水力連系 的英文怎麼說

中文拼音 [shuǐlián]
水力連系 英文
hydraulic connection
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • 水力 : waterpower; hydraulic power水力剝離 [采礦工程] hydraulic stripping; strip with water; 水力采礦 hy...
  • 連系 : linkage; connection連系動詞 copulative verb; linking verb; 連系法 connection method
  1. Strip - shape underground structures such as the tunnels and tubes for various uses can be treated as a beam on elastic foundation under earthquake condition , although there exists soil - structure interaction , the foundation soil vibration is dominant in other words , analysis of earthquake response of the soil is essential to this end , simplified models , ( i. e equivalent mass system models based on some equivalence criteria ) are proposed , instead of a general 3 - d continuum model in this study , equivalence criteria are proposed and the simplified models are compared the single - mass - string model is proved to be valid and therefore applied to the analysis of earthquake response of the pearl river immersed tunnel

    條裝地下結構如隧道、各種埋設管道等一般可看作彈性地基梁進行靜及動分析在地震條件下,結構與土相互作用,但土的振動成為主要因素為分析土的地震響應需把基土這一三維續體作簡化處理,簡化成為等效多質點模型本文著重探討這種簡化模型的建立方法,推導等效方程,通過幾種簡化體的分析比較,論證單質點串體的合理性,並將其應用到廣州黃沙芳村珠江下隧道工程的地震響應分析,為抗震設計提供依據
  2. The two systems, connected by inextensible link members, are assumed to resist the full external horizontal forces at floor levels.

    這兩種體借無彈性的桿聯結,人們假設用它們抵抗各樓板的全部平外
  3. This part is set up for analyzing systematically the relationship between rli and rural economic development, summarizing the influence law of rli to rural land management benefit, analyzing the innovative mechanism, institutive achievement and difficult position and gauntlet of the present rli in china so as to lay a practical foundation for the innovation design of rli. the third part from chapter 6 to chapter 8 is innovation. in this part, the binding factors, innovative objective and basically guiding ideology of present rli innovation have been analyzed first, then according to the basically theory that relations of production must be suited to productive forces and the basically demands of socialist market economic system, in the light of peasant ' s receptive level and receptive capacity, the innovative model by stages of rural land property rights has been made, finally, the relationship between family farming and farming in scale has been analyzed, the latent profit and its binding factors of present family farming have been expounded, the concrete measures of perfecting family farming institution and pushing on the farming in scale have been put forward

    第六章根據制度創新理論和市場經濟理論,結合我國國情,論述了現階段我國農地制度創新的制約因素、創新的目標及基本指導原則,確定了我國農地制度創新的方式;第七章根據生產關必須適應生產發展平的馬克思主義基本原理和建立社會主義市場經濟體制的要求,結合我國現代化建設分「三步」走的戰略目標及農民的接受程度和能,認為我國未來的農地制中文摘要度不應該拘泥於某一固定模式,而應該建立在貫性的動態優化組合和階段性漸進演化的基本格局之中,並構建了我國農地產權制度的階段性創新模式:第八章通過對農業生產的特點和家庭經營的優勢分析,結合發達國家農業發展的經驗,提出了家庭經營是我國21世紀農地經營的最佳組織形式的結論;論述了農業家庭經營與農地規模經營的關,分析了現階段我國農業家庭經營的潛在收益及其實現的制約因素,進而提出了完善農業家庭經營制度和推進農地適度規模經營的具體措施。
  4. Series 800m4fr is designed to prevent back - siphonage of contaminated water under continuous pressure into the potable water supply

    列800m4fr用於防止在續壓下污染反虹吸進入飲用供應統中。
  5. 2. based on the results of experimental data of the tailrace surge tank of yi xing pumped - storage station in jiangsu province, this research investigates the methods for the head loss coefficients of throttled surge tank with linking pipe by means of the method which incorporates experimental results with theoretical analysis

    結合江蘇宜興抽蓄能電站尾調壓室模型試驗成果,採用理論計算與模型試驗結果相結合的方法,對有接管的阻抗式調壓室局部頭損失數的計算方法進行了討論。
  6. It also has important reference value for the similar construction. by the safety and seismic evaluation of this aqueduct bridge, it has shown that ( 1 ) besides the structure of this aqueduct bridge was basically unharmed without some flake of concrete cover and revealing stirrup, its intensity basically reached the need of primary design. ( 2 ) from the side of carrying capacity, rib arch could satisfy the needs under the action of wind and earthquake, but some individual frame crossbeams and most rib arch tie beams could n ' t satisfy the need

