水力填築壩 的英文怎麼說

中文拼音 [shuǐtián]
水力填築壩 英文
hydraulic fill dam
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 動詞1. (墊平或塞滿) fill; stuff 2. (補足; 充滿) replenish; supplement; complement 3. (填寫) fill in; write
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • 水力 : waterpower; hydraulic power水力剝離 [采礦工程] hydraulic stripping; strip with water; 水力采礦 hy...
  1. Hydraulic fill dams are built of sand and silt brought into the dam in a stream of water, usually through a pipe.

    通常是用一根管子利用流把砂和粉沙運到體處
  2. According to their building material, dams are described as concrete, earth fill, rock fill, hydraulic fill and so on.

    按照所用材料,可以把稱為混凝土、堆石等等。
  3. It founds natural heightening theory for warping dams and puts forward specific way of diversion, measures for preventing dam eroded and design for energy dissipation and flood storage of cofferdams and sedimentation and dewatering through exploration and study on deposition in front of natural formed dam and the techniques of building dam through hydraulic filling

    通過對天然聚湫體前的淤積和「技術的探索和研究,創立了淤地體自然加高的理論,並提出了具體的導流方式、體防沖措施及圍堰消能蓄洪、留淤脫設計。
  4. Non linear static & dynamic finite element procedure is adopted for the true emulation of the four typical geologic profiles of the dam, and imitates to compute the each stage deformation and stress distribution from the dam fill to full water run and during the 7 degree seismic intensity, the article also imitates to compute the response to earthquake force, the excess vibration pore water pressure distribution and permanent deformation, predicting the occurrence possibility of the crac ^ plastic zone and earthquake liquefaction

    採用非線性靜、動有限元分析程序對圍的4個典型剖面進行了靜、動模擬模擬,模擬計算了體自至蓄運行和發生7地震各階段體及基的變形以及應分佈,地震應響應和地震引起的超靜振動孔隙分佈以及永久變形。判斷了體和基中出現裂縫、塑性區以及地震液化的可能性。
  5. Thirdly, because the depth of the seepage prevention wall of xia ban di dam project has the value of 85m which is the maximum depth in the dam projects in our country, the stress state of the seepage prevention wall is very complicated, the influence of nine modulus for nine kinds of seepage prevention wall material on the stress and displacement of the seepage prevention wall is studied and the rule of the change of stress and displacement with the change of characteristic parameters for seepage prevention wall under time of engineering completion and water impounding operation period is given in this paper

    第三,鑒于大基礎混凝土防滲墻深度達85m ,厚度僅為1 . 0m ,防滲規模和工程難度為國內之最,墻體應比較復雜,本文研究了大施工竣工期、庫蓄運行期防滲墻的應和變形隨墻體參數的變化而變化的規律,為大安全設計及防滲墻墻體材料的選擇提供了理論依據。
分享友人