水分不穩定性 的英文怎麼說

中文拼音 [shuǐfēnwěndìngxìng]
水分不穩定性 英文
hydrolability
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • : 名詞[書面語] (剁物所用的木墩) a block of wood
  • : 形容詞1 (穩定; 穩當) steady; stable; firm 2 (穩重) steady; staid; sedate 3 (穩妥) sure; rel...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : Ⅰ名詞1 (性格) nature; character; disposition 2 (性能; 性質) property; quality 3 (性別) sex ...
  • 水分 : 1. (物體內所含的水) moisture [water] content; dew; humidity 2. (誇大的成分) exaggeration
  • 穩定性 : antiwhip
  • 穩定 : 1 (使穩定) stabilize; steady 2 (穩固安定) stable; steady 3 (物質的性能不易改變的作用) stabi...
  1. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就錦屏二級電站(一期)深埋長隧洞的設計和施工中面臨的一些問題,選取隧洞的一個典型斷面進行滲流、滲控析和開挖及支護的有限元數值模擬,從而就深埋隧洞同的開挖及支護方式對地下滲流場及圍巖的影響和所應採取的支護措施等方面進行了探索、研究。
  2. Through the experimental research, we think : the technological capacity of fiberglass asphalt macadam if weaker than asphalt macadam, however, if use elasticized capacity to solve blending technological problem. adjust the breed of fiber silk, extend its diameter, its paving capacity is still worth exploring, asphalt - rubber macadam structure lager have good deformed - become capacity and crazed - resistance capacity, small gap rate. good water - resistance capacity, good hot - stability and simple construction technology. therefore. pitch rubber spall is a good cover material which is suitable for the second class or lower whose asphalt pavement has split open because of fatigue. and is the good structural measure of preventing half - rigidity grass - roots unit shrink - rift reflecting. pave a thin layer of pitch rubber spall between asphalt - type pavement layer and half - rigidity basic level, although the cost of building is higher than paving togongbu in the middle, the construction technology, crazing - resistance and water - resistance are better than togongbu, not only could reduce greatly the reflex of half - rigidity grass - roots unit material, long then the use lifespan of pavement, but also it is possible to reduce suitably the thickness of asphalt mixture layer, though the cast of building in the early days becomes more, in the long - term opinion, it have fully important technological and economical significance

    通過試驗研究認為:玻璃纖維瀝青碎石的技術如瀝青碎石好,但路用彈能較好,如能解決拌和工藝問題,調整纖維絲的品種,增大其直徑,其路用能仍值得探討,瀝青橡膠碎石結構層具有變形能和抗裂能良好,空隙率小,防能好,熱較好,施工工藝簡單的特點,因此,瀝青橡膠碎石是二級及二級以下公路因疲勞而開裂的瀝青路面的良好罩面材料,也是防止半剛基層收縮裂縫反射的良好結構措施,在瀝青類路面面層和半剛基層之間夾鋪瀝青橡膠碎石薄層,雖然造價比夾鋪土工布高,但其施工工藝,抗裂能和防能均優于土工布,僅可以大大減少半剛基層材料的反射裂縫,延長路面使用壽命,而且可能適當減薄瀝青混合料面層的厚度,雖然初期造價有所增加,從長遠來看,具有十重要的技術和經濟意義。
  3. By hydraulic modeling, this paper describes studies on the stability of a floating bulkhead operating in standing water and flowing water, and it ' s hydrodynamic stability characteristics that distinguish in standing water from in flowing water ; and direct measurements of the forces acting on the model floating body during floating and sinking is taken. as a result, the rotation stress curves are produced and analyzed ; to provide data for optimum operation schedule analyses of the sluice, the relationship of the impact forces acting on the side wall of the gate and the running speed is studied ; the reasons of unstably uplifting of the bulkhead are discussed and the method to solve the problem is also given in this paper

