水平梁 的英文怎麼說
中文拼音 [shuǐpíngliáng]
水平梁
英文
horizontal beam-
At an indefinite height overhead something made the black sky blacker, which had the semblance of a vast architrave uniting the pillars horizontally
在他的頭頂上,高高的空中還有一件物體,使黑暗的天空變得更加黑暗了,它好像是把兩根石柱按水平方向連接起來的橫梁。The horizontal shear strength of the exterior reinforced concrete beam - column joints is analyzed by the stress of the conterminal beam and column
摘要針對鋼筋混凝土框架結構,根據與框架外節點相連的梁、柱構件的受力狀態,分析了外節點核心區所受水平剪力。In addition to, the fatigue crack between web and upper flange of welded steel crane beam on heavy duty service was discussed, and based on long - term observation and research, the author classified fatigue crack into bearing type and middle type crack along the horizontal direction. the causation, distributive law and mechanism of the crack were analyzed, and the precautions to take and the measures to remedy crack were presented. the main defacts including damage, crack, erosion and aging in structures, especially in concrete structure were introduced ; the defact mechanism was analyzed and the precautions to take were also given
另外,作者對重級工作制焊接鋼吊車梁腹板與上翼緣連接焊縫的縱向水平疲勞裂縫進行了長期的觀察和研究,根據疲勞裂縫產生的不同機理,將其分為支點裂縫和肋間裂縫,並討論了兩類裂縫產生的原因、分佈規律、機理以及防治的措施;對工程中經常遇到的結構構件,尤其混凝土構件的幾種主要病害(損傷、裂縫、腐蝕與老化)進行了機理分析並提出了防治措施。Being lacking of understanding of behaviors of circular working shaft, the paper proposed theory about ring - beam ' s load - distribution calculations and analyzed the structural behavior of circular working shaft ( cws ) by the numbers from the standpoint of properties of structural style and stress incorporated with thoughts of shared load introduced to research of cws. first, regarding cws as structure of series of hypothetic horizontal circular rings and vertical beams, and considering cws ' s formation and development, the paper proposed load - distribution thoughts to solve cws ' s calculations. ring - beam calculation theory was put up and software cbtlmp1. 0 was worked out based on the conditions of external applied load shared by rings and beams, and of deformation conformity
首先,本文提出用分載思想解決圓形工作井結構的計算分析問題,將圓形工作井結構看成是由一系列的假想的水平圓環和豎直梁組成的結構,考慮工作井形成過程及形成階段與項進階段的連續性,根據某一時刻相對于上一時刻外載增量由環與梁分擔、環與梁在交叉處變位增量一致的條件將環計算理論與梁計算理論結合起來,據此建立了環?梁分載計算理論並研製了環?梁分載計算分析軟體cbtlmpv1 . 0 。It also investigates the effect of secondary torque, the characteristics of moment redistribution subjected to reversed cyclic loading, and the role of spandrel beams in the overall response
著重討論了預應力次扭矩對結構受力的影響、水平荷載作用下結構的彎扭分配規律以及如何進行邊主梁的合理設計等問題。It also has important reference value for the similar construction. by the safety and seismic evaluation of this aqueduct bridge, it has shown that ( 1 ) besides the structure of this aqueduct bridge was basically unharmed without some flake of concrete cover and revealing stirrup, its intensity basically reached the need of primary design. ( 2 ) from the side of carrying capacity, rib arch could satisfy the needs under the action of wind and earthquake, but some individual frame crossbeams and most rib arch tie beams could n ' t satisfy the need
通過對東滑峪渡槽進行安全性能和抗震性能評估后表明: ( 1 )渡槽除肋拱頂面有保護層剝落、箍筋外露,結構基本完好,其強度基本達到西安理工大學工程碩士專業學位論文原設計的強度要求; ( 2 )從承載力方面看,在風荷載、地震作用下,肋拱基本滿足要求,個別排架橫梁不滿足要求,肋拱連系梁普遍不滿足要求;計入水平橫槽向地震作用的工況為設計控制工況。They act as a bridge between the group and the customers. we make continuous improvement through active listening to our customers opinion. this drives our service to the world - class level
