮部辦公室副主任程淀龍透露:在未來的數天內,還會有更多的降雨,關鍵的王家壩水文站的水位可能很快就要超過警戒水位Because the elevation data we have acquired through gps is too variable to satisfy the mapping accuracy requirement the elevation value is solved by the water lever observation in the hydrology station and datum horizon correction of sounding observation
由於gps的rtk模式測量所獲取的高程精度不能滿足測圖精度要求,因此其高程值是通過測量水深值、結合其統一到基準面的改正數、根據相關水文部門各水位站提供的水位觀測資料綜合計算獲得。The flow regime, sediment deposition and the loss of head of two head tanks of the sewage pumping station with different dimensions are studied by using a hydraulic model test method
摘要採用水力模擬的方法對兩個不同結構尺寸的污水泵站高位井的水流流態、泥沙淤積及水頭損失等進行了模型試驗。When the foundation and the intake tower are both important analytical objects, and the geological condition of foundation is very complex, the slope is meshed with tetrahedral element, while the intake tower is meshed with hexahedral element
本文針對百色水電站的地基和進水塔均是主要分析對象,而地基的地質條件十分復雜,提出了非一致網格位移協調解法。地基採用四面體單元和進水塔採用六面體單元。The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation
福堂水電站位於四川省阿壩藏族羌族自治州汶川縣境內的岷江河段上,電站為低閘引水式開發。正常蓄水位1268 . 0m ,最大閘高31m ,庫容297 . 4萬m ~ 3 ,引水隧洞長19 . 57km ,裝機360mw 。福堂水電站閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。Based on the research of intertidal flat topography measure at home and abroad, this article avoids some problems troublesome, such as the dependence of the station of tide gauging, precise match of images and so on. first, we monitor soil water content of intertidal flat through building correlation model between soil water content of intertidal flat and landsat tm data, then we analyse the correlation between soil water content and topography of intertidal flat, last, we extract topography of intertidal flat combining with gis
本文在總結國內外潮灘地形測量研究的基礎上,避開對潮位站的依賴和影像精配準問題,以江蘇大豐港堤附近淤泥質潮灘為研究區域,通過遙感方法建立潮灘土壤水分與tu光譜值的定量數學模型,提取潮灘土壤含水量信息,然後通過潮灘土壤水分與地形的定量關系,結合gis技術反演潮灘地形。In light of the problem of the precision of flood forecasting being influenced by the data errors of rainfall and water stage caused by the failures of the communication and the relevant equipments of the gauging stations concerned, the techniques for the automatic hydrologic data collection and transmission system such as data extraction, examination of rationality, error identification, rainfall interpolation and the intelligent error correction are studied based on the analysis on the cause of the errors occurred in the system
摘要針對流域洪水預報和水庫調度中雨量水位站點可能因通信和設備故障引起雨量和水位數據錯誤,而影響洪水預報精度的問題,通過分析水文遙測系統雨水情信息錯誤的原因,研究水文遙測系統雨水情數據的提取、合理性檢驗、錯誤識別方法、雨量插補、數據的智能化糾錯處理等技術。分享友人