水力電站 的英文怎麼說

中文拼音 [shuǐdiànzhàn]
水力電站 英文
hydro plant
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 水力 : waterpower; hydraulic power水力剝離 [采礦工程] hydraulic stripping; strip with water; 水力采礦 hy...
  • 電站 : power station電站船 generating ship
  1. Because of the technical complexity of the turbine for the three gorges project and on the basis of several important technical problems which have been defined in the international bidding documents for 14 generating units in the left bank power station, the owner of the project has decided another some important technical problems based on appraisal and comparison in the bid appraisal stage after the bidding documents are analyzed and the tender documents are cleared by the tenderers

    由於三峽工程輪機技術上的復雜性和挑戰性,在左岸14臺機組國際招標文件已明確了若干重大技術問題的基礎上,在機組議評標階段,對招標文件進行分析和投標商對投標文件進行澄清說明后,經評議比選,業主又決策了幾個重大技術問題,主要有:輪機設計頭的確定,負傾角葉片輪機的應用,兩套設計,舍棄初期轉輪,蝸殼進行壓試驗等。
  2. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承建大的工程項目:華北油田廠原油發工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。
  3. Main operating companies : one, quality brands imported power plant auxiliary equipment : including valves, pumps and transducer and thermocouple and actuators, measuring gauges, pressure switches, solenoid valve and ion exchange resins and other rights and the importation of water treatment packages instruments : online various instruments, laboratory instruments 3, chemical water treatment, electro - deionization ( edi ) 4. complete sets of equipment, installation, commissioning and maintenance

    公司主要經營: 1 、代理進口優質品牌輔機設備:含閥門、泵類、變送器、熱偶、執行器、計量儀表、壓開關、磁閥、離子交換樹脂等; 2 、代理進口處理成套儀器儀表:各類在線儀表、實驗室儀表; 3 、化處理、除鹽( edi ) 4 、設備成套安裝、調試、檢修。
  4. Based on the demand of power department, a full distributed multifuncitional monitoring device is studied. this instrument not only can measure the data of hydroelectric plant, but also integrate the funcition of control the dynamotor, by cooperate with the program of epigynous system, it can realization the auto generate electricity on the hydroelectric plant and ordinal startup - stop of the dynamotor. 2 furthermore, performance of integrated dft arithmetic enhances the acturacy and reliability of measure. by communication several devices can run online to be controlled dispersedly and managed centrally

    本文分析了國內外自動控制裝置的研究和發展狀況,尤其是國內小型的自動化現狀,針對現有部門的需求,設計並實現了一種單元式的微機自動監控裝置,該裝置不僅實現了對內各種模擬參數和數字信號的實時監測功能,還對輪發機組進行了調控,通過與上位機處理程序的配合,可以實現的自動發控制、機組順序啟停;在測量發機組機端壓和流參數的時候,採用32點離散傅立葉演算法( dft ) ,增加了測量的準確性和可靠性;通過通訊可以實現裝置的聯網運行,做到「分散控制、集中管理」 。
  5. Thirdly, the correlative coefficient is computed between the pressure fluctuation signal of draft tube and the displacement signal of upper guide bearing, the thrust bearing and the head cover, with this the conclusions on the shafts response due to pressure surge in

    並與模型尾管壓脈動試驗結果進行對比?結合流動模擬試驗以及動特性計算結果,全面分析?評定機組的實際運行狀況,劃定運行區域,為合理調度
  6. After many years of civil construction and facility renovation, shmp become a modern large enterprise with complete management organization, strong technical ability, sufficient manufacturing facility, advanced procedure, perfect testing method to finish design and manufacturing of heavy equipment for power industries, metallurgy and rolling industries, forging and pressing industries, minery and cement industries, water conservancy, and also high quality heavy casting and forging

    我公司經過多年的基本建設和技術改造,現已成為一個組織管理機構健全,技術量雄厚,加工設備齊全,工藝手段先進,測試方法完善,可以獨立設計、製造大型、冶煉、軋鋼、鍛壓、礦山、泥建材設備和大型優質鑄鍛件的現代化大型企業。
  7. In this paper, 3d nonlinear finite element model is used to analyze the stability of side slope of baise hydraulic power plant ' s tail channel, and the result to be given for consulting

    本文主要應用三維非線性有限元對百色渠高邊坡進行靜、動穩定性分析,並對結果進行分析,給出供工程設計的參考意見。
  8. Hydrological calculation norms for small hydro power

    小型文計算規范
  9. Design specification for steel penstocks of hydroelectric stations

    鋼管設計規范
  10. Specifications for design of steel penstocks of hydroelectric stations