    本文結合常州新閘防洪控制工程工模型試驗,系統析了浮箱門在靜和動中的及其影響因素,指出靜和動同特點;試驗測了浮箱門動運行時的受力情況,給出並析了位過程轉動力的變化過程曲線;根據浮箱門啟閉速度與門體和岸墻之間撞擊力大小的關系,選擇合理的動力設備,為設計和工程實踐提供可靠依據;析浮箱門難以上浮的原因,並給出解決方案。
  4. It has noncombustible, non - toxic, corrosion resistance, bulk density of small, low thermal conductivity, chemical stability strong, and low moisture absorption rate, hydrophobic good, and many other advantages, is recognized superior insulating properties, thermal insulation, sound - absorbing materials with a wide range of purposes

    它具有燃、無毒、耐腐蝕、容重小、導熱系數低、化學強、吸濕率低、憎好等諸多優點,是目前公認能優越的保溫、隔熱、吸音材料,具有十廣泛的用途。
  5. The results of performance testing showed that the additive of nano - powders can evidently enhance the latex coatings " weathering resistance, scratch resistance, water resistance and alkaline resistance, and do not reduce other performances ; polybasic nano - composite powders have more efficient than single nano - powder ; the dispersing method have biggish effect on performances. observing the stability of nano - additive of exterior latex coating showed there was no viscidity rising, no delaminatiom sedimentation in two months. tryout by plant showed that nano - weatherability additive can obviously enhance the weathering resistance of latex coating and water resistance, and no reducing other capabilities

    對其能研究的結果表明,納米粉體材料的引入,可以明顯提高乳膠漆的耐候、耐洗刷和耐耐堿能,對其它能無良影響;納米多元復合粉體比單一粉體的改效果明顯;納米粉體的添加工藝對改乳膠漆能有較大的影響,採用同普通填料一致的添加方式制備的試樣與採用超聲波預散后在配漆階段加入制備的試樣相比,後者在、耐候等方面的能都有所提高。
  6. The thesis built the relation between containing water and the properties of trail dam ' s soil by geomechanical properties of trail dam ' s soil ; analysed the seep rule of water in the trail dam ' s field and the change of soakage line. the thesis applied the limited element to analyze the trail dam of baogang by the engineering item in production. it calculates the dynamic and static response about the dam using the numerical simulation method

    本文通過大量的尾礦土物理力學質試驗資料,建立了含量與尾礦土質之間關系曲線;析了在尾礦壩區的滲流規律和同標高時浸潤線的變化情況,為析尾礦壩的提供依據;結合生產上的工程項目,從包鋼尾礦壩的研究入手,應用有限元法,通過數值模擬析了對尾礦壩的靜力、動力影響。
  7. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種同狀態以及4個平剖線和4個垂直剖線等同情況,從以下幾個方面具體析研究了計算斷面的應力與位移佈規律: ( 1 )在各種同狀態下計算斷面的主應力矢量圖、位移布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比佈曲線; ( 3 )同狀態下相同平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  8. The unstability for steam content in the sealed devices is described, it mainly results from water vapor decomposed by bonding material of conductive adhesive under high temperature

    摘要簡述了集成電路陶瓷封裝內部汽含量的,主要是由粘接材料導電膠在高溫下解釋放出的汽所造成的。
  9. ( 4 ) the dike breach risk of the south bank is relative higher in wandering reaches. ( 5 ) the dike breach risk of the north bank is higher than the south bank in winding reaches. simultaneously, the evaluation results manifest that the evaluation indexes system established from the locomotion of incoming water and sediment load, the regional crustal stability, the evolvement of river regime and the stability of river dikes, can reflect the actual situation of hang river in the lower yellow river more fully

