水力及平流 的英文怎麼說

中文拼音 [shuǐpíngliú]
水力及平流 英文
hydrodynamic and advection-diffusion model
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : Ⅰ動詞1 (達到) reach; come up to 2 (夠得上; 比得上) can compare with; be comparable; be up to ...
  • : Ⅰ形容詞1 (沒有高低凹凸 不頃斜) flat; level; even; smooth 2 (高度相同; 不相上下) on the same l...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • 水力 : waterpower; hydraulic power水力剝離 [采礦工程] hydraulic stripping; strip with water; 水力采礦 hy...
  1. The dissertatio n constructs the index system, introduces the coefficients of development, coordination, fairness, and the coefficient of sd, which is composed by the former three and can reflects the sd overall strength of watershed, brings forward the quantative criteria of in order that the research of wrcc is based on the good watershed ecology and environment, the dissertation, according to the ecological appropriate theory, builds the logarithm normal distribution model about the relation between the growth of natural vegetation and the depth of groundwater ; based on this relation model, proposes a quantitative method of ecological water requirement ( ewr ) of natural vegetation in arid area, which utilizes the results of rs technique and the spot testing data of vegetative physiology demand

    針對域特點建立了基於資源的域可持續發展評價指標體系,引入發展系數、協調系數、公系數,以由其構成的衡量資源支撐社會可持續發展綜合與能的可持續發展系數,提出了可持續發展的定量判別方法。為保證在良好生態的前提下進行資源承載能研究,論文根據生態適宜性理論,建立了乾旱區典型天然植物生長與主要環境因子的偏態單峰對數正態分佈模型。基於此關系模型,利用遙感技術成果以植物生理需的現場實驗數據,提出了乾旱區天然植被生態需量計算方法。
  2. Company has possessed 600 employess, over 68manag. ement personnel and 22 technicians since is was founded. inwhich junior college graduatre account for 90 %, average ages of employees is 28 years, area of factory building is 20000sq. meter annusi value of production is 80 milions yuan and have three modemization production line and advanced equipment and perfct monitor and measunng device as puncher, driller, lathe, measurig truck, cutter, shielded welder and pipe bendin machine. main production of company are all kinds of generators, both petrol and dlesel series, water umps, luggage rack of vehicle, bumper, fuel tankall kinds of motorcycle rack, auto majhong machine and whd series of dlecmolishde vehide, wide varieties, a complete range of specification. the products have stable qusity and advanced

    具備廠房面積20000方米,年產值8000多萬元的生產能三條現代化線。擁有各種大型沖壓設備各類油箱鉆床車床儀表車切割機保護焊機彎管機等先進設備和完善的測量裝置。公司主要品種有:各種發電機組汽油機系列柴油機系列泵汽車行李架保險杠各種摩托車架全自動麻將桌whd系列電動滑板車,防墜器等系列產品。
  3. Analyze the yellow river estuary sediment transport and distributing affected factors, utilize the field measured data, based on the hydraulics, river hydrodynamic and statistics fundamental theory, analyze the estuary sediment transport and settling deposition regulation, yellow river estuary gate area sediment deposition mechanism and estuary delta coastline dynamic balance, and some important achievements acquired

    研究報告分析了黃河河口泥沙輸移和分佈的影響因素,利用實測資料,運用學、河學、統計學等基本理論和原理,對河口泥沙輸移其分佈規律、黃河河口口門區域泥沙沉積機理以河口三角洲岸線的動態衡問題進行了分析探討,並取得了部分重要認識和進展。
  4. To choice good excavating scheme, this article engages in hydraulic model tests and numerical simulation on the movable bed

    為了選擇較好的清挖方案,本文對太灣電廠下遊河道進行了動床模型試驗動床數值模擬研究。
  5. In the tidal estuary, the current is complex, and the flow is oscillatory. some experiential formulation has presented to calculate the vertical turbulent mixing coefficient. on the base of analysis of the hydrodynamic in the estuary, the theoretical equation, which describes the distribution of the space and time of vertical turbulent exchange coefficient, has developed, the equation has applied to the practice

