水平布線 的英文怎麼說

中文拼音 [shuǐpíngxiàn]
水平布線 英文
horizontal cabling
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ形容詞1 (沒有高低凹凸 不頃斜) flat; level; even; smooth 2 (高度相同; 不相上下) on the same l...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 水平 : 1. (跟水面平行的) horizontal;level2. (達到的高度) standard; level
  1. There are gatherings in back armhole at the joke level

    后夾圈在擔干骨聚集到一起了
  2. Finally, given the application system of water wirelss publishment query system based on sms technology and describe the development process in detail

    最後,給出了基於短消息技術的利無查詢系統臺的開發實例,詳細講述了其開發過程。
  3. Webbing sling, round sling, lifting sling, nylon rope, rope ladder, cargo net lifting sling belt group have a long history for more than 46 years of specializing in different types of slings, mainly products including polyester webbing sling, polyester round sling, polyester cargo lashing, super sing, flat sling, flat webbing sling, flat web sling, polester web sling, tree strap, webbing strap, doublebraid, recovery strap, recovery tow strap, lashing systems, polyester sling, polyester belt sling, hollow braid, synthetic webbing, endless sling, nylon sling, synthetic web sling, synthetic sling, webbing sling, round sling, cargo lashing, ratchet tie down, ratchet lashing, ratchet strap, ratchet tie down strap, nylon webbing, nylon strap, tubular round ropes, braided rope, diamond braid rope, starter rope, safety net, safety belt, cargo net, safety rope, climbing rope, rope ladder, building net, nylon net, polyester webbing sling, polyester round sling, tie down, cargo restraint, webbing strap, duplex eye - eye webbing sling, eye - eye webbing sling endless webbing sling, widely and heavy duty webbing sling, multi - sling, ratchet lashing, tow strap, web belt sling, flat webbing sling, nylon rope ladder, industrial safety nets, nylon cargo net, dock net, synthetic webbing sling, lifting clamp, braided rope, 3 strand rope, 12 strand rope, 8 strand rope, cargo net, shipmast net, tube net, solid braided rope, braided rope net, sports net, pe net, safety net, scaffold net, synthetic slings, wide lift sling, round webbing sling, flat webbing sling with eyes, flat webbing endless sling, wire rope sling, multi - set sling, pipe lifting sling, pipeline sling, lowering belt, heavy duty anti cutting sleeves, fiberglass rope, fiberglass wick, braided fiberglass rope, fiberglass rope lamp, fiberglass oil lamp wick, fiberglass strap, solid braided fiberglass rope - round, fiberglass tapes, ceramic fiber rope, fiberglass braided rope, pipe handling sling, lowering in belts, stone handling sling, flat lifting sling pipe lifting belt synthetic fiber round sling synthetic lifting sling, synthetic fiber sling, nylon webbing strap, pipe sling, bandsling, pipe sling with reinforced eyes, lifting sling with reinforced eyes, pipeline pipe industrial farm lifting sling, endless sling, eye eye sling, oil field sling, truck strap, winch strap, cargo tie down, track ratchet strap, tow strap winch flat rope tow line, heavy duty webbing towing lifting sling, cargo sling, pp cargo sling, polyester cargo sling, flat pack sling, ceramic fiber rope twisted rope braided round rope braided square rope

