水力采礦法 的英文怎麼說

中文拼音 [shuǐcǎikuàng]
水力采礦法 英文
hydraulic mining
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 采名詞(采地) feudal estate
  • : 名詞1. (礦床) ore [mineral] deposit 2. (礦石) ore 3. (開采礦物的場所) mine
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  • 水力 : waterpower; hydraulic power水力剝離 [采礦工程] hydraulic stripping; strip with water; 水力采礦 hy...
  • 采礦 : mining; mine (for minerals)采礦船 dredger
  1. Working conditions and productive capacities of both drill carrier and carry - scraper used during mechanical cut and fill stopping activities in xinqiao mining cooperation ltd. are evaluated by field testing and theoretical analysis in this paper

    摘要以新橋業有限責任公司大型機械化上向平分層充填中使用的鑿巖臺車和鏟運機為研究對象,通過現場測定和理論分析相結合,評價了無軌設備的應用狀況和生產能
  2. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方,經電工業部鑒定評為國際先進平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電工業部科技進步二等獎; 「壩料土動應變關系的研究」咨詢項目獲電工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電設計院設計納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福肥基地建設,效益顯著; 「克孜爾庫工程原型觀測數據庫與資料分析」咨詢項目為庫運行與管理提供了有保證。
分享友人