水口大小 的英文怎麼說

中文拼音 [shuǐkǒuxiǎo]
水口大小 英文
pin-point gate
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (人或動物進飲食的器官; 嘴) mouth 2 (容器通外面的地方) mouth; rim 3 (出入通過的地方) ...
  • : Ⅰ形容詞1 (體積、面積、數量、強度等不大) small; little; petty; minor 2 (年紀小的; 年幼的) youn...
  1. Thus, for an average - sized vent, advection could provide more than 30 kilograms of potential food per day

    這樣對於一個普通的噴來說,平對流每天能提供30公斤以上的潛在食物。
  2. In order to reduce the re - deposit volume of the dredged channel, the method must be based on decreasing the oncoming sediment, changing the mouth site, builting the sediment control dam and raising the reservoir level

    為了最限度地減疏浚挖槽的回淤量,必須依靠控制上游來沙量、調整入門位置、加設防淤堤及提高庫位等手段,而不能通過調整挖泥槽寬度、位置及數量等措施來達到目的。
  3. No meat was given to the dog even when it refused vegetarian food and it just fasted. three shock treatments later, her puppy developed a very good appetite and now eats almost anything. in addition to its main staple of sweet corn and cheese, it also loves bean sprouts, vegetable stalks, peanuts, pine nuts, guavas, tomatoes, pears, custard apples and other sweet fruits

    11 .原本肉食的動物改為素食時,如果遇到任何障礙,你可以循序漸進,逐日減少肉食量,增加其它素食品不過,福爾摩沙永和市的陳姐則對她的愛犬採取震撼教育法,當它拒食時亦不提供任何肉品,讓它自然斷食,如此反覆三次后,她的狗便胃開,幾乎什麼都吃,除了乳酪玉米等主食外,舉凡芽菜蔬菜梗花生松子等堅果芭樂蕃茄梨釋迦等各種甜味果無一不愛。
  4. This is a distributing trend. all that account for that the project have quite obviously advantage. form the experiment of different density stream, the stream come into being is quit possibly. can the sandiness move to the dam and expel from the reservoir suppend on some complications

    在壩前局部模型試驗中,方案二的出庫含沙量平面上呈底孔、電廠和取的分佈趨勢,而初設方案運用則相反,說明方案二具有較明顯的優越性。
  5. Standard features include : 3 ” waste outlet valve, left side service, 2 ” fresh water outlet valve, sight glasses, hose bracket, strap tie - down brackets, bumper hitch, rear mud - flaps, wand holster, unique baffle design, keyed locking cabinets

    標準系統包括: 3 "排污閥,左邊服務系統, 2 "閥、視鏡、軟管支架、捷牽制下拉支架、防撞緩沖器、後方泥瓣、棒皮套、獨特設計擋板、可鎖壁櫃。
  6. Then, a thunderous sound came from the rear of the house. the kitchen on the back slope had collapsed under the sudden onslaught of a torrential flow of muddy water, and had fallen on the last row of concrete houses on the slope. rocks of all sizes, washed down by the muddy water, smashed through the windows into the rooms and then rushed through the doors into the living room and out into the courtyard at lower levels

    謝師兄在打坐中依稀聽到爸爸走進客廳的聲音,突然一聲山崩地裂的巨響從屋后傳來,後山腰的廚房被突如其來的土石流沖擊倒塌,壓到斜坡上最後一排的鋼筋房子,土石流沖破兩三間房間的窗戶玻璃,石塊挾雜在洪中,從窗沖進房間,又從房門竄流出來,直奔地勢較低的客廳和庭院,家頓時變成土石流的出
  7. For the receiving and delivering operation and inventory management in no. 8 and no. 9 stockyards directly affect products " circulating capacity in no. 3 operating district and the loading / unloading efficiency of ships which eventually postpone the delivering time to customers according the tenth five year ' s planning of wisco, wisco will produce 9 million tons annually and outselling products will highly exceed the designed 1. 2 million tons circulating capacity of no. 3 operating districts