    評價結果同時表明,從沙運動、區域地殼、河勢演變和堤防4個方面建立評價指標體系,能夠更加全面的反映黃河下游懸河的實際情況;運用多層次模糊綜合評判法能夠較好地解決影響因素眾多、作用機制復雜的懸河決溢風險問題;運用gis技術強大的空間析功能,使黃河下游懸河同空間位置的決溢風險得到了量化,可以客觀地反映黃河下遊河道同空間位置決溢風險的差別,對于指導防洪和河道治理的實踐具有重要的現實意義。
  10. Based on analysis of hang river ' s actuality in the lower yellow river and researches related with evaluation of dike breach risk, it is put forward that the influencing factors of hang river dike beach risk in the lower yellow river should involve 4 aspects, the locomotion of incoming water and sediment load, the regional crustal stability, the evolvement of river regime and the stability of river dikes. the evaluation indexes system of hang river dike breach risk and uniform synthetic model are established from the 4 aspects. with the support of gis technology, the evaluation indexes system and the model of multi - hierarchical fuzzy synthetic judgment are applied to estimating the dike beach risk of hang river in the lower yellow river under different flood conditions

    在對黃河下游懸河現狀、決溢風險評價有關研究進行析的基礎上,本文提出黃河下游懸河決溢風險的影響因素應當包含沙運動、區域地殼、河勢演變和堤防4個方面,並從這4個方面建立了黃河下游懸河決溢風險評價的指標體系和統一的綜合評價模型;在gis技術的支持下,運用評價指標體系和多層次模糊綜合評判模型,對同洪情景下黃河下游懸河的決溢風險狀況進行了評價。
  11. This paper, with positive analyses, puts forward a new index system to appraise the operational efficiency standard of stability is the most prominent factor that determines their operational efficiency

    文章結合實證析,提出一種新的商業銀行運行效率平評價指標體系,析表明各商業銀行效率差異大,狀況是目前決我國商業銀行運行效率的最主要因素。
  12. By surveying the sample plot, the relations between the stabil ity of the mountai n slope of soil preparation for planting by using explosion and other factors s uch as precipitation, terrain , were studied. by using the method of quantitative t heory i, the interrelation between the damaged degrees of soil preparation progra ms by using explosion in low mountain area with abundant precipitation and terrain factors was systematically analysed, and the mathematical models relate d were developed. the results show that the precipitation in early days and the m aximum precipitation per day are the primary factors causing the soil prepara tion program damaged. the main terrain factors of the mountain slope that affect the program stability are according to their importance, slope, position and dir ection. the suitable mountain slope for soil preparation by using explosion is th e slope of less than 25

    通過典型標準樣地調查資料,探討了造林爆破整地工程的坡地與降、地形等因子的相互關系,應用數量化理論,對在有充條件下的低山丘陵區的爆破整地工程損失程度與地形因子之間的關系進行了系統析,並建立了相應的數學模型,研究指出,充的前期降和日最大降雨量是引起爆破整地工程損失的激發因素;影響爆破整地工程的主要地形因子是地面坡度,其次為坡位、坡向,實施爆破整地工程的地面坡度以超過25為宜。
  13. This paper, in the light of the special geological environment and actual project situation of the three gorges reservoir area, puts forward a comprehensive analysis and evaluation system suitable for the stability analysis of the bank landslide of the three gorges reservoir area under the premise of thorough consideration of the water influence on the stability of the bank landslide, and obtains the following achievements in several aspects that have the practical application significance and certain scientific research value : ( 1 ) it is discovered that the water activity is the primary factor of the formation of the new landslide and the revival of the ancient landslide. on the one hand, the rising underwater level reduces the actual stress of landslide ; on the other hand, the long time soaking of the underwater reduces the mechanics intensity of the landslide and the slide belt, both of which reduce directly the landslide stability ; ( 2 ) in view of the special condition of the three gorges reservoir area, this paper analyzes systematically the forces acted on the landslide of the three gorges reservoir area and the force varieties acted on the divided landslide when the water level changes between 175 meters and 145 meters. thus it is more scientific and comprehensive for the analysis of the forces acted on the landslide ; ( 3 ) this paper summaries systematically 10 kinds of typical computation projects by organic combinations of different kinds of situations in the dry season ( nature statue ), rainy season ( rainstorm or rains for a long time condition ), with 175m water level in the reservoir, during the earthquake, with the water level of the reservoir adjusted from 175m to 145m and so on, and produces

