水力發電計劃 的英文怎麼說
中文拼音 [shuǐlìfādiànjìhuà]
水力發電計劃
英文
water-power project- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 力 : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
- 發 : 名詞(頭發) hair
- 電 : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
- 計 : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
- 劃 : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
- 水力 : waterpower; hydraulic power水力剝離 [采礦工程] hydraulic stripping; strip with water; 水力采礦 hy...
- 計劃 : 1 (工作、行動以前預先擬定的內容和步驟) plan; project; programme; device; devisal; design 2 (做...
-
Vsp is both a pivotal tache in logistic distribution optimization and indispensable in electronic commerce. it can increase logistic economic benefit and realize logistic rationalization. the systemic study on the theory and method of vsp is the base on the growth of logistic intensivism, the establishment of modem chain of command, the development of its and ec. now, the problem is not only applied to the field of auto transportation, but also to ship avigation communication electricity industry management computer application etc. the algorithm has been applied into many combinatorial optimization problems such as the trainman ' s shift arrangement in avigation the optimization design of cargo arrangement in ship company
對貨運車輛進行調度優化,可以提高物流經濟效益、實現物流科學化。對貨運車輛調度優化理論與方法進行系統研究是物流集約化發展、建立現代調度指揮系統、發展智能交通運輸系統和開展電子商務的基礎。目前,問題的形式已有很大發展,該問題以不僅僅局限於汽車運輸領域,在水運、航空、通訊、電力、工業管理、計算機應用等領域也有一定的應用,其演算法已用於航空乘務員輪班安排、輪船公司運送貨物經過港口與貨物安排的優化設計、交通車線路安排、生產系統中的計劃與控制等多種組合優化問題。A scheme to be formulated and submitted for approval to the harbour commissioners for the exploitation of white coal hydraulic power, obtained by hydroelectric plant at peak of tide at dublin bar or at head of water at poulaphouca or powerscourt or catchment basins of main streams for the economic production of 500, 000 w. h. p. of electricity
有個建造水力發電廠的計劃:利用都柏林沙洲的滿潮噗啦呋咔272或鮑爾斯考特瀑布273的水位差主要河流的流域來開發白煤水力發電,經濟生產五十萬水馬力的電力。擬好后,將提交港灣委員會,以便獲得批準。Therefore it is the sticking point for solving the problem about separating the duty to find methods by which the customer emission level can be accessed ( the voltage that a customer ' s harmonic current begets at the point of common coupling ) more accurately
由於劃分的依據主要由用戶與電力系統雙方發射的諧波電流在公共聯接點引起的電壓降的比例決定,因此,尋求對用戶諧波發射水平(用戶諧波電流在公共聯接點所引起的電壓降)的準確估計方法,成為了解決責任劃分問題的關鍵。The correlated degree of the density of deformed and failured masses and correlative dynamic force factors in tiger - leaping gorge reach are analyzed by effect measure analysis method which combines qualitative and quantitative analysis, and the key dynamic factors of bank - slope stability are established, which can provided the scientific information for origin division, evaluation, prevention of geological hazards and project planning
本文採用定性與定量相結合的效果測度分析方法,對虎跳峽河段岸坡變形破壞密度與相關動力因子進行關聯度量化分析,從而確定了影響岸坡穩定的關鍵性動力因子,可為水電開發中的岸坡災害成因類型劃分、危險性評價、災害治理和工程規劃設計等提供科學依據。Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project
溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。As the largest hydroelectric plant in the world, its 26 turbines will generate enough electricity to power 28 cities of 1m people each
三峽水壩是當今世界最大的水利發電站(計劃到2008年時,每年發電量會達到8 , 470億千瓦) 。站內的26座渦輪可以給28座人口多達百萬的大城市供應充足的電力。When the paper uses the optimization regulation, it divides the management time into " t " stages according to ten days to make up the decision having many stages of the reservoir ' s optimization regulation, and it takes the reservoir ' s retain quantity of water or retain status of water and confiscated quantity of water a s condition variable, takes the water quantity of drawing off or quantity of electricity as decision variable. when the confiscated quantity of water can be known or be forecasted in every stage during the period of management, that is to say the confiscated water process can adopt the determined process, we can make up determine dynamic plan model with many stages and take the minimal lacking water as objective function
