水堰高度 的英文怎麼說

中文拼音 [shuǐyàngāo]
水堰高度 英文
water weir height
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞(較低的擋水建築物) weir
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 高度 : altitudeheightelevation
  1. Established 20 years ago, the chu - lung resort was wulai s first dedicated hot springs hotel. the men s pool faces an uninhabited hillside and the yenti reservoir, while the women s pool is located on the side of the ravine. it features hot, medium and cold baths, with water massage sections and baths scented with tea, lemon and other fragrances

    半露天的男性養生池,面對一片無人的山林,還有庫澎湃雄壯的瀑布流而半露天的仕女池則在南勢溪洪荒峽邊,擁有冷中溫三種不同溫的溫泉池,還有具按摩放鬆作用的流區氣泡區,和茶浴檸檬浴等不同味道湯池。
  2. So the labyrinth weir is particularly suited for use where the discharge structure need to enlarge the ability of outflow but the width is restricted the labyrinth weir could be divided into straight - labyrinth weir and curve - labyrinth weir in this paper

    因此,迷宮特別適用於泄受限,但又需提泄流能力的泄建築物中。本文將迷宮分為直線型迷宮和曲線型迷宮
  3. Shankou spillway project has many specific characteristics, for example, the gate frusta and weir body have equivalent thickness, the weir body is low and have corridor, the foundation of the weir body is " high - low foot " " and the side frusta is also used as retain wall. in view of the characteristics, to better analyze the stress distribution on weir body, gate frusta, the joints between gate chamber and weir body, under the condition that the gate chamber is applied with asymmetrical loads and complicated constraints, three dimensional finite element method is applied in this paper

    本文針對山口溢洪道閘墩與體底板厚相當,體為低且設有廊道、體建基面「低腳」及邊墩兼作擋土墻等具體特點,在閘室設計中采山口利樞紐工程溢洪道閘室三維有限元整體應力計算分析用三維有限元整體應力計算方法分析閘室的受力狀態,分析閘室在荷載不對稱。
  4. The labyrinth weir is a special kind of practical and effective weir patterns. it can evidently increase the discharge for a given outflow width

    迷宮作為一種實用效的特殊型,它在不改變泄的情況下,可大幅過流能力。
  5. ( 2 ) validate whether the crest elevation can meet the require of energy dissipation and erosion prevention during the beginning period of flood discharge. ( 3 ) calculate the altitude of downriver cofferdam, and make it meet the require of energy dissipation and erosion prevention. ( 4 ) calculate some average velocity of flow through some sections, including contracted section in stilling basins behind upriver cofferdam, if the hydraulic jump happen in lower reaches of the river. the program will calculate the average velocity of flow of contracted section and the length of the apron

    主要設計內容包括:計算上游圍后消力池的尺寸;驗證泄洪初期壩面程是否能夠滿足消能防沖需要;計算下游圍程,使其滿足泄洪期圍和壩體過流的消能防沖和工程進的需要;計算部分斷面平均流速,包括:上游圍后消力池中收縮斷面的斷面平均流速;壩首和壩末的斷面平均流速;當下遊河道發生躍時,計算下遊河道的收縮斷面平均流速及需要鋪設護坦的長
  6. In this paper a date from some real projects are used to analyse the facors that will affect the energy dissipation and erosion prevention. such as flood discharge across the cofferdam, crest elevation, downriver cofferdam, roughness coefficient and the gradient of the surface of dam, and so on. in this paper, the program based on hydraulics is checkout by the tankeng waterpower project in zhejiang. the results prove that this program can be used to design any project where there is no obvious side shrinking phenomena

    本文結合工程實際對影響圍和壩體消能防沖的各種因素,包括過流量、壩面程、下游圍程、壩面糙率、壩面坡等進行了分析,並藉助力學知識和計算機語言編寫了圍和壩體的優化計算程序,並利用浙江灘坑電站工程對所提出優化計算程序進行了驗證,證明了該程序在沒有明顯的側收縮的影響下,計算結果與實際情況較為吻合。
  7. In consideration of the hydrological and meteorological conditions, the construction characteristics, and the temperature control standard of rcc for cofferdams on upper and lower reaches and for right dam sections, an introduction was given to special temperature control and management measures adopted in rcc construction of longitudinal cofferdams at jinghong hydropower station during the high temperature period

    摘要針對景洪電站文氣象條件、施工特點,以及上下游圍和右沖壩段碾壓混凝土溫控制標準,介紹景洪電站縱向圍溫季節碾壓混凝土施工過程中採取的具體溫控措施,以及業主在溫控組織管理工作中採取的措施。