    本文針對長江三峽庫區特殊的地質環境與工程實際情況,在充考慮對庫岸滑體影響的前提下,提出了一個適用於長江三峽庫岸滑坡體析的綜合析評價體系,並取得了如下幾個方面具有工程實際意義和一科學研究價值的研究成果: ( 1 )研究結果發現,的活動是新滑坡形成或古滑坡復活的主要因素,一方面是由於地下位升高降低了滑坡體的有效應力,另一方面是由於地下的長期浸泡降低滑體及滑帶的力學強度,這兩方面的因素均將直接降低滑坡的; ( 2 )針對三峽庫區的特殊條件,系統析了作用於三峽庫區滑坡體上的力系和庫位在175m與145m間變化時滑體條塊的受力變化,從而使對作用於滑坡體上的力系析更科學、更全面; ( 3 )通過對滑體處于旱季(天然狀態) 、雨季(暴雨或長期降雨狀態) 、 175m庫位、地震以及庫位由175m調節下降至145m等各種同情況的有機組合,本文系統地歸納總結出了10種典型計算工況,並具體給出了相應的作用荷載的計算方法,使在庫區岸坡滑體析評價時對計算工況選擇及其作用荷載的計算更具規范; ( 4 )具體運用c + + builder開發了關于滑坡體綜合析評價系統,使對滑坡體析計算更方便、更準確; ( 5 )將上述滑坡體綜合析評價系統應用於重慶市豐都縣名山滑坡析的具體事例中,析結果表明,本文所提出滑坡體綜合析評價方法對三峽庫區的滑坡析是實用可行的。
  14. The truncated hockenheim track is usually one of the hottest on the calendar, and demands medium - low downforce levels, because of the long, curving back straight ; good mechanical grip, because the slow corners are always slippery ; good stability under heavy braking, particularly in turn 6 where out - braking opportunities present themselves ; and strong engines, as almost three - quarters of the lap is now at full throttle

    被縮短了的霍根海姆賽道是賽程表上最炎熱的一站,由於長距離彎曲的非終點直道而需要中低型的下壓力平,又由於慢速彎道總是很滑還需要良好的機械抓地力以及大力剎車下的,尤其是第6彎道為自己提供了剎車的機會,另外還需要強勁的引擎,因為現在的一圈之中幾乎有四之三是滿油門。
  15. 2. in order to deeply probe into the influence of crosslinked degree on er properties and expediently characterize the structure of the supramolecular complex, six hydrosoluble - cyclodextrin polymer / 3 - hydroxy - 2 - naphthoic acid er particles were synthesized. fluorescence analysis conformed that all the polymers can form 1 : 1 type supramolecular complex with the guest

    為了進一步考察交聯度對電流變效應的影響,並便於超子配合物顆粒的結構表徵,制備了6種同交聯度的-環糊精聚合物,以3 -羥基- 2 -萘甲酸為熒光探針探討了同交聯度超子配合物的組成、及熒光質。
  16. Based on the discuss of the geologic environment of the high slope of spandrel groove jinping i hydroelectric power station. and the engineering geological conditions of rock mass are carefully studied in the paper. the modified csmr are adopted to perform the classification of the slope rock mass, the results of which are combined with the macroscopic stability of the high slope. on the basis of these, the methods of geological diagnosis and the finite element analysis are applied to analyze and compute the overall stability of the high slope

