水力分級 的英文怎麼說

中文拼音 [shuǐfēn]
水力分級 英文
hydraulic cla ification
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • : Ⅰ名詞1 (等級) level; rank; grade 2 (年級) any of the yearly divisions of a school course; gra...
  • 水力 : waterpower; hydraulic power水力剝離 [采礦工程] hydraulic stripping; strip with water; 水力采礦 hy...
  1. In allusion to test roadway in the zhang - luo second class highway and lin - chang freeway, through hydrologic analysis, hydraulic calculation and with the analysis of highway structure, the blue print of setting drainage system, construction technique and back - check experiment are presented

    針對張羅二公路試驗段和臨常一公路試驗段,進行了析和計算,並結合路面結構析,提出了排系統的布設方案、施工技術方案和試驗檢測方案。
  2. Meanwhile distributive laws of seepage force caused by every grade of water decreasing are still educed

    同時也得出了每引起的滲流佈規律。
  3. The paper is based on innumerable practical heavy - load road data, deliberate heavy - load standard in detail through theoretical arithmetic, and bring heavy - load standard about cement concrete pavement and asphalt concrete pavement separately ; in the meantime, through a large quantity of cement concrete pavement stress calculation, the paper puts forward relation expression between load on concrete board and stress level under board ; meanwhile, the paper puts forward traffic classification about cement concrete pavement and asphalt concrete pavement ; through bearing board testing on each structure sheaf the paper finds the material modulus gets modified ; through comparing position equivalent rebound modulus to theoretical equivalent rebound modulus, the paper points out limitation of nomograph in course of cement concrete pavement design, whereby, puts forward modifier formulas about theoretical equivalent modulus

    本文以大量的重載道路資料為主,從實際出發,結合理論計算,對重載標準進行了詳細的討論,別給出了泥混凝土路面與瀝青混凝土路面的重載標準了;同時,通過大量的泥混凝土板底應計算,推導出了混凝土面板荷載與板底應平的關系式;給出了泥混凝土路面與瀝青混凝土路面的交通;通過對試驗路各結構層進行承載板測試,發現現有材料模量較以前有了明顯的提高;對比現場實測的當量回彈模量與理論當量回彈模量,指出現有泥路面設計中的諾謨圖不能完全符合現有道路材料,從而提出了對理論模量的修正公式。
  4. Based on seismic wave method, borehole acoustic method and indoor rock mechanics test, the dynamic and static parameters of the foundation rock for the toe slab of the concrete face rockfill dam for shuibuya hydropower station are tested, and then the relationship among the rock quality, dynamic parameter and static parameter are established with the parameters obtained from the test, furthermore, the classification and the quality evaluation are made as well

    摘要採用地震波法、鉆孔聲波法以及室內巖石學試驗法,對布埡電站面板壩趾板建基巖體進行了動、靜參數測試,並根據所獲的參數建立了巖體質量、巖體動學和靜學參數三者之間的相關關系,對工程巖體進行了質量和質量評價。
  5. Through this new system, the plant can produce more high quality ashes. the detailed works are involved hi following aspects : i ) the decision of building a new gas - ash - removing system is made, though a broad investigation and a systemic analysis of the original hydro - ash - removing system. ii ) the project of building the improved dry ash handling system is designed

    本文主要對某電廠的干除灰系統進行改造,在保留原有除灰系統的基礎上,再增加一套氣除灰系統和選設施,使得電廠生產出更多的一粉煤灰以及其它等的粉煤灰,達到粉煤灰綜合利用的目的。
  6. ( 2 ) taking the geology analysis as main way and combining the pre - test, predicating the tunnel ' s main geology condition ( rock quality, surrounding rock classification, long - wide joint, fault, ground water, crustal stress ), and predicating the main potential disaster ( collapse, breaking water, rockburst, large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field, finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot, and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel

    通過地質析、類比析、監控量測、數值模擬、神經網路等方法,對鷓鴣山隧道潛在的主要地質災害(塌方、涌、巖爆和大變形)進行了預測預報( 3 )在現場地應測試成果的基礎上,運用數值計算進行應場反演,基本查明了沿隧道軸線剖面的地應佈規律:地應在最大埋深附近達到最大值24mpa ,並預測k2 + 260 k3 + 000段將很可能成為鷓鴣山隧道的高地應段。 ( 4 )塌方往往與斷層破碎帶及千枚巖相聯系。
  7. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了施工導流建築物的等工布置。通過學計算、結構設計、導流方案投資比較、進度析和投資風險析,說明了四湖溝利樞紐工程採用圍堰擋汛后時段洪導流方案的合理性和經濟性,為施工決策提供理論依據。
  8. In water hydrostatic bearing lubrication, however, more accurate research results can be obtained as long as inertia of water flow is considered, because inertia item almost has the same quantitative level as the viscous one

