水力發電機組 的英文怎麼說

中文拼音 [shuǐdiàn]
水力發電機組 英文
hydro electric generating set
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 名詞(頭發) hair
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : machineengine
  • : Ⅰ名詞1 (由不多的人員組成的單位) group 2 (姓氏) a surname Ⅱ動詞(組織) organize; form Ⅲ量詞(...
  • 水力 : waterpower; hydraulic power水力剝離 [采礦工程] hydraulic stripping; strip with water; 水力采礦 hy...
  1. Based on the demand of power department, a full distributed multifuncitional monitoring device is studied. this instrument not only can measure the data of hydroelectric plant, but also integrate the funcition of control the dynamotor, by cooperate with the program of epigynous system, it can realization the auto generate electricity on the hydroelectric plant and ordinal startup - stop of the dynamotor. 2 furthermore, performance of integrated dft arithmetic enhances the acturacy and reliability of measure. by communication several devices can run online to be controlled dispersedly and managed centrally

    本文分析了國內外站自動控制裝置的研究和展狀況,尤其是國內小型站的自動化現狀,針對現有部門的需求,設計並實現了一種單元式的微自動監控裝置,該裝置不僅實現了對站內各種模擬參數和數字信號的實時監測功能,還對進行了調控,通過與上位處理程序的配合,可以實現站的自動控制、順序啟停;在測量壓和流參數的時候,採用32點離散傅立葉演算法( dft ) ,增加了測量的準確性和可靠性;通過通訊可以實現裝置的聯網運行,做到「分散控制、集中管理」 。
  2. Quality criterion of water and steam for generating unit and steam power equipment

    及蒸汽動設備汽質量
  3. In order to guarantee the normal operation of hydroelectric generator unit, it is necessary to make a thorough test of the performance and characteristics of a governor before it is installed or after it is overhauled. to facilitate the test of the governor, a real - time dynamic simulator based on pcc for water turbine governing system was developed. it has three functions : simulating controlled objects ( pressure water conveying system, water turbine, generator and electric grid ), simulating governor " s electro - hydraulic servo system and working as a real - time measuring system for governor

    調速器是一個很重要的自動化調節設備,它由調節器和液隨動系統成,在調速器安裝或者大修后都要對其性能和特性進行全面測試,為了方便對調速器的測試,特開調速系統實時動態模擬儀,該模擬儀具有三種功能:對調速器調節對象(有壓引系統、網)進行模擬、對調速器液隨動系統與調節對象進行模擬和作為實時測試系統監測調速器的工作是否正常。
  4. In chapter 3, the subgrid eddy - viscosity model for large eddy simulation is applied to calculate the three dimensions unsteady periodic turbulent flow in yantan francis turbine. the pulsating characteristics of some main physical parameters in flow field are found. the calculated axial water thrust of hydraulic turbine agrees with the model - test value

    第三章採用大渦模擬亞格子渦粘模型,對巖灘混流式的流場進行三維非定常湍流分析,得到了流場中各物理量的脈動特性,計算出ms的軸向與模型試驗值大小相當;同時論證了對于下架承重的混流式可採用其推軸承負荷作為站廠房振動的最大垂直激振荷載。
  5. The augment of excitation setting " s control performance is fairly important to improve the static, transient and dynamic stability of power system, and enhance the setting " s utilization rating of the hydraulic turbine generator unit

    提高勵磁裝置的控制性能,對于改善系統靜態、暫態及動態穩定性相當重要,並且可以提高的設備利用率。
  6. Research on quasi - synchronization prediction controller for hydropower generators

    水力發電機組準同期並列預測控制器的研究
  7. In general speaking, this paper has deeply researched the unit increasing capacity for improving hydraulic power utilization of our country, and this paper is a guide for unit increasing capacity working of gezhouba hydroelectric power plant and other hydroelecrtic plants

    總之,本文立足事業的展,為提高我國水力發電機組能利用率,對增容改造進行了深入的研究,對葛洲壩增容改造和其它站的改造工作具有指導作用。
  8. Based on the actual condition of gezhouba hydroeletric power plant, this paper points out the basic way for unit increasing capacity rebuilding of this plant after serious analysis and site review of lots of information of unit increasing capacity of hydroelectric unit at home and abroad. for this rerebuilding plan, we have made a lot of experiment and analyzed the data, the result show that the unit increasing capacity is necessary and feasible in this plant, additional, this paper describes project management, organization struture, management method, and evaluates this project value

    本文對國內外眾多增容改造資料進行了認真研究和實地考察;通過對水力發電機組增容改造技術的研究,結合葛洲壩站實際情況提出了葛洲壩增容改造的基本途徑;針對葛洲壩改造方案,進行了大量的試驗,認真分析了試驗數據,用試驗結果充分證明了葛洲壩增容改造的必要性和可行性;本文還就該工程項目管理的必要性、織結構、管理方法進行了闡述,並對該項目進行了項目評估。
  9. A new method for realization of multi - channel data acquisition on windows flat form is brought forward in allusion to the feature of hyper - low frequency with water pressure pulsation in hydroelectric sets. and various anti - disturbance solutions are adopted in connection with the detection environment. the device proved to be able to has been meet predetermined requirement by its engineering application

    針對水力發電機組壓脈動超低頻特性,開出一種在windows平臺上實時多通道數據採集系統,並結合測試現場環境,提出了抗干擾的各種措施.經實際運用,達到了預定要求
  10. The oversimplified models can not reflect the mutual effect of hydraulic system and power system, and they may cause irrational conclusions when they are used in the studies on middle or long term stability, resynchronization of hydro turbine and generator and large - disturbance surge tank system that relate closely to the mutual effect of hydraulic system and power system or the auto governing