    潮汐河口呈往復振蕩運動,本文在分析潮汐河口特性基礎上,考慮了慣性等項的影響,通過理論推導得到潮汐河口垂向紊動交換系數的空間分佈時間分佈的計算公式,以垂向均紊動交換系數的時間分佈的計算公式,並將其應用於潮汐河口的實際計算中。
  6. It will change the hydraulic conditions of the river, such as widening the water surface, decreasing water - flow velocity and purification capacity of water body in reservoir area meanwhile, many problem will be encountered, such as a large quantities of pollution in cities and towns, harmful matters in pesticide and fertilizer in reservoir area, poisonous pollutants in rainfall, accidental discharge of municipal wastewater or industrial sewage, limits of low economic level and urbanization etc.

    域的學條件發生變化,速度減緩,岸邊污染帶加寬,體的環境容量降低;三峽庫區城鎮污處理廠和廠礦的有害廢處理設施不可避免地會發生事故排放;成庫期內庫區城鎮污的治理很難達到質要求,以三峽庫區目前較低的經濟和城鎮化制約,庫區城鎮供面臨的環境問題日漸突出。
  7. So far as the alluvial fiver is concerned, the sediment - carrying capacity of flow and hydraulic geometry of river channel can be regulated by regulating the composition of flow rate, silt concentration and sediment ( water and sediment regulation ) during water and sediment discharge ; with which the relative balance for water and sediment discharge and the river channel evolution can be obtained

    摘要沖積性河的河床在輸輸沙過程中,調節含沙量和泥沙組成(調調沙)可以調節河床幾何形態和挾沙,追求沙輸運和河床演變的相對衡。
  8. The reason to creates this kind of destruction to be very many, the main of them is that the apron partially has not been able fully to display it to eliminate energy affect so causes the ditch bed to wash out, forms flushes the pit, leading to the apron, to guard against flushes the trough and both banks slope protection destruction, for a long time, disappear power design of plunge basin and layout have been focused on disappear power. but not to give the enough value on uses the sea to inundate the section to disappear power and adjust speed to reduced downriver washes out

    閘閘下沖刷破壞的部位絕大多數發生在消池下的海漫和防沖槽處,造成這種破壞的原因很多,其中很大一部分是由於海漫部分未能充分發揮其消能作用而引起渠床沖刷,形成沖坑,導致海漫、防沖槽兩岸護坡的破壞。一直以來,人們把消能的研究重點放在消池的消能設計面布置上,而對海漫段消能調整速功能研究甚少,至於對海漫加糙運動建立數學模型,在國內外還很少見相關的論文資料。
  9. Taking ningxia - inner mongolia reach of yellow river as a study case, a ice regime forecast data warehouse is established for the datamining concerned on the basis of the analysis on the ice regime changing law and its influencing factor of the reach, and then the conceptual mathematic model and artificial neural network model for the parameter calibration of ice regime forecast are built up with gis in combination of the relevant empirical forecast models based on the principles of the hydrological flow muting, thermodynamics and ice hydraulics etc., with which the design and development of the decision support system for the ice regime forecast with the integrated functions of information inquiry, model parameter calibration, temperature forecast and ice regime forecast are preliminarily discussed