    本文在闡明錦屏一級電站壩區巖體的形成和演化特徵的基礎上,詳細研究了拱肩槽高邊坡巖體的結構特徵及岸坡巖體淺表生改造特徵,建立了岸坡巖體淺表生改造與岸坡演化模式,析研究了巖體的物理力學質,採用修正的csmr法對拱肩槽高邊坡的巖體質量進行級研究,在此上基礎之上,採用地質析判斷和有限元析等方法,對高邊坡整體進行了系統析、計算與評價;應用塊體理論對高邊坡的局部進行了析計算,確局部塊體的規模、出露范圍,從而對拱肩槽高邊坡的局部有了系統全面的認識和了解。
  17. A combined neural network and genetic algorithm with solving stability safety of homogeneous slope was proposed and the finite element method is applied to analysis the progressive failure process of the slope and the maximum equilibrium theory, requests out stability safety of homogeneous slope with the smooth arc radius of difference with the difference below the level coordinate of arc peak, utilizing the neural network algorithm to establish slidng the nonlinear mapping relationship between level coordinate of arc radious and arc peak, being adapted the neural network algorithm to look for along the minimal stability safety of homogeneous slope and corresponding arc radious and arc peak

    提出了求解邊坡安全系數的神經網路與遺傳演算法。該方法採用有限元析和極限平衡理論,求出同的滑弧半徑和同的弧頂平坐標下的邊坡安全系數,利用神經網路演算法建立滑弧半徑和弧頂平坐標與安全系數之間的非線映射關系,採用遺傳演算法搜索邊坡的最小安全系數及相應的滑弧半徑和滑弧中心坐標。
  18. In light of the limitation of fast fourier transform ( fft ) for the method of traditional spectrum analysis to analyze the unsteady signal, wavelet and wavelet analysis are made for the typical unsteady process signal of starting up and shut down with the good characteristic of simultaneous localization in both the time and the frequency domains based on the field test on the vibration of two - row placed units in lijiaxia hydropower station, in which the signal is decomposed into different frequency band, and then the weak signal is caught and the dominant frequency is picked up for the analysis of the vibration source

    摘要基於李家峽電站雙排機組振動的現場試驗研究,並且針對傳統頻譜析方法傅立葉變換( fft )對于非平信號已力從心這一缺陷,利用小波析方法在時域和頻域上同時具有良好的局部化質,通過對開停機這一典型非平過程信號進行小波及小波包析,將其解到同頻帶內,獲取微弱信息和提取優勢頻率,並對其作振源析,得出開停機初始時刻因均出現強烈的振動現象,且低頻段信號能量最大,開停機過程流脈動壓力和尾渦帶擺動是引起子基礎振動的主要原因。
  19. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區良地質觀察、尾礦淋濾固結和化學固結、壩體滲透和庫區特大洪等因素對馬家田尾礦堆積壩體影響的析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失和洪漫頂的可能,以及尾礦淋濾固結和化學固結作用有助於壩體的
  20. The water quality respond relation of input - output measurements are established by systematic theory in this paper. according to the peculiarity of hydrology and the necessity of water quality inverse problem the multi - parameter inverse problem model based on ordinary differential equation is developed. the existence and uniqueness of the solution of the ordinary differential equation about two parameters or multi - parameter are to be proved. the unstability depending on errors between monitoring data and interpolation approximate data are analyzed and demonstrated. cubic spline interpolation function, the least two multiply and positive rule method are conjoined for obtained solution of multi - parameter. the results from this algorithm indicats its efficient to the multi - parameter identification in water quality modeling

    本文應用系統理論,建立了質多參數輸入輸出之間的響應關系;根據河流質變化特點和參數反問題的需求,建立了質常微方程多參數反問題模型.根據常微方程參數反問題的數學理論,作者給出了兩參數和多參數質常微方程反問題的解的存在、唯一的理論證明過程和結論;還針對質現有監測資料的測驗誤差和插值近似計算誤差造成參數反問題的,將三次樣條插值函數、超方程最小二乘法和正則化演算法有機地結合使用,成功地給出了質參數反問題的化演算法.最後給出了應用計算結果
分享友人