    8 、 9碼頭庫場是進出鋼材集散和換裝過程中短期堆存的場地,庫場的,尤其是管理平的高低,影響著船舶裝卸效率的高低和在港停時的長短,直接影響到三區碼頭的通貨能力,影響到武鋼產品的外發能力。根據武鋼「十五」規劃,武鋼將實現每年鋼產量900萬噸,外發產品將遠遠超過工業港三區碼頭的設計通貨能力120萬噸。
  8. Generally, tidal bore is wave alignment moving upstream estuary, and its surface will break when the wave alignment is strong, which leads to water roll tracing the source. the velocity, which is between small - disturbed wave velocities before tidal bore happens and the one after tidal bore happens, increases with the ratio of tidal bore height to the water depth in wave front

    涌潮一般是向河上游推進的波列,強度時,表面破碎,進而發展成溯源推進的滾,其傳播速度隨涌潮高度與波前深比值增加,介於涌潮前後擾動波波速之間。
  9. The duration from the occurrence of penetrating chinks to dyke breaches depends on the composition and cross - sectional size of the dyke body, and the river water level

    從發生貫穿性漏洞到潰的時間與堤身組成物、堤身斷面、江位高低有關。
  10. Water invasion bursten out during the railway - tunnel construction is usually the mainly problem in constructing or operating, also which brings surface water to exhaustion and pollutes environment or effects ecology, etc. the geleshan tunnel which crosses through guan - yin gorge anticline which trend is near south north, is located between tuanjie village and jingkou village of the shapingba zone, chongqing city, which is belongs to the inducting segment of yu - huai railway. the guan - yin gorge anticline appears to ridge and slot interlacing in land form, and is composed of clastic rock and carbonate rock from jurassic xintiangou group to triassic

    歌樂山隧道位於渝懷線引入段重慶市沙坪壩區團結村至井村之間,隧道穿越近南北向的觀音峽背斜,地貌上表現為脊、槽相間,觀音峽背斜由侏羅系新田溝組至三疊系下統碎屑巖和碳酸鹽巖組成,歌樂山頂部分出露可溶巖地層,地表巖溶發育,有量泉和暗河出,並修建有多個中庫、量池塘和井。
  11. On the basis of the study of the theory and appraise method on land use in the small towns from home and abroad, this paper at first conducts a deep study on the development and role of the small towns, indicating that its development has sawn an uneven development phrase and becomes a carrier of the enterprises, a pool of surplus laborers, a hub of material exchanges between the rural and urban areas, a base of spiritual civilization, an important way to achieve urbanization. second, it conducts a study on the situation and features and the problems the land use, indicating that the efficiency of the land use is low, which has a direct influence on the development of agriculture and the role of the small towns. and the study of the demand of the land indicates the shortage of land is serious, and the small town must rationally use the land and increases its intensive role and the economical efficiency to meet the demand

    在分析國內外已有關于城鎮土地利用的理論與評價方法的基礎上,首先對城鎮在我國的發展、地位和作用進行了深入的分析,判明我國城鎮發展經歷了一個曲折向上的發展階段,已成為鄉鎮企業的載體,農村剩餘勞動力的蓄池,城鄉物資交流的樞紐,農村精神文明的基地,是我國城市化的重要途徑;其次,對城鎮土地資源利用現狀和特徵進行了探討,並對發展城鎮建設導致的土地利用問題進行了剖析,表明目前我國多數城鎮土地效益和規模效益低下,佔用耕地過多,直接影響農業的發展,影響城鎮的地位和作用;通過城鎮土地供需分析研究表明,我國土地短缺十分嚴峻,城鎮土地需求缺城鎮必須合理利用現有土地,增強集約功能和土地經濟效益,從而緩解需求壓力;最後,論文通過運用特爾菲法,描述統計分析法、多元統計分析(主成分分析)法和系統分析法中的層次分析法( ahp )等一系列方法,結合定性和定量兩方面,從土地質量、土地資源數量與結構、土地經濟效益、環境效益、社會效益等五個方面進行分析,篩選、建立了土地資源利用評價指標體系,在因子評價的基礎上,建立了土地利用綜合評價模型,並給出了評價過程和方法。
  12. She was doing her midnight meditation when she suddenly awoke and opened her door to find that the rising water was only a few inches from her home. she quickly awakened her family and evacuated them to a higher place, and within minutes, water had submerged their home, which had never been flooded in the thirty odd years they had lived there

