水堵 的英文怎麼說
中文拼音 [shuǐdǔ]
水堵
英文
water blocking-
Since the reform and open in china, however, there are many hidden - troubles of transportation though the urbanization level has been improved greatly. for instance, the city has been constructing more high - ways, but the increase of vehicles is much more than mileage, so that the traffic is aswarm and crowded, the living quality of citizens is depressed and the urban economy is blocked
而我國自建國后,尤其是改革開放以來,盡管城市化水平有了很大提高,但同時也暴露出了很多交通方面的問題和隱患,例如,城市內高等級道路增長很快,但由於車輛的增長遠遠高於道路里程的增長,從而造成交通擁擠、堵塞,城市居民生活質量下降,甚至會阻礙城市經濟的進一步發展。In my bathroom i had only scalding hot water in the bathtub but no plug.
盥洗室里只有洗澡盆能放滾燙的熱水,盆里卻沒有堵水的塞子。After the surplus size of the thick liquid trough is retrieved or put, can put the branch water properly, heat, wash the pipeline which sends the thick liquid material with pump circulation again, so as not to stop up
漿槽的剩餘漿液回收或放掉后,可適當放入清水、用蒸汽加溫,再用泵循環清洗輸送漿料的管路,以免堵塞。The method of close water test has been used for a long time, so richer experience has been achieved. however, it not only takes pains and time, but also consumes raw materials during the close water test because of miscellaneous working procedures such as bricklaying in the two ends of pipe, water - repellent layer plastering, maintaining and water offletting, brick - block backouting after the test, especially in the region short of water and some drainage pipe with prop - pipe construction. in order to satisfy the fast development of municipal construction, new detection methods should be developed
閉水試驗方法因其應用時間較長,目前已積累了較豐富的經驗,但在閉水試驗時,管道兩端砌築磚堵、抹防水層、養護、灌水浸泡,以及試驗后的放水、磚堵拆除等繁雜工序,不僅費工、費時,而且消耗原材料,尤其是在缺水的地區以及頂管施工的無壓管道,這些矛盾更加突出;因此,為滿足迅速發展的市政建設需要,有必要探索新的檢測方法,閉氣試驗就是其中一種,但是閉氣試驗目前還不完善,有待于進一步深入研究。The practice of grout solidifying and caulking of the underground hydrology drill after water outburst
井下水文鉆孔涌水后注漿固孔與堵水實踐Please don ' t drop the used wipe in the cloacae, to avoid the block
請勿將使用過的濕巾丟入下水道,以防止堵塞。Clogged pipes caused drain water to back up into the room.
水管堵塞,排出去的水倒灌入室。Application of back grouting water sealing technology for wall of coal bunker
煤倉倉壁注漿堵水技術應用Leakage in a dam foundation may sometimes be overcome by digging deep into it so as to build a cutoff wall into the foundation.
壩基漏水的現象,有時可以用深挖地基建造堵截水墻的辦法來克服。Debris have stemmed the current.
破瓦片之類的東西堵住了水流。Then a lake formed, probably after an eruption blocked some rivers or streams.
可能是一次火山噴發之後,一些河流或溪水被堵塞了,形成了湖泊。( 3 ) the blockage of filtering bed and the thickening of the argitan can cause the change of hydrodynamic properties in the filtering bed, which leads to the decrease of water quantity
( 3 )濾床堵塞和泥膜增厚可能產生濾床中水動力特徵的改變,會產生非飽和流導致出水量的衰減。High water pressure jet technique used to remove well - blockup
高壓水射流解堵技術的應用The local people dammed up the river to make a lake for their water supply
當地人把河水堵起來造湖,以便使用。Stops up as the natural physics leaks the material, with theunidirectional pressure inclusion reagent and the high dehydrationblocking agent reasonable allocated proportion, suits the permeablestratum, the crack stratum large and middle scale cracks guardsagainst leaks stops up leaks, especially is suitable in petroleummining
作為天然物理堵漏材料,與單向壓力封閉劑和高失水堵漏劑合理配比,適合滲透性地層、裂縫性地層大中型裂縫的防漏堵漏,尤其適用石油開采中。Shanghai hance building waterproof ltd., mainly building waterproof and damp proof, stopping up leak and seeping proof engineering, building preservation heat, building antisepsis and steel structure building waterproof and seeping proof engineering, which is the company of professional waterproof and stopping up leak with product development, sell and construction
上海漢策建築防水堵漏有限公司主要以建築防水防潮、堵漏防滲工程、建築保溫、建築防腐及鋼結構建築防水、防滲為主體,集產品開發、營銷、施工於一體的新型專業防水堵漏公司。Primitive man could face serious problems, in order to adapt to a new life, they have to use the toilet, but the things they had never encountered before. therefore, blocking the water after they no good solution, but now you have to help them solve problems, they fear that the water is now not clear brush, with the mouse
原始人遇到了嚴重的問題,為了適應新的生活,他們必須使用馬桶,可是這個東西他們從來沒有遇到過,所以下水堵了之後他們就沒有什麼很好的解決辦法了,不過現在有你給他們排憂解難,他們就不怕了,現在疏通下水不用刷子了,用鼠標。Introduction : primitive man could face serious problems, in order to adapt to a new life, they have to use the toilet, but the things they had never encountered before. therefore, blocking the water after they no good solution, but now you have to help them solve problems, they fear that the water is now not clear brush, with the mouse
原始人遇到了嚴重的問題,為了適應新的生活,他們必須使用馬桶,可是這個東西他們從來沒有遇到過,所以下水堵了之後他們就沒有什麼很好的解決辦法了,不過現在有你給他們排憂解難,他們就不怕了,現在疏通下水不用刷子了,用鼠標。The products are the raw material of polyurethane elastomer, coating and adhesives, which react with isocyanate to give a chemical grouting material that has been widely used for seepage - proofing and blocking up the loophole of tunnel, dam, underground projects and mine - pits, as well as foundation reinforcement
本類產品為聚氨酯彈性體、塗料、粘結劑的原料,與異氰酸酯反應制得的化學灌漿材料,廣泛用於隧道、水壩、地下工程、礦坑層面的防水堵漏及建築物的地基加固。Inorganic waterproof and leakage - preventing materials
無機防水堵漏材料分享友人