    然而,在靜壓支承潤滑中,的流動慣性項幾乎與粘性項具有相同的數量,對膜的流速及壓佈具有一定的影響,因此應予以考慮,才能得出更加準確的研究結果。
  9. Based on the discuss of the geologic environment of the high slope of spandrel groove jinping i hydroelectric power station. and the engineering geological conditions of rock mass are carefully studied in the paper. the modified csmr are adopted to perform the classification of the slope rock mass, the results of which are combined with the macroscopic stability of the high slope. on the basis of these, the methods of geological diagnosis and the finite element analysis are applied to analyze and compute the overall stability of the high slope

    本文在闡明錦屏一電站壩區巖體的形成和演化特徵的基礎上,詳細研究了拱肩槽高邊坡巖體的結構特徵及岸坡巖體淺表生改造特徵,建立了岸坡巖體淺表生改造與岸坡演化模式,析研究了巖體的物理學性質,採用修正的csmr法對拱肩槽高邊坡的巖體質量進行研究,在此上基礎之上,採用地質析判斷和有限元析等方法,對高邊坡整體穩定性進行了系統析、計算與評價;應用塊體理論對高邊坡的局部穩定性進行了析計算,確定局部不穩定塊體的規模、出露范圍,從而對拱肩槽高邊坡的局部穩定性有了系統全面的認識和了解。
  10. Test showed that under level loads the damage process of multi - ribber slab was according to the order of silice bric ^ concrete frame ^ outer gimbal, released energy classificately, had perfect energy consume and anti - collapse capacity

    試驗表明密肋復合墻板在平荷載作用下破壞過程按「砌塊,框格,外框」的順序進行,能夠釋放能量,表現出了良好的耗能能及抗倒塌能
  11. Performance evaluation of washery hydraulic classifiers

    選煤廠水力分級設備.工藝效果評定方法
  12. Aiming at the problems exiting in grain classification at present, a vertical multistage waterpower device was developed to realize abrasive narrow - grade - classification

    本文主要針對目前磨料微粉存在的困難,自行研製了垂直式多水力分級裝置來實現磨料微粉的窄粒
  13. The loss with time was put forward to value dispersion. the second part is about classifying the super - fine powder. due to the abrasive grain being hard, seriously wearing the equipment and requiring the narrow - grade, a new - type of vertical multistage waterpower system was developed

    針對磨料硬度大對設備磨損嚴重、磨料微粉屬于窄粒產品而設計出一種新型垂直式多水力分級系統,該系統主要特點: 1 、垂直式多
  14. The collapsible loess is often met during the construction of the high - grade highway in the loess area, and the main failure is the uneven subsidence of the roadbed and the culvert, which affects the safe usage of the roadbed and the culvert, etc. directed against this, based on the chankou - lanzhou freeway construction, the paper analyzes the application of the composite ground formed by lime - soil pile under the bridge and designs the project, discusses the rules of the contact pressure, the stress ratio of the pile and the soil, compares the p - s curves of one pile, the composite ground formed by one pile and the composite ground formed by two piles based on the in - situ plate loading test, evaluates the bearing capacity of the composite ground of the project

    黃土地區的高等公路建設中經常遇到濕陷性黃土問題,其病害類型主要是地基土受浸濕后引起路基、橋臺、涵洞等的不均勻沉降,直接影響路基、構造物等的正常使用。針對此問題,本文依託甘肅讒口至蘭州柳溝河高速公路建設工程,對橋基灰土樁復合地基應用的可行性進行了深入析,根據具體工程進行了合理的設計與計算,並配合現場靜載荷試驗及壓盒實測數據,探討了基底應佈規律,樁土應比,變形模量的變化關系,對比析了單樁、單樁復合和雙樁復合的p ? s關系,對橋基灰土樁復合地基承載進行了整體評價。
  15. The research suggests that the failure process of the multi - ribbed composite walls under horizontal seismic loads is : the cracks of the infilled silicate bricks and the cracks of the inner rib beams and rib columns - the cracks of the outer frames ; and that the walls can release energy by stages, showing perfect capacities of energy dissipation and collapse resistance