    在風災平靜后,各地哀嘆聲中,我耳聞靠近最低洼地區的一位師姊如何福至心靈,忽然半夜在打坐時警醒,開門一看已近家門,趕緊叫醒一家往高處道路逃生,短短數分鐘后,洪淹沒了住了三十多年從沒淹過的家。
  13. Xh rubber slowly - closing cut - off vavle is a new water supply and drainage vavle with full rubber structure, duck - mouthed appearance and functions or positive flow - in and reserve cut - off. according to thrust analysis and calculation as well as different operation mechanism and different rubber products by special processing. all will be open at weak hydraulic pressure is higher, the vavle gate will open more greatly and the water flow is greater. at reserve operation, the vavle gate closes naturally and seals tightly cut - off vavle ; the back pressure is higher, the vavle gate closes more tightly and the seal effect is better. it is used widely in various drainage exit to prevent from pouring backwards and flowing backwards in city planning, water conservancy and sewage disposal etc. it is the ideal productto replace flap vavle

    Xf型橡膠緩閉逆止閥是一種全橡膠結構外形呈「鴨嘴狀」 ,具有「正向流入反向逆止」功能的新型給排閥門產品。它根據受力分析和受力計算,針對不同的工況,採用不同的設計機理,選用不同的橡膠配方,並按特殊工藝製作而成。正向工作時,由進流入,微壓,便能打開閥門,壓越,閥門開啟越流量越
  14. I took some pictures of a few rocks at the door, the twisted and damaged asphalt - paved road, and the makeshift house, in front of which were rocks of different sizes. i also recorded the traces of the 90 - degree - swerve made by the mudslide as evidence of the miracle

    我拍下屋前少數堵住門的石頭,以及變形的柏油路面再走到更前方的鐵皮屋前,照下曾沖擊鐵皮屋所留下不等的石頭又照下90度洪走過的痕跡見證了歷史的一幕。
  15. Based on the analysis of satellite images of various periods, landform data and river channel transverse section evolution in the lower yellow river, the characteristics of the river channel boundary condition changes at different location are clarified as middle flood channel flood transport width and area are evidently decreased especially for the main channel with comparison to 1950s, beach area that is unimpeded before become blocked because of road, irrigation channel constructed on it, and consequently intensify high edge of beach and lowering dyke and river

    在現場查勘的基礎上,通過對丹江庫和浪底庫攔沙初期下遊河道演變、排洪能力變化特點的對比,分析了黃河下游防洪面臨的新形勢:浪底庫攔沙初期,下遊河道發生沖刷,但艾山以下窄河段沖淤變化不,近年來形成的淤積萎縮的狀況難以很快改觀,游蕩性河段調整劇烈,工程出險機遇增,河道位流量關系中流量以下部分同流量位明顯降低,中流量以上部分位降低幅度可能會明顯偏,防洪形勢仍不容樂觀。
  16. The government of shanghai city planned to build a deep - water port among qiqu isles in the donghai sea. for the purpose of the transportation between mainland and the port, a span - sea bridge, luyang bridge, was planned to be built

    上海市政府規劃在東海中部崎嶇列島的洋山建設深港,為解決陸上與港之間的交通問題,擬在蘆潮港與洋山之間修建跨海橋。
  17. Meanwhile, many countries see attracting foreign direct investment ( fdi ) as an important element in their strategy for economic development because fdi is widely regarded as an amalgamation of capital, technology, market, and management. since these flows of fdi are playing and will likely continue to play a key role in the integration of china into the world economy, this dissertation focuses on the factors affecting the level of fdi across provinces in china from 1994 to 2003 and the study differentiate from other similar studies on china ' s fdi by looking at possible changes in importance of determining factors through time