    2圓形尼吊裝繩系列:無接頭尼吊裝繩兩頭扣尼吊裝繩多叉尼吊裝繩船用錨繩纜繩引紙繩變壓器吊裝繩各種規格編織吊繩,尼繩,啟動拉繩,啟動繩,引擎拉繩,引擎繩,起動拉繩,起動繩,動力繩,安全清洗繩,安全繩,保險繩,耐火救生繩,維綸繩,丙綸繩,滌綸繩,錦綸繩,尼吊繩,尼吊裝繩,錨繩,靠岸繩,旗繩,晾衣繩,復合吊繩,掛衣繩,宿營繩,保護繩,防火繩,尼網,休閑吊網,跳繩,蠶絲繩,全棉繩,塑膠繩,繩,拔河繩,攀巖繩,遊艇繩,綿綸絞制繩,織制繩,登山繩,拔河繩,立桿繩,繩,工藝繩,吊繩,船用纜繩,絞制纜繩,綿綸絕緣繩,三股繩,八股繩,軍用繩,路牽引繩,吊棕繩,割刀繩,引紙繩,包裝袋繩,禮品盒繩,酒盒繩,食品盒繩,手提袋用繩,禮品盒用繩,工藝品用繩,服裝用繩,聚乙烯繩,聚丙烯繩,混紡繩,纖維綸繩,復絲繩,撕裂膜繩,編織繩,加鉛繩,功能繩,軟梯繩,尼軟梯,軟梯,尼繩梯,尼梯繩,安全網,棉繩,彈力橡筋繩,嵌邊繩,封蠟繩等,啟動繩啟動拉繩引擎繩引擎拉繩起動拉繩,雙編織繩,金剛打編織繩,股編織繩,股編織繩,多股編織繩。
  4. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個和4個垂直剖等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分圖( ux 、 uy )以及應力等值色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同與垂直剖的應力_ 1 、 _ 2和_ ( xy )對比分佈曲; ( 3 )不同狀態下相同或垂直剖的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  5. During the second phase of the east lake lakeshore scenery construction project, an approach was taken to establish a public domain including a cha - gang lose - water " observation platform, bathing beach and parking lots. the design and analysis of all these elements have been addressed in the following article as well as other components such as roadway alignment, installation, water bank stabilization, planting, street lighting, sculptures and accessible paths for disables. the proposed landscape will ensure a systematic visual system with enhanced cultural, artistic, and unique characteristics, and properly arranged facilities along the shoreline

    本文通過東湖環湖景觀建設綜合整治二期工程中的茶港親臺、沙灘浴場及停車場的道路和景觀設計,對東湖環湖的路面、鋪裝、駁岸、綠化、亮化、燈飾、小品、殘疾人通道等多個方面進行了分析,以期建立一個統一有序的視覺體系,增強東湖環湖旅遊的文化性、藝術性和獨特性,合理安排置配套設施,使之成為一條步移景異,集秀、翠、幽、雅為一體的湖畔風光游覽路。
  6. Wage standards of the employees should be decided through collective negotiations by the ffes according to the guideline promulgated by the local people ' s government of the labour administrative department

    企業職工的工資由企業根據當地人民政府或勞動行政部門發的工資指導,通過集體談判確定。
  7. The experiment procedure and analysis result about exteriorly extended end - plate connection with high strength bolt are introduced primarily ; each sample ' s dimension is given. the adding load equipment, measuring apparatus placed, measuring point established is detailed. adding load measure load and m - curve is produced ; the single span gabled frames horizontal displacement formula is deduced when the horizontal concentrated force is applied to it

    重點介紹了外伸端板高強螺栓連接的實驗過程及實驗分析結果,介紹了各組試件的形狀尺寸、加載裝置、測量儀器安放、測點的置等;給出加載方式及測出的m -曲;計算出試驗節點的初始剛度;推導集中力作用下單跨門式剛架考慮節點半剛性的側移計算公式。
  8. Insulators and fittings for overhead lines arming for horizontal arrangement of wires on strutted wooden poles

    架空路用絕緣子和器材.金具.木電桿上的水平布線用帶支撐的橫擔
  9. With all kinds of modernized production lines, produce annually 8 million meters of worsted woolen cloth, 1 million sets of clothing, 300 ton of rabbit wool yarn, 0. 12 billion meters of cotton print and dye cloth, 20 million pieces of knitted underwear, 20 million meters of jean. the company is listed as one of the top 520 national key enterprises and one of the hundred key enterprises of shandong province. the company s economic efficiency is at the leading level in the same profession

    擁有各類現代化生產,年產毛精紡呢絨800萬米,服裝100萬套,兔毛紗300噸,棉印染1 . 2億米,針織服裝2000萬件、牛仔2000萬米。公司被列為中國520家重點企業,山東省百家重點企業集團,公司經濟效益多年來保持國內同行業領先
  10. Blank detail specification : connectors for optical fibres and cables ; environmental categorie ii cecc 86002 : 1992

    數字通信用對絞或星絞多芯對稱電纜第21部分:電纜空白詳細規范
  11. Multicore and symmetrical pair quad cables for digital communications part 2 : horizontal floor wiring - sectional specification

    數字通信用對絞或星絞多芯對稱電纜第2部分:電纜分規范
  12. Blank detail specification : connectors for optical fibres and cables - environmental category iii ; german version en 186003 : 1993