    通過對東滑峪渡槽進行安全性能和抗震性能評估后表明: ( 1 )渡槽除肋拱頂面有保護層剝落、箍筋外露,結構基本完好,其強度基本達到西安理工大學工程碩士專業學位論文原設計的強度要求; ( 2 )從承載方面看,在風荷載、地震作用下,肋拱基本滿足要求,個別排架橫梁不滿足要求,肋拱梁普遍不滿足要求;計入平橫槽向地震作用的工況為設計控制工況。
  7. The theory of minimum entropy production or minimum rate of energy dissipation shows that a river is stable when it is in a relative equilibrium condition. ( 3 ) the river facies formulas of alluvial river have been developed using the theory of minimum rate of energy dissipation together with flow continuity and motion equations, suspended load transport or bed load transport equation. ( 4 ) the causes of the river patterns are explained using the theory of minimum rate of energy dissipation

    ( 3 )基於最小能耗率原理,以流能耗率作為目標函數,以續方程、流運動方程及懸移質挾沙公式或推移質輸沙率公式作為約束條件,通過對目標函數求條件極值,分別推導出以懸移質造床為主的顯式河相關式和以推移質造床為主的顯式河相關式。
  8. This paper sets up a fuzzy optimum math - model of the prestressed degree for prestressing bundle disposition of prestressed concrete continuous beam bridges, which is transformed into a clear math program by - level cut - set. by the solution of the clear math program, a succession of reasonable prestressing moments can be obtained. then it is convenient to dispose the prestressing system by only taking account of geometric factors of all controlling sections. based on this, a theory of automatic disposition of the prestressing bundles is proposed and an engineering example is given to demonstrate it

    建立預應混凝土續梁橋預應度的模糊優化問題,按-平截集解法,將模糊優化問題轉化為確定性的數學規劃問題.求得一較合理的消壓彎矩后,只需按控制截面的構造進行預應設計.在此基礎上提出了配束自動化的基本思想,並以一實例說明其理論應用
  9. Abstract : this paper sets up a fuzzy optimum math - model of the prestressed degree for prestressing bundle disposition of prestressed concrete continuous beam bridges, which is transformed into a clear math program by - level cut - set. by the solution of the clear math program, a succession of reasonable prestressing moments can be obtained. then it is convenient to dispose the prestressing system by only taking account of geometric factors of all controlling sections. based on this, a theory of automatic disposition of the prestressing bundles is proposed and an engineering example is given to demonstrate it

    文摘:建立預應混凝土續梁橋預應度的模糊優化問題,按-平截集解法,將模糊優化問題轉化為確定性的數學規劃問題.求得一較合理的消壓彎矩后,只需按控制截面的構造進行預應設計.在此基礎上提出了配束自動化的基本思想,並以一實例說明其理論應用
  10. Attestation car of gmp : the special wall face with the ground material, in addition to the dust equipments, in addition to the wet equipments, constant temperature equipments, the pure water decontamination system, purify the air condition, cleanness to deliver the machine, cleanness to deliver the window, breeze to pour the room and transport with connect the appropriation tube piece with to pump the valve, stainless steel ware, professional clothing and product, the air compressor, calculator related system and software, the factory motive equipments and attestation of gmp of other products and equipments

    Gmp認證車間特別墻面與地面材料除塵設備除濕設備恆溫設備純凈化統凈化空調潔凈傳遞器潔凈傳遞窗風淋室輸送與接專用管件與泵閥不銹鋼製品專業服裝與製品空氣壓縮機計算機相關統與軟體工廠動設備及gmp認證的其它產品與設備。
  11. Hydraulic couplings. method of test for couplings intended for use in fluid power systems

    接器.第2部分:流體動統用接器試驗方法
  12. Hydraulic couplings. method of test for coupling port threads and their seals intended for use in fluid power systems

    接器.第1部分:流體動統用接器埠螺紋及其密封件的試驗方法
  13. On the other hand, the research of " forests and water " is from the aspects of the eco - hydrological models of forest ecosystem from, the viewpoint of forest ecosystem and combining with the research on forest structure, function, productivity, energy and material circulation, to explore the laws and internal relation of various forest hydrological phenomenon is the basic topic of research

    另一方面在祁源林生態統長期定位研究的基礎上,以祁山青海雲杉為代表運用森林生態學、森林文學、生態經濟學、生態文學等學科理論,通過建立單一因子的文環境因子模型研究森林文效應;從生態統觀點出發,結合森林的結構和功能以及生產統能量及物質循環的研究,揭示各種森林文現象發生和發展的規律及其內在聯
  14. ( 2 ) a series of experiments on time scale distortion are made with real river model, inflow and outflow boundary condition, and continuous simulation. by means of analysis of the experimental data on model water level, water - surface gradient, cross velocity, outflow discharge process and the sediment transportation capacity, the main physical reasons for the above hydraulic parameters deviations caused by time scale distortion are illustrated : response delay of model channel storage capacity and rate of water level with time