    通過對外國直接投資理論的演變和新發展的回顧,總結出對我國外國直接投資的可能因素,如市場需求和市場、聚集程度、勞動成本、勞動力質量、科研平、開放度等六因素及其可行變量,如gdp 、人均gdp 、零售額、人均零售額、人數、每平方公里公路長度、每平方公里鐵路長度、國內投資、每個工人的國內投資、累積的國內投資、累積的fdi 、 cfdi / cinv 、工程師、科學家和技工占職工數的百分比、平均工資、專利數量、學數量、進額/ gdp 。
  18. Issuing to village the policy subsidying the small sum in interest an agricultural loan a valid path for always is academic circles with poor population in generally accepted the village of solution in government in all levels, promoting village developping, from current see theoretically, the small sum of the certain scope inside subsidying the interest lends money of issue, will promote the agriculture and the development of the village, increase poor and homely income in village level, but the small sum subsidying the loan of interest is can increase the income level of the peasant household, lend money a problem for increasing accepting together native average in circumstance increasing accepting sum comparing, result how, this is this text wanting resolving, this text pass to the inquisition of the loan peasant household, in collecting large quantity one hand material of foundation, is all each county downtown to is investigated the data proceeded to gather, statisticsing the contrast circumstance that loan an income change the circumstance and increase with native average the sum, the loan sum that will be investigated the peasant household, invest the realm proceeded the contrast, and borrow funds with the region not door of that year income increment the sum proceeded the comparison. use the different from lengthways the method research that compare investment in fixed amount realm, different loan sum, not the environmental loan in area in county door increases to accept sum and its correlations. come to explain the public finance subsidy the small sum in interest an agricultural loan an influence for to peasant household income, analyzing the small sum in policy an agricultural loan an influence for to increasing accepting the factor, discussing the policy stick the small sum in interest an agricultural loan a shortage for of policy blemish and managing top, combining domestic and international policy of now of combination an agricultural loan a policy for of policy with managing way, to small sum in policy in our country an agricultural loan style establishment and manage the mode put forward a little bit personal views, the writer thinks that develop the policy an agricultural loan a root for of a farming using is a financial environment of village to push forward financial system in village reform to reform with political setup, improve village finance serve, create a competition, norm, subsidying the interest the loan the solution limitedly not farmer of letter funds need problem

    向農村發放政策性貼息額支農貸款一直是學術界和各級政府比較公認的解決農村貧困人,促進農村發展的有效途徑,從現有的理論上看,一定范圍內的額貼息貸款的發放,會促進農業和農村的發展,提高農村貧困家庭的收入平,而額貼息貸款是不是能夠提高農戶的收入平,貸款戶的增收情況同當地的平均增收額比較,效果怎樣,這是本文所要解決的問題,本文通過對貸款農戶的調查,在收集量第一手材料的基礎上,將各縣市區所有被調查數據進行了匯總,統計出貸款戶收入變化情況以及與當地的平均增長額的對比情況,將被調查農戶的貸款額,投資領域進行了對比,並與當地非借款戶的當年收入增加額進行了比較。用定量比較和縱向比較的方法研究不同投資領域、不同貸款額、不縣域環境的貸款戶增收額及其相互關系。來說明財政貼息額支農貸款對農戶收入的影響,分析政策性額支農貸款對增收的影響因素,論述政策性貼息額支農貸款的政策性缺陷及管理上的不足,並結合當今國內外政策性支農貸款的政策和管理方式,對我國政策性額支農貸款的政策制定及管理模式提出了個人的一些見解,筆者認為發揮政策支農貸款的支農作用的根本是推進農村金融體制改革和政治體制改革,改善農村金融服務,創造一個競爭、規范的農村金融環境,有限的貼息貸款解決不了農民的信貸資金需求問題。
  19. The sequence and activity characteristics of shuikou reservoir induced earthquake are analyzed with several methods, such as probabilistic evaluation, comprehensive effect parameter e evaluation, two - step comprehensive fuzzy evaluation, the maximum magnitude of historical earthquakes evaluation, etc. the results show that the shuikou m ( subscript l ) 4. 1 earthquake on april 21, 1996 is a main - earthquake, and from now on, the possibility occuring m ( subscript l ) > 3 induced earthquake in shuikou reservoir area is low

    摘要應用概率法、綜合影響參數預測法、兩級模糊評判法、古登堡里克特公式外推預測法等對庫誘發地震序列以及活動特徵進行了研究,認為: 1996年4月21日發生的m (下標l ) 4 . 1地震為庫誘發地震主震,今後庫區發生於3級以上誘發地震的可能性較
  20. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河浪底利樞紐復雜的文、地質條件以及龐的工程規模.該樞紐設計有3條排沙洞,擔負著泄洪、排沙、調節徑流和保證進不被泥沙淤堵的任務.根據排沙洞的庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后張預應力隧洞.通過量的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最的無粘結預應力隧洞襯砌工程,在國內尚屬首例
分享友人