    數字通信用對絞或星絞多芯對稱電纜第2部分:電纜分規范
  13. Multicore and symmetrical pair quad cables for digital communications part 3 : horizontal floor wiring - blank detail specification

    數字通信用對絞或星絞多芯對稱電纜第3部分:電纜空白詳細規范
  14. The comparison results show that the left edge algorithm can only resolve the channel routing problem without vertical constraints, while the greedy channel router can accomplish the problem with vertical and horizontal constraints

    比較結果證明,左邊演算法只能解決不存在垂直約束的通道問題,而貪婪演算法在充分考慮垂直和約束的條件下能較好地完成
  15. Horizontal wiring system

    水平布線系統
  16. The main work of this paper was as fellows : ( 1 ) generalized the development of pre - stressed steel structure in our nation and abroad, and pointed out the main problem in practice ; ( 2 ) presented the mechanism of pre - stressed steel structure and revealed its applicable range ; ( 3 ) established the optimization design model for pre - stressed steel structure, which accounts for constraints on stresses and displacements of structure ; ( 4 ) brought forward the optimization design method, which combined linear programming and the principle of full restriction, through which we can obtain the magnitude of each time pre - stress and the optimized sections of each members of structure ; ( 5 ) analyzed the best times of pre - stress and pointed out that 2 ~ 3 times is preferable ; ( 6 ) conducted optimization design on large - space steel roof, horizontal parallel steel truss with local cables, horizontal parallel steel truss with global cable, and ultra - static steel truss, the result of which indicated that the multiple pre - stress structure is very economic ; ( 7 ) compared different schemes of cable placement for horizontal parallel steel truss, and the results showed that the local cable only unloaded the second girders, but had no response on the first girders and stomach poles, while global cable could unload the second girders and the stomach poles outside of turning point of cable, thus proving that global cable is more economic than local - cable

    本文的主要工作是:對國內外預應力鋼結構的發展歷史及現狀作了綜述和總結,指出當前預應力鋼結構工程實踐中存在的主要問題;闡述了預應力鋼結構的受力機理,並指出預應力鋼結構的適用范圍和特點;在考慮結構應力和變位約束的條件下,建立預應力鋼結構優化設計模型;提出多次預應力鋼結構優化設計方法和步驟,採用性規劃和滿約束準則相結合的優化方法,可優化設計出施加的每一級預應力的大小,並得到結構各部分的優化截面;對多次預應力最佳的施加次數作了分析,並建議以2 3次為宜;為驗證文中理論和方法,分別對大跨多次預應力鋼屋架、局部索的行弦鋼桁架、整體索的行弦鋼桁架和局部索的超靜定鋼桁架等算例進行了優化設計,經濟效益明顯;對行弦鋼桁架的幾種施加預應力的方案進行比較,對于局部索,預應力只對下弦起到卸載作用,對上弦和腹桿基本不起作用;而整體索預應力除對下弦卸載外,對索折點以外部分腹桿也起到卸載作用,經濟效益好於局部索。
  17. Radio - frequency cables part 3 - 2 : coaxial cables for digital communication in horizantal floor wiring - detail specification for coaxial cables with solid dielectric for local area networks of 185m reach and up to 10mb s

    射頻電纜第3 - 2部分:數字通信用水平布線同軸電纜?局域網用185m以下10mb s及其以下實芯介質同軸電纜詳細規范
  18. Radio - frequency cables part 3 - 2 : coaxial cables for digital communication in horizantal floor wiring - detail specification for coaxial cables with foamed dielectric for local area networks of 185m reach and up to 10mb s

    射頻電纜第3 - 3部分:數字通信用水平布線同軸電纜?局域網用185m以下10mb s及其以下泡沫介質同軸電纜詳細規范
  19. Radio - frequency cables part 3 - 1 : coaxial cables for digital communication in horizantal floor wiring - detail specification for coaxial cables with foamed dielectric for local area networks of 500m reach and up to 10mb s

    射頻電纜第3 - 1部分:數字通信用水平布線同軸電纜?局域網用500m以下10mb s及其以下泡沫介質同軸電纜詳細規范
  20. The mode is the official working premises distribution systems of the single buildings. the mode divide whole system into five subsystems such as the workspace, wiring of the level, vertical main line, equipment area and management area

    本次設計的模式為單幢樓的辦公綜合系統,設計將整個系統分為工作區、水平布線、垂直干、設備間和管理區。
分享友人