在動態規劃方法中把水庫的整個調度期,按句劃分為t個時段,以水庫的蓄水量s或蓄水位z和入庫水量q作為狀態變量,以水庫放水量q或電站出力n或發電量e作為決策變量,構成一個多階段決策過程,當計劃調度期內各時段的入庫徑流量已知或可以預報,即入庫徑流過程可以採用確定性徑流過程時,分別按缺水量d最小作為目標函數建立多階段確定性動態規劃數學模型。By incorporating the power sources location and load prediction results in the energy utilizing proposal, a balance for the power volume needed by 3 counties in the area in three " five - year plans " period is also made, the result of which indicates that, it can meet the power demand required by the social - economic development in the region in next three " five - year plans " if the water power resources are rationally planned and developed and then a comprehensive energy utilizing proposal by combining solar and winding energy together
並結合區內電源點分佈和負荷預測結果,進行了各縣三個五年計劃期間的電力電量平衡。得到了相應的結論。基於對風能、光能和水能資源開發各自特點的分析,文中進一步對多能互補系統進行了較深入的研究,明確了在阿里地區特定的自然條件下,採用風光互補抽水蓄能開發方式的合理性及可行性。To tap the latent power and control the unit consumption. according to the companys enquiry, different cost control goal should be made in the different period. from economizing a drop of water, a kilowatt - hour to launch conservation, consumption reduction, to deeply tap the latent power to the work extensively among staff, to grasp this department expenses in time, to control and solve the existed problem of the production management strictly
各車間要結合自身生產特點及本車間成本構成的項目逐個排查,繼續挖掘潛力,嚴格控制生產單耗,根據公司要求在不同時期制定出不同的成本控制目標及實施計劃,從節約每一滴水一度電入手,在員工中廣泛開展節能降耗深入挖潛工作,及時掌握本部門費用發生情況,嚴格控制生產管理方面存在的問題。Credits that expire every year or two cause sudden booms and busts, making it hard for turbine - makers to make longer - term plans and thus holding back the industry, say proponents of wind power
賦稅優惠在一兩年內終止導致其突然激增和暴降,從而造成了水輪機製造商很難制定長期計劃並抑制了工業的發展,風力發電支持者分析到。At the threshold of a new era, our life saving training programmes become more diversified. except aforementioned, a number of training programmes with the world s latest techniques, e. g. jet ski rescue, aquatic first aid, accupressure first aid and international referee training, which attracted some enthusiastic participants from other countries as well as local to participate
近年來本會更展開一連串斬新及優秀的創新訓練計劃,其中如水上電單車拯溺、手力急救、水中急救、國際裁判訓練等等,吸引了不少熱心拯溺的外國團體及本港人士參與,使這些世界尖端的拯溺技術訓練得以發展及宣揚。Organised by the office of the government chief information officer ( ogcio ) of the hong kong special administrative region government ( hksarg ) and hong kong cyberport management company limited ( cyberport ), in collaboration with microsoft - the developer of xbox - the programme aims to nurture local talent in digital games development and enhance the standard and competitiveness of the digital entertainment industry in hong kong
香港政府資訊科技總監辦公室、香港數碼港管理有限公司及xbox開發商microsoft共同舉辦xbox游戲育才計劃,讓本地數碼游戲專才一展身手,發揮無窮想像力和創意,展示高超的電腦技巧。有關計劃旨在培育本地數碼游戲方面的專才,以提升香港在數碼媒體工業的技術水平及市場競爭力。With the gradual built of three - gorges hydraulic power station and the execution of the project " electric power transmission from west to east ", the hydroelectric resource is being developed at top speed and the hydroelectric occupy more and more specific weight. the continuous completion and commissioning of large hydraulic power station, as well as the continuous increasing of extra - high voltage and long distance power transmission system, deteriorate the stability control problem of hydro - electricity system
隨著三峽水電站的逐步建成和「西電東送」計劃的實施,我國的水電開發進入了高速發展的時期,大型巨型水電站不斷建成投運,超高壓遠距離輸電系統不斷增長,水電在我國電力系統中所佔比重越來越大。In power market, the short - term optimal dispatch ( stod ) is an important measure for optimizing the schemes of generating electricity and the bidding strategies of generation company, and it is used widely
摘要在電力市場環境下,水電站短期優化調度作為優化發電計劃,指導市場競價的重要環節,在水電站生產實踐中應用廣泛。In formulating new schemes of control, we will require the power companies to install effective emissions reduction facilities to achieve emissions reduction targets, as a precondition for licensing
在訂立新的管制計劃時,我們會要求電力公司必須裝置有效的減排設施,並以達致訂立的排放水平作為發牌的首要條件。分享友人