水壩排水閘 的英文怎麼說
中文拼音 [shuǐbàbèishuǐzhá]
水壩排水閘
英文
dam outlet-
So as the enter point of the stream, the income of the reservoir, the time of the flood peak lasted, the quantity of sandiness income and the strobe of the darn. we must do some work to forecast and watch the different density stream. by experiments, we made out that it is impo rtant for us to reduce the water lever in work of the river belongs lots of sandiness
從異重流試驗看,在正常運用下,水庫產生泥沙異重流的機率較大,能否運動到壩前排出庫外,還要看異重流潛入點位置、入庫流量、洪峰歷時、入庫含沙量、水庫閘門運用等因素,需要做好異重流預報監測工作。Article 37 no unit and individual may damage, occupy or destroy flood control works such as dams, embankments, sluices, bank revetments, pumping stations and drainage systems, hydrological and communications facilities and standby apparatuses and materials for flood control
第三十七條任何單位和個人不得破壞、侵佔、毀損水庫大壩、堤防、水閘、護岸、抽水站、排水渠系等防洪工程和水文、通信設施以及防汛備用的器材、物料等。The article introduces the waterproofing and drainage measures and materials for the dam, the foundation of the permanent lock and some buildings of the three gorges project
介紹了三峽工程中大壩、永久船閘基礎及一些建築物的防排水措施和所用材料。When building permanent dams and sluice gate structure on navigable or bamboo and log rafting streams, the construction unit must simultaneously build facilities for ship or log passage or, after being approved by departments authorized by the state council, take other remedial measures and also make adequate arrangements for navigation and bamboo and log rafting during the construction period and the initial filling period, and bear the expenses thereby incurred
在通航或者竹木流放的河流上修建永久性攔河閘壩,建設單位必須同時修建過船、過木設施,或者經國務院授權的部門批準採取其他補救措施,並妥善安排施工和蓄水期間的航運和竹木流放,所需費用由建設單位負擔。分享友人