    摘要以黃河寧蒙河段為例,在對河段歷史冰情變化規律其影響因素分析的基礎上,建立冰情預報數據庫,進行數據挖掘,並以地理信息系統( gis )為臺,以文學量演算、熱學、冰學等原理為基礎,結合相關經驗預報模型,建立用實測資料進行參數率定的冰情預報概念性數學模型和人工神經網路模型,初步探討了集信息查詢、模型參數率定、氣溫預報、冰情預報等功能為一體的冰情預報決策支持系統的設計與開發。
  10. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截上下游土石圍堰拋墊底研究;二期圍堰防滲工程研究;大江截計算機科學管理;大壩混凝土澆築方案主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  11. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截上下游土石圍堰拋墊底研究;二期圍堰防滲工程研究;大江截計算機科學管理;大壩混凝土澆築方案主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  12. The main features in the study of flood forecasting and control system are as follows : ( 1 ) runoff generating and confluence theory and hydro - dynamic method are adopted to predict the water level of taihu lake and key nodes, the basin wide forecasting and control system with the function of real time correction has been first established in plain river network to meet the complicated flow conditions of taihu lake basin and to enhance the reliability of forecasting results ; ( 2 ) according to the rainfall in foreseen period multiple schemes can be made in the forecasting model and adjusted with time, which overcomes the errors caused by the uncertain rainfall in the foreseen period so as to make the forecasting results approach reality

    本文所研究的預報調度系統有如下特點: ( 1 )本系統採用產匯理論和學方法預報太湖重要節點位,首次在原河網地區建立了具有實時校正功能的全域預報調度系統。以適合太湖域復雜的條件,增強預報的可靠性; ( 2 )預報模型可以根據預見期降雨量進行多方案預報,並隨時間推移,可以實時進行調整,克服由於預見期降雨不確定引起的誤差,使預報結果更接近實際。
  13. The two - dimension plane model and two - dimension vertical model developed have been used in practical projects, in which : in the flood simulation of daqing city, the two - dimension plane unsteady flow model has been built to fit in with the irregular river boundary and realize the rapid forecast of the water flow. in this model, the geographic information sys

    在博斯騰湖大體研究中採用面二維質模型,可完全適應不規則的湖岸邊界,考慮表面風應,對吞吐量、風、泵站位置、位四種因素的多種組合情況下的博斯騰湖風生環、礦化度分佈質進行了模擬計算,獲得了一些有意義的研究成果。
  14. The calculated results are in agreement with the measured ones, indicating that according to the flow rate and composition of the exhaust gas and the mass and the carbon content of the liquid iron, the carbon content of steel bath can be dynamically determined ; with the aid of thermodynamic equilibrium analysis, the dynamic variation of temperature of the steel bath can be forecasted from the dynamic carbon content and the data from the exhaust gas analysis system

    該模型計算結果與檢測結果吻合較好,這表明:通過煙氣量、成分質量和初始碳含量可動態地確定熔池中的碳含量;以動態確定的碳含量為基礎,結合爐氣分析數據,再經熱衡分析,可預測熔池溫度的動態變化。
  15. During this period, the company accepted the internal and external decorating projects for yantai civil aviation building, the glass curtain wall project for the building of bank of china in jinan ( it lies in the most flourishing commercial area. it is a 25 - story building with a height of about 100 meters. the project costs about 10 million rmb ), the external vertical decorating project for jinan real estate building ( the project is a key construction project in jinan city

    2000年至今公司在總體規模、施工能管理上再上新臺階,在此期間,公司憑實先後承接了煙臺民航大廈內外裝工程、濟南市中銀大廈玻璃幕墻工程(該工程位於濟南市最繁華商業區,共25層,高度約100米,專項造價約1000萬元) 、濟南市房產大廈外立面裝飾工程(該工程為濟南市政府重點建設項目,共26層,高度約150米,專項造價約1300萬元,公司為此動用了同濟大學專家設計國內一的施工隊伍) 、人民銀行濟南分行金庫單元幕墻窗工程等。
  16. According to the concept of available water supply, the calculation methods about available water supply of the large scale reservoir are studied and the concrete procedures of the long - series regulation method are proposed. through the calculation of the monthly natural runoff every year, water incomes under present engineering status, and the long - series dynamic water usage regulation of the 32 large scale reservoirs in shandong province, available water supply under assurance rates of 50 %, 75 % and 95 % are obtained. according to the analysis of runoff characteristics of each reservoir ( multi - year mean runoff depth and runoff coefficient ), the relationship between water supply incomes under different assurance rates for current year and the year of 2010, the reservoirs with water supply potence are given