    ( 2 )採用真實的河工模型和入出流邊界控制條件以及續模擬的方法進行了有關時間變態率的列試驗,通過模型位、比降、流速、出口流量過程線和斷面挾沙試驗資料的分析,闡明了時間變態引起上述各種參數偏離的主要物理原因:模型的槽蓄響應和洪過程時間變化率的響應滯后。
  15. The nancha suspending - gay bridge of the changjiang road - bridge in jiangshu runyang, with a main span of 1490m, ranks first in china, third in the world. the north rivets, only 250m from the main stream of changjiang, have a tight liaison with the waterpower of it. especially, in this area, the face of rocks undulates a lot and exist fault - fabric. the soil there has apparent difference with the trend of water. the base - hole of north rivets can be named a super - deep one, with a 60m length, 50m widths, and 48m depths. the fence of the base takes advantages of the rectangular underground continuous wall structure and succeeds

    江蘇潤揚長江公路大橋南汊懸索橋,主跨1490m ,居中國第一,世界第三。該橋的北錨碇距長江幹流僅250m ,與長江密切,錨碇區文、地質情況復雜,表層淤泥質土及松軟粘土層較厚,基巖頂面起伏較大,且存在斷裂構造,土層具明顯的流變特性。北錨碇基坑為長60m 、寬50m 、深48m的矩形超深基坑,其基礎圍護在國內首次採用矩形地下續墻結構,並獲得成功。
  16. ( 2 ) some studies are made for the subject of various effects on wave propagation and ground motion of multi - dry, multi - saturated, and alternate dry and saturated soil layers. a comprehensive computer program is compiled, accounting for soil dilatancy, linear and non - linear constitutive relation, rigidity degradation and suiting to any combinations of soil layers, dry and / or saturated with different thicknesses, properties, continuity conditions at interfaces, and inputs at base and top boundaries. from the numerical results obtained for a quite large number of typical cases, some knowledge of general trends of response for, especially, the cases of alternate dry and saturated soil layers are gained both quantitatively and qualitatively

    ( 2 )對不含土層分層排列、飽土層分層排列、不含土層與飽土層分層交錯排列情況下對波傳播和地面運動的影響做了一些研究,考慮到土壤的剪脹性、線性和非線性本構關,剛度退化等因素,編制了可適用上述各種情況和任意多土層(包括含或不含學性質不同、厚度不同、邊界續條件不同等) ,在不同基底輸入或上邊界輸入作用下的通用分析程序,通過對相當數量的典型情況進行的分析計算,得到了一些趨勢性的認識,特別是對飽與不含土層分層交錯情況,取得了一些新認識。
  17. Although the malinan water supply project was scheduled to be completed in a month s time, the people s concerted effort shortened the work time by about half. two water towers were built - one at the river s source to collect uncontaminated spring water flowing from between the rocks, and the other on level ground conveniently accessible to the people. the water towers were connected by pipes and the water was driven by electric pumps

    科塔巴托省馬里南村的供統,預計一個月完成,結果由於人民的全合作,不到二個星期已近尾聲了,他們在河流的源處做一個塔儲蓄從巖壁流出來沒被污染的泉,然後再到平地方便大眾提的地方再做一個塔,利用發電機以及大管來和源處的接,就這樣供統形成了。
  18. Impermeable wall interdicts or weakens waterpower contact of seepage intercomplementarity between groundwater inside dike and river outside dike. especially, mass continuous concrete wall may have made effect on groundwater power field, chemistry field and water resource

    同時由於防滲墻阻斷或減弱了堤內地下與堤外江滲流互補的,特別是建設大規模續防滲墻可能對地下場、化學場以及地下資源等產生影響。
  19. It adoptsthe standard network to fine the solution, so it is a powerful tool and an excellent method for thelnter basin water transfer planning. in this paper, a computer simulation model for water transfer system is set up according to theproject of transferring water from the north to the south in songhua and liao river basins in north east china

    資源統規劃模擬模型,利用節點和線的不同組合來描述不同的資源統和不同工程方案,採用標準的網路求解程序,通用性強,是進行大型跨流域調工程規劃的一種強有工具和值得推廣的方法。
  20. On the basis of theoretical analysis of the relation between the temprrature and volume of medium and results of numerical simulation, the authors detailedly discuss the themodymamic and hydrodynamic characters of there kinds of radiator connection methods which are used by heating measurement and fee system

    以散熱器散熱量與熱媒溫度和流量關的理論分析和工況模擬為基礎,對室內計量採暖統採用的不同散熱器接方式的熱工況進行理論分析計算模擬指出其各自不同的規律性。
分享友人