    採用這種的單方面簡化模型不能準確反映系統與系統的耦合作用,對于諸如系統中長期穩定、再同步、調壓井系統大波動穩定等這些與耦合和自動調節作用密切相關的問題的研究,可能導致不合理的結論。
  11. The high control criteria of water vapor quality in secondary circuit of 1000 mw pwr is introduced, and the criteria are compared with those in thermoelectric generating set

    介紹了壓堆核站1000mw二迴路汽質量的高控制標準,並與火汽質量控制標準進行了對比。
  12. More thermal power units will be used as peak load regulation units because many hydropower and nuclear power plants have put into production in recent decade, and three gorges hydropower plant is being constructed

    摘要近十年來,新建了很多廠、核站,三峽廠正在建設,將有更多的火成為調峰
  13. This text takes hydropower station of hunan town of wuxijiang river as an example, introduce hydro - generator unit operation parameter survey principle and method of the operation parameters online monitoring system for hydro - generator unit in detail, and carry on certain analysis by disposition and composition of hardware to system, design and realizing going on intact description of the software especially, make introduction of a certain degree to involve about database and communication technology at the same time

    本文以烏溪江廠湖南鎮站為例,詳細介紹了效率監測系統所監測參數的測定原理和方法,並對系統硬體的配置和構成進行了一定的分析,重點對軟體的設計和實現進行了完整的描述,同時對涉及到的有關數據庫和通信技術都做了一定程度的介紹。
  14. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算科學管理;大壩混凝土澆築方案及主要施工械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽站進口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型的科學研究。
  15. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算科學管理;大壩混凝土澆築方案及主要施工械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽站進口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型的科學研究。
  16. While the scientific technology developing at a tremendous speed, the level of hydro - generator manufacturing is increasing. now the f - class insulation standard for generator is adopted, and cad for hydraulic design has spread, and advanced theory in hydraulic design is applied, and insulation materials are discovered, and precise processing techniques are under research. in the hydroelectric industry it ' s necessary to increase the generating units " installed capacity to take advantage of an old power plant and to raise the utilization ratio of water power energy

    隨著科學技術的飛速展,的生產製造平日益提高, f級絕緣在中的運用;計算cad輔助設計的推廣,先進的設計理論的應用,新的氣絕緣材料的現,精密的加工工藝的研究,為了提高能利用率,使老站煥青春,增容改造已是事業展中一項不容忽視的工作。
  17. Chinese state media report that the first turbine generator on the right bank of china ' s three gorges dam has begun sending electricity to the state power grid

    中國官方媒體報導說,中國三峽大壩右岸站首臺開始向國家網輸送
  18. Ganfa has over 50 years experience of designing and manufacturing and has many items of patent techninque. the synchronous generators and permanent magnet generators which are manufactured with advanced technology and excellent machining equipement, will be able to meet the requirement of different technical condition which matched with various type turbines. ganfa has manufactured the generators of 0. 1 to 20mw in capacity which have been put into operation at present and owns the capability to manufacture the following generators : the capacity per unit up to 180mw, the stator outer diameter of generator up to 9, 000mm, the speed of vertical type generator up to 750r min, and thespeed of horizontal type generator up to 1, 500r min, both the b - grade and f - grade insulation class, the terminal voltage can up to 13. 8kv. ganfa manufactured 34, 500kw water turbine generator sets for the donghewan power station, yongchang, gansu, china which is located in 2. 868. 5m height above sea level, and has successfully solved the difficult problems such as plateau corona - shielding. ganfa is equipped with the generator test station and insulation material laboratory which are advanced test facilites and testing means to make each item electrical performance of products meet designing requirements from purchasing to delivering

    公司具有50年的設計製造經驗,擁有多項專利技術,生產的同步永磁技術工藝先進,製造精良,能滿足與各式配套的不同技術條件要求。目前公司已製造投產的容量范圍為0 . 120mw ,具備生產單擊容量50mw的能座號最大可達9000mm ,立式最高轉速750r min ,臥式最高轉速達1500r min ,絕緣等級有b級和f級,圈式線圈最高壓達13 . 8kv ,公司製造的甘肅永昌東河站34500kw,海拔為2868 . 5m ,成功解決了高原防暈等難題。公司擁有試驗站絕緣材料試驗室等先進的實驗室設施和測試手段,使產品從原材料進產,到成品出產的各項器性能測試均能滿足設計要求。
  19. Abstract : large horizontal axis wind turbine ( hawt ) runs in complicated environment, the load it endured is also very complicated. as the wind turbine become larger and because of the usage of the flexible tower and the glass fiber blade in hwat, the static and the dynamic problems of the hwat and it ' s component become more and more important

    大型平軸風運行在復雜的自然環境中,所受載荷情況非常復雜,而且隨著風的大型化展,柔性塔架的出現、玻璃鋼葉片的應用,使得風及其零部件的靜動態問題更加突出。
  20. Hydroelectric generating set has two type governing equipment. one is electro - hydraulic governor of turbine which can adjust frequency ( active power ) the other is excitation governor of generator which can adjust voltage ( reactive power ). they work together for meeting the requirements of the voltage and frequency that the electrical power system brings forward to

    的調節裝置主要有調速器和勵磁調節器,這兩套調節裝置分別負責能有功(頻率)及無功(壓)的調節,以滿足系統對能的頻率及壓的質量要求。
分享友人