    根據對可供量概念的理解,本文對大型庫可供量的計算方法進行了探討,提出了採用長系列調節計算的具體方法;通過對山東省32座大型庫的歷年逐月天然徑量、現狀工程情況下來量、長系列變動用的調節計算等多個步驟,得出了各庫50 、 75 、 95三種保證率的可供量計算成果,並對每個庫的徑特性(多年均徑系數) 、全省大型庫現狀年2010年的不同保證率的可供量與來量的關系進行了分析與研究;分析提出了具有供庫。
  17. The numerical simulation is an effective method. the main task of this dissertation is to establish a hydrodynamic and pollutant transport model, and to simulate the tide field and concentration field of hakata bay : ( 1 ) dispersing the long - wave equation on interlaced grid by adi method, a two - dimension hydrodynamic model is established to simulate the tidal flow in hakata bay under the effects of m _ 2, s _ 2, o _ 1, k _ 1 tide

    本文的主要工作是建立一個深度均的二維污染物擴散輸移的數值模型,並對一實際海灣的潮濃度場進行數值模擬: ( 1 )用深度均淺波動方程為控制方程,採用迎風adi有限差分方法(交替方向隱式法)在矩形交錯網格上離散潮波方程,建立了一個二維潮數值模型。
  18. Zhou xiaohong, female, master of economics, senior lecturer, senior international logisticstor, accountants, have taken part in the professional backbone of the national training teachers in higher vocational education in the years engaged in the process, the commitment to economic and trade professional teaching, with great concentration on vocational education, accounting, property management and logistics, professional direction of the research, the theory has high academic standards and a strong ability to participate in the practice

    周曉紅,女,經濟學碩士,高級講師,高級國際物師,會計師,曾參加全國中職專業骨幹教師國家級培訓,在從事中高職教育多年的過程中,致於經貿專業教學的同時,潛心於職業教育、會計、物業管理等專業方向的研究,具有較高的理論學術和較強的實踐參與能
  19. The firm is committed to continuous improvement of its facilities and resources and upgrading of the professional competence of its staff. moreover, all the staff in each of the practice groups of the firm meet regularly to discuss the latest developments in legislation and case - law and ways and means of improving services to clients

    我們是一家矢志求進步的律師事務所,不但在設施資源上持續擴展,同時,我們亦不斷提升工作人員的專業。此外,我們各個專業部門均定期舉行會議,就個別專業范圍內在法例案例上的最新發展加以討論,使我們的專業服務質素得以不斷改善。
  20. Let h be the deviation of the true shape of the free surface from the shape it would hold if the water were distributed in a steady state, then 1 sine. snnaxnnnshxthxthxttfsxkbs using darcy s law and ssqnl, the discharge from the aquifer is given by 0001. xssxsxnnnnsnhqsntfkuhxhhfkuhhxhqfkuhxfsslfkttsk it is easy to get the mean subsurface runoff of this grid bqt. bqtql 626 science in china : series d earth sciences for the aquifer, the continuity equation holds. dsntlqsntdt new subsurface runoff parameterization, a synthetical recharge series is applied to some aquifers with dif - ferent parameters. firstly, the parameter is tested : three aquifers with the same following parameters are used : d 1. 5 m, k 0. 0008 m s, l 100 m, f 0. 34, p 0. 5, three different slopes are considered : 0. 002, 0. 02, 0. 05. fig

    在該模型中有三個重要的模型參數的:整個潛均厚度的線性化參數d ,整個潛面的均坡度,以飽和和傳導度k .首先考察一下該模型對于坡度的敏感性:取d 1 . 5 m , k 0 . 0008 m s , l 100 m , f 0 . 34 , p 0 . 5 .取下面三個不同的坡度0 . 002 , 0 . 02 , 0 . 05 .圖2 a給出是實驗給定的入滲強度的時間序列,圖2 b給出的是分別選取這三個坡度時該地下徑機制所產生的不同的地下徑的情況
分享友人