    研究表明:復合墻板在平地震作用下,其破壞過程按「填充砌塊?肋梁肋柱?外框架」的順序進行,釋放能量;試驗中墻板大部發生剪切滑移破壞;墻板的平均抗剪承載、延性指標、耗能及抗倒塌能明顯優于組合磚墻。
  16. Depending on how the ground surface is denuded, the feature of the current crustal stress field and rock stress environment can be calculated analyzing the result in this paper : by analyzing the recovering feature of the elastic deformation of the rockmass in unload - stage under various pressures, it has been found there is close relationship between the recovering degree of the elastic deformation of the rockmass and the unloading degree of the pressure the direction of the major principal stress in the crustal stress field is not consistent with the direction of the crushing stress regional tectonics borne during the last tectonic movement. the evolving degree of the regional geomorphology evidently affects the current crustal stress field, which changes from the self - weight stress field to the horizontal stress field, with the changing of the eroding degree of the regional geomorphology ranging from valley area to hilly country to flat country. in valley area, where there is two stress belts, the bankslope s tress belt and the self - weight stress belt within the mountain. the direction of the major principal stress is nearly parallel to the ground surface and inclines towards the valley in the bankslope stress belt. it is nearly vertical in the self - weight stress belt

    通過本文的研究成果,根據區域性地貌的演化特徵,我們可以大致地對現今地應場進行判斷:在卸荷條件下,巖體中彈性變形的恢復具有明顯的規律性,這種規律對于研究地應場的演變是有幫助的;地應場中最大主應方向與區域構造形跡在最近的構造運動中所受區域性擠壓應的方向無明顯的對應性;區域性地貌形態的演化程度對現今地應場的特徵具明顯的影響,隨著區域性地貌侵蝕程度由峽谷區、丘陵區、平原區的變化,現今地應場特徵由自重應場、平應場為主含少量自重應場特徵向平應場的規律變化;在峽谷區,山體中具有兩個應帶:自重應帶和卸荷應帶,最大主應方向在卸荷應帶中近平行於坡面並傾向于河谷、在自重應帶中近於直立;根據原始地面遭剝蝕的程度,可以大致地估算最大主應和中間主應的量值和方向;在丘陵區和平原區,最大主應的方向近於平,並與附近區域性侵蝕盆地和河流的展布方向基本平行,根據原始地面遭剝蝕的程度,可以大致估算其最大主應的量值;根據區域性地貌形態的特徵來析工程區的現今地應場特徵,並進而大致了解巖石的應環境,這種析方法得出的結論與許多實際的地應測試成果基本一致,對于大型電工程地下廠房和壓隧洞的設計是有所幫助的。
  17. Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils

    通過多種技術方案比較,最終選擇了技術先進的砂墊層預抬高預壓法,論文工作主要由以下兩部組成: ( 1 )砂墊層預抬高預壓法的適用性研究,其中包括砂墊層厚度、地基沉降與固結度、地基穩定性、降、地震作用下砂土液化的可能性等方面的計算析; ( 2 )施工監測與地基處理效果檢驗,其中包括油罐環梁基礎沉降速率與不均勻沉降程度、各加載階段地基超靜孔壓與深層平位移、油罐底板壓佈及地基土強度增長等方面的實測與數據析。
  18. Suitable for dewatering, medium drainaging, spraying, dry and wet classifying in coal, metallurgical ore dressing, power, light sugar making and salt making industries

    本系列篩適用於煤炭、冶金選礦、電、輕工、製糖、制鹽對物料的脫,脫介、脫泥和干濕式,具有處理能大和篩效率高等優點。
  19. Suitable for dewatering, medium drainaging, spraying, dry and wet classfying in coal, mining, met allurgical ore dressing, highway, railway, power, chemical ldustries, light sugar makyng and salt making industries. with high capacity and efficieney

    系列振動篩適用於煤炭、礦山、冶金選礦、公路、鐵路、電、化工、輕工、製糖、制鹽對物料的脫、脫介、脫泥和干濕式,具有處理能大和篩效率高等優點。
  20. The paper puts forward an ecosystem and the consideration of grading management and planning of water used for ecology, approaches to the water resources issues related to 8 important aspects of water and ecologic security, property management of water resources and business accounting, water resources allocation management, management of water resources policies, management of water resources development and utilization, water used for ecology and carrying capacity of water resources, man - built meadows and water saving, protection, management and water use of semi - desert meadows on the border of oasis and puts forward important strategic countermeasures on sustainable development of oasis situated on the downstream of dry endorheic drainage based on the study of orientation and key points of ecological building of the oasis

    摘要在研究乾旱內陸河流域下游綠洲生態建設方向與重點的基礎上,提出了生態系統和生態用管理和規劃的思想,探討了其所涉及的重要的安全與生態安全、資源產權管理與核算、資源配置管理、資源政策管理、資源開發利用管理、生態用資源承載能、人工草場與節約用、綠洲邊緣半荒漠草場的保護治理與用等8個方面的資源問題,提出了乾旱內陸河流域下游綠洲可持續發展的重大戰略對策。
分享友人