    鋼管設計規范
  11. Design of underground buried penstock of longtan hydropower station

    龍灘地下埋藏式壓鋼管設計
  12. Selection of preheated temperature for tgp penstock welding

    三峽工程左岸鋼管焊接預熱溫度的選擇
  13. Thedevelopment development hydraulic jack, the bearing heater, thebearing get up pulling out, the hydraulic pressure spanner, thehydraulic pressure pulls a horse, the hydraulic pressure small crane, nut broken cutting, the oil filter machine and the pipe bendingmachine and so on the advanced practical mechanical and electricalservice product has the world advanced level, the product and thetechnology widely applies to domain the and so on electric power, petrification, chemical industry, metallurgy, mine, spinning andweaving, papermaking machinery service department and the machinemanufacture unit, and in the daya bay nuclear power station, beijingsteel corporation, wuhan steel corporation, the baoshan steelcorporation, the daqing oil field, the victory oil field, the golmudoil field, the three gorges power plant, yangzi petrifies, qi and lupetrifies and so on in the national large and middle scale enterprisesand the project the comprehensive promoted use

    研製開發的液壓千斤頂,軸承加熱器、軸承起拔器、液壓扳手、液壓拉馬、液壓小吊車、螺母破切器,濾油機和彎管機等先進實用的機維修產品有世界先進平,產品和技術廣泛應用於、石化、化工、冶金、礦山、紡織、造紙等領域的機械維修部門和機械製造單位,並在大亞灣核、首鋼、武鋼、寶鋼、大慶油田、勝利油田、格爾木油田、三峽、揚子石化、齊魯石化等國家大中型企業和工程中全面推廣使用。
  14. A research on canceling telescopic joint of the penstock about the high head development near power house

    取消高鋼管近廠房段伸縮節研究
  15. The tailrace surge chamber shared by two units, common in hydropower stations with diversion systems, has problems of water level fluctuation and hydraulic disturbance

    摘要雙機共尾調壓室是系統中一種常見的布置形式,存在尾調壓室位波動和干擾問題。
  16. 2. based on the results of experimental data of the tailrace surge tank of yi xing pumped - storage station in jiangsu province, this research investigates the methods for the head loss coefficients of throttled surge tank with linking pipe by means of the method which incorporates experimental results with theoretical analysis

    結合江蘇宜興抽蓄能調壓室模型試驗成果,採用理論計算與模型試驗結果相結合的方法,對有連接管的阻抗式調壓室局部頭損失系數的計算方法進行了討論。
  17. In accordance with the testing results and the analysis concerned, it is considered that the seismic wave method, borehole acoustic method and indoor rock mechanics test are feasible to evaluate the engineering quality of the foundation rock for the toe slab of the dam comprehensively, and the results can lay a reliable foundation for the accepting the foundation rock for the toe slab of the dam

    根據檢測結果與分析,認為採用地震波法、鉆孔聲波法以及室內巖石學試驗綜合評價大壩趾板建基巖體工程質量是可行的,其成果可為大壩趾板建基巖體驗收提供依據。
  18. Based on seismic wave method, borehole acoustic method and indoor rock mechanics test, the dynamic and static parameters of the foundation rock for the toe slab of the concrete face rockfill dam for shuibuya hydropower station are tested, and then the relationship among the rock quality, dynamic parameter and static parameter are established with the parameters obtained from the test, furthermore, the classification and the quality evaluation are made as well

    摘要採用地震波法、鉆孔聲波法以及室內巖石學試驗法,對布埡面板壩趾板建基巖體進行了動、靜參數測試,並根據所獲的參數建立了巖體質量、巖體動學和靜學參數三者之間的相關關系,對工程巖體進行了質量分級和質量評價。
  19. The penstock for jinhe hydropower station is less in china, as it has a obliquity of 50 on the bending and inclined straight section in space ; for which the manufacture and installation are smoothly completed under the construction condition in the tunnel and the environment of alpine region with available construction method in combination of limited construction method for the key technical problems of the manufacture and installation of the penstock, which provides a reference for the constructions under the similar circumstance

    摘要金河鋼管的空間轉彎和斜直段的50傾角在國內是比較少見的,針對鋼管製造、安裝的技術難點,在高寒和復雜的洞內施工環境中,結合有限的施工手段,採取有效可行的施工方法,順利完成了製造、安裝任務,對類似環境下的施工提供了一定的借鑒。
  20. Using the perturbation transfer matrix method as well as the tested data in the laboratory, the 1st and 2nd order perturbed identification of dynamic parameters of the rotor of a boiler pump is made

    摘要利用攝動傳遞矩陣法,結合實驗室的試驗,對某鍋爐給泵轉子的動學參數進行了一階和二階攝動識別。
分享友人