我們的使命是發揮以客為尊的精神,同時也作為公司及客戶的溝通橋梁,聆聽客戶的意見,從而作出適當的改善,令集團管理服務邁向國際級水平。3. there is nearly correlation between technique application and the area resources ; the environment ; the economical development level. agriculture acts as agency and bridge. especially, technique training affects the usage of the new technique mostly
3 、農戶技術採用行為與當地資源、環境、經濟發展水平密切相關,農技推廣起著中介和橋梁作用,尤其是技術培訓方面所做的工作對農戶採用和持續利用新技術有較大的影響。In this thesis, four types of steel beam - rectangular cfst column connections, including normal welded flange plate ( wfp ) connection, bolted flange plate ( bfp ) connection, stiffened end plate ( sep ) connection and double split - tee plate ( dst ) connection, were designed based on the configuration of steel frame connection. total 8 models, 2 models of each kind of connections were tested under low - reversed cyclic loading at the end of cfst columns. the relationships between force and displacement at the end of columns, the relationships between the moment and rotation of the joints, degradations of strength and stiffness, ductility, failure mechanism and failure characteristics of these four connections under different axial - compression ratios were presented
本文借鑒鋼框架節點構造,設計了四種類型矩形鋼管混凝土柱與鋼梁連接節點,包括常規栓焊( wfp )節點、翼緣全螺栓連接( bfp )節點、雙t板連接( dst )節點以及加勁端板連接( sep )節點,進行了四類節點8個模型試件在柱端低周反復荷載作用下的抗震性能試驗研究,比較了不同軸壓比下節點的滯回性能、強度與剛度退化、延性、破壞機理與破壞特徵,主要結論有: 1 、節點的位移滯回曲線與轉角滯回曲線為塊型分佈,沒有或略有捏攏現象,耗能能力強; 2 、軸壓比對節點滯回曲線有顯著影響,全部節點都有顯著的剛度退化; 3 、位移與轉角骨架曲線在峰值荷載後有較長的水平或下降段,具有良好的延性性能; 4 、從整體抗震性能上看,翼緣全螺栓連接節點、雙t板連接與加勁端板連接節點都優于常規栓焊節點,可在實際工程中加以推廣。This paper sets up a fuzzy optimum math - model of the prestressed degree for prestressing bundle disposition of prestressed concrete continuous beam bridges, which is transformed into a clear math program by - level cut - set. by the solution of the clear math program, a succession of reasonable prestressing moments can be obtained. then it is convenient to dispose the prestressing system by only taking account of geometric factors of all controlling sections. based on this, a theory of automatic disposition of the prestressing bundles is proposed and an engineering example is given to demonstrate it
建立預應力混凝土連續梁橋預應力度的模糊優化問題,按-水平截集解法,將模糊優化問題轉化為確定性的數學規劃問題.求得一較合理的消壓彎矩后,只需按控制截面的構造進行預應力體系設計.在此基礎上提出了配束自動化的基本思想,並以一實例說明其理論應用Abstract : this paper sets up a fuzzy optimum math - model of the prestressed degree for prestressing bundle disposition of prestressed concrete continuous beam bridges, which is transformed into a clear math program by - level cut - set. by the solution of the clear math program, a succession of reasonable prestressing moments can be obtained. then it is convenient to dispose the prestressing system by only taking account of geometric factors of all controlling sections. based on this, a theory of automatic disposition of the prestressing bundles is proposed and an engineering example is given to demonstrate it
文摘:建立預應力混凝土連續梁橋預應力度的模糊優化問題,按-水平截集解法,將模糊優化問題轉化為確定性的數學規劃問題.求得一較合理的消壓彎矩后,只需按控制截面的構造進行預應力體系設計.在此基礎上提出了配束自動化的基本思想,並以一實例說明其理論應用From the 1950 s to the 1970 s, hong kong was able to achieve industrialisation early and establish itself as the bridge for regional economic and trade co - operation through its geographical location. one of the main reasons for our success was china s closed - door policy and, excepting japan, the less advanced state of development in the asia - pacific economies in general
上世紀五十年代至七十年代,香港能夠率先實現工業化,並以其超然的地位充當了區域經貿合作的橋梁,其中很重要的一個原因,是當時祖國內地沒有開放,而除日本外,亞太地區普遍經濟發展水平仍然較低。New five - stage cyclone pre - heater system, high efficiency air girder grate cooler, multi - passage pulverized coal burner, davison heat temperature fan, luqi bