水力試驗臺 的英文怎麼說

中文拼音 [shuǐshìyàntái]
水力試驗臺 英文
mule
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : 臺名詞(指臺州) short for taizhou (in zhejiang province)
  • 水力 : waterpower; hydraulic power水力剝離 [采礦工程] hydraulic stripping; strip with water; 水力采礦 hy...
  • 試驗 : trial; experiment; test
  1. Because of the technical complexity of the turbine for the three gorges project and on the basis of several important technical problems which have been defined in the international bidding documents for 14 generating units in the left bank power station, the owner of the project has decided another some important technical problems based on appraisal and comparison in the bid appraisal stage after the bidding documents are analyzed and the tender documents are cleared by the tenderers

    由於三峽工程輪機技術上的復雜性和挑戰性,在左岸電站14機組國際招標文件已明確了若干重大技術問題的基礎上,在機組議評標階段,對招標文件進行分析和投標商對投標文件進行澄清說明后,經評議比選,業主又決策了幾個重大技術問題,主要有:輪機設計頭的確定,負傾角葉片輪機的應用,兩套設計,舍棄初期轉輪,蝸殼進行等。
  2. Fuyuan comapny had started to specialized develop, study and produce the technology of polyurethane productions since 1990. at present, it owns about 30 million of fixed assets, we built nearly 10000 square meters workshop of international standard in weihai hi - tech develop zoon, and there were fully equipped water, power, steam and communication apparatus. we had 4 sets high - power pu foaming machines from italy, and a lot of advanced and perfect devices for chemical examination, and now we have the ability of production for 5 million polyurethane flat - free tyres pu tyres and 1000, 000 pieces polyurethane spare parts for automobile

    本公司自1990年開始專業從事聚氨酯產品的技術開發研究與生產。目前擁有固定資產三千余萬元,在國家級的威海高技術產業開發區建設近萬平方米的國際標準廠房,電汽通訊等設施全。裝備有義大利進口的聚氨酯高壓發泡設備4套,並且具備先進完備的化檢測裝置,現已形成年產各種規格的聚氨酯無充氣輪胎五百萬條和聚氨酯汽車內外裝飾件十萬件的生產能
  3. Mean while, the iouver concentrator structure principle is analyzed, the iouver puiverized coal concentrator is studied on the bases of both laboratory and production. lt is discovered from the experiments that the louver horizontai rich / lean combustion pulverized coal burner has advantages of simple in structure, low resistance and adjustment of pc concentration

    同時,重點分析了百葉窗濃縮器的結構原理,並在上和現場對百葉窗煤粉濃縮器進行了大量的研究,結果表明:百葉窗式平濃淡煤粉燃燒器具有結構簡單、阻損失小、分離調節方便等一系列優點。
  4. The improvement system is made up of the pressure sensor, flow sensor, displacement sensor, electro - hydraulic proportional flow control valve, power amplifier, data gathering board and computer. the platform can carry out testing the hydraulic parameters, processing the tested data, saving the processed data and drawing, adjusting the pressure automatically

    改造后的測控系統主要由壓傳感器、流量傳感器、位移傳感器、比例節流閥、功率放大器、數據採集卡和計算機組成。改造后的實具有自動採集實數據、自動處理實數據、自動保存實數據、自動調節液壓系統負載壓等功能,大大提高了實的工作效率、測精度和智能化平。
  5. The performance experiments of emulsified diesel oil are done on a 1135 diesel engine. by a lot of experiment data and charts, the factors that influence the combustion effect are analyzed, including the factors of emulsified fuel self such as emulsifiers, water content, emulsifying way, and the factors of diesel engine such as fuel injection advance angel, injection pressure, load, model of engine, and so on

    在1135柴油機上進行了乳化柴油的,通過大量數據及圖表分析了影響乳化油燃燒效果的因素,包括乳化油自身的因素如乳化劑、含量、乳化方法等,以及發動機的狀況與參數如噴油提前角、噴油壓、工況、機型等。
  6. The level first frequency variety regularity following the pre - stressing cable value is achieved through white noise sweep checking. the conclusion that model is in elastic work stage is achieved

    對結構模型進行了振動,採用白噪聲對結構模型進行掃頻分析,得出結構平第一振型對應頻率隨拉索預應值的變化規律。
  7. Considering the similitude law for shaking table test, we study the test results and obtain some conclusions which are a ) generally, the silty soil in test box liquefies and the liquefied time has relation with the amplitude of acceleration, b ) when the intensity is on and above eight degree, the silty soil deposit will be liquefied dramatically, c ) the relationship of the pore water pressure is relevant to the cycle loading which represents when the cycle loading ranges from little to great, the relationship is represent as a concave curve, or else as a protruding curve and tends to stability. ( 3 ) based on the triaxial compression test and the resonant column test, some studies are made such as a ) the duncan - chang parameters of constitutive model, b ) the dynamic shear modulus ratio and c ) the damping ratio of the site soil deposits. in order to deal with the test data, a computer program is compiled

    ( 2 )利用小型振動進行了k _ 0固結狀態下粉土的振動液化模擬研究,通過分析正弦荷載作用下的資料,證了粉土的孔隙增長模式的合理性;從微分方程推導了基於土體振動模型的相似律,並從模型實體、孔壓時程曲線和相似律等方面做出了分析,得出了如下結論:在小型振動中,模型箱中的粉土都發生了液化,液化的時刻和輸入加速度幅值有關,而對頻率的變化不太敏感;粉土在相當於8 9度地震烈度的加速度幅值作用下可能產生嚴重的液化;孔壓的增長曲線形狀與施加的荷載有關:當施加荷載為由小到大的形式時,曲線形狀為上凹的曲線;當施加荷載為等幅的正弦荷載或荷載幅值由大到小時,曲線形狀為上凸的曲線,且逐漸趨于穩定。
  8. The collapsible loess is often met during the construction of the high - grade highway in the loess area, and the main failure is the uneven subsidence of the roadbed and the culvert, which affects the safe usage of the roadbed and the culvert, etc. directed against this, based on the chankou - lanzhou freeway construction, the paper analyzes the application of the composite ground formed by lime - soil pile under the bridge and designs the project, discusses the rules of the contact pressure, the stress ratio of the pile and the soil, compares the p - s curves of one pile, the composite ground formed by one pile and the composite ground formed by two piles based on the in - situ plate loading test, evaluates the bearing capacity of the composite ground of the project

    黃土地區的高等級公路建設中經常遇到濕陷性黃土問題,其病害類型主要是地基土受浸濕后引起路基、橋、涵洞等的不均勻沉降,直接影響路基、構造物等的正常使用。針對此問題,本文依託甘肅讒口至蘭州柳溝河高速公路建設工程,對橋基灰土樁復合地基應用的可行性進行了深入分析,根據具體工程進行了合理的設計與計算,並配合現場靜載荷及壓盒實測數據,探討了基底應分佈規律,樁土應比,變形模量的變化關系,對比分析了單樁、單樁復合和雙樁復合的p ? s關系,對橋基灰土樁復合地基承載進行了整體評價。
  9. Therefore, a water hydraulic experiment platform which is being trial - produced at the new driving technology center in southwest jiaotong university is introduced in order to lay the base and present an ensure for forth successive research

    是研究壓技術的有手段。本文最後介紹了西南交通大學新型驅動技術中心正在研製的,為后續的研究奠定了基礎。
  10. Influence of soil body behind the abutment stress distribution and stress carry - over length due to different coefficient of friction is analysised, through the experimental results and the space finite element analysis results of the model, actual measurement results tally with the computing results well. ( 4 ) new type semi - integral abutment bridge is from optimization design of conventional abutment bridge - dashuiting middle bridge. not only bridge at both ends

    分析了不同摩阻系數對後土體應分佈和應傳遞長度的影響,並對結果和有限元分析進行了對比,實測結果和計算結果吻合良好; ( 4 )將有縫橋-大町中橋優化設計為新型半整體式無縫橋,橋梁兩端均不設伸縮縫,路面也不設任何接縫。
  11. 1 the company has imported one set world advantaged test calibrator with matrix tensile stress and purchased international advanced level of continuous sinter kiln, oir press, opening blade machine, cut - off tester, cintrifugal tester and mould. they made in china. these equipment have about 41 sets. diamond circular saw blades with cool and hot pressing can be produced two million pieces per year

    1引進國際先進的基體張校準儀一,購入具有國際先進平的國內製造的連續式燒結爐油壓機開刃機切割機離心實機工夾量模具等41套。生產冷熱壓金剛石圓鋸片200萬片。
  12. The mathematic model of predicting the horizontal load subjected to aeroplane undercarriage tyre based on the drop - tests was built by analyzing dynamic loads acting on drop - test platform which is supported by three - poles, and the coefficients in the mathematic model were determined by means of the least - square method according to the results of static tests

    摘要通過分析3點支撐落震平的動態受情況,確定了起落架機輪投放到落震平上后,落震平準方向的各種載荷情況,從而利用測量落震平準載荷的間接測量方法,建立了起落架機輪準載荷測量方法的數學模型, ?採用在落震準方向上進行標定的方法,確定了數學模型中的有關待定系數。
  13. This new technology changes from the traditional method by which the induced and compressor wheel separately are designed and produced to a new one by which the one - piece compressor is designed. on the basis of this new technology and the optimum blade profile, the performance of both the compressor and the turbocharger is largely improved. through the heating power calculation of the compressor, the analysis of the surge and the block of the compressor, the test - bed performance test of the turbocharger, the matching test of turbocharger and diesel engine, the propulsion test of the turbocharger on plateau condition, it is proved that the newly - designed compressor not only has high efficiency, but also improves the flow distribution in the high efficiency area so that the propulsion line can run through the high efficiency area

    主要內容包括:提出一種全新的壓氣機葉輪技術和概念,這種技術將傳統的導風輪和壓氣機分開設計、單獨加工改為整體設計、整體加工的單體葉輪;從增壓器與柴油機配機計算所得出的基本參數出發,通過對壓氣機進行熱計算,確定壓氣機的基本結構參數;再對葉型以及葉輪輪廓與葉輪罩殼的配合間隙進行優化,對新設計的壓氣機進行喘振和堵塞分析;通過增壓器平性能證了新設計的壓氣機的性能平得到了較大的提高,達到了提高增壓器的整體性能平的目的;通過增壓器與柴油機配機、以及增壓器用於高原條件下的牽引證了新設計的壓氣機不但具有高效率,還改善了高效率區的流量分佈,使牽引特性線貫穿高效率區。
  14. A mathematical model, computational method and some experimental results are presented for the hydrodynamic interacting forces and moments between two 3 - d bodies moving in an unbounded water domain. this work is stimulated by a study of the hydrodynamic interactions when a uuv approaching to a parent submarine

    本論文給出了下雙體運動流體動干擾的數學模型、計算方法和結果,目的在於研究下無人平( uuv )接近母潛艇時的干擾及其規律。
  15. The simulation tests were carried out to study the variation of the vertical additional force acted on shaft lining by surrounding soils during dewatering of alluvium by means of multi - function rig in vertical shaft

    摘要利用大型豎井模擬,對沖積層疏排過程中立井井壁受到的豎直附加的變化規律開展了模擬研究。
  16. During past year, 28 times of measurements for two units of b plant of zhelin hydropower station were made, the states of pressure pulsation in the draft cone tube, head cover and spiral case of units were acquired under different water heads, and the influences of that on safety and stability of units operations were also acquired

    摘要在長達一年多的時間里,對柘林電廠b廠兩機組進行了28,全面掌握了機組各頭下尾錐管、頂蓋和渦殼中的壓脈動情況,以及對機組安全穩定運行的影響。
  17. The labyrinth - type emitter can be directly applied to irrigation experiment, the flow rate of 8 emitter prototypes are mensurated under 12 pressure values on the test - bad. moreover, experimental data are analyzed with multivariable linear regression in matlab, formulas of pressure versus flow and regression plots for 8 different emitters are induced from the regression analyses

    製作出的一體化滴頭原型直接連接到性能上進行流量,測定了12個壓點下8種滴頭原型的出量;應用matlab軟體中的多元線性回歸演算法對所得數據進行了回歸分析,得出了8種滴頭的壓流量公式和回歸曲線圖。
  18. Hydraulic machine test - bed is the important device to optimize and exploit hydraulic machines whose tests demand test - beds have high precision and advanced automatization

    機械是開發和優化機械產品的主要設備,它要求測精度高,自動化程度高。
  19. When analyzing the test - bed ' s system design, the paper has a careful hydraulic calculation of the bed ' s circulation ductwork and approves the stability of test cases in theory

    本文在多功能機械的設計研究中,對整個的循環管道系統進行了詳細的計算,從理論上論證了工況的穩定性。
  20. Find out the reason that affects the impulse press. first research the water hammer in the hydraulic impulse testing machine, find out the rules of the instantaneous flow and press

    首先對液壓脈沖的壓沖擊?錘( waterhammer )進行探討,了解管道系統壓沖擊過程中瞬態流量和壓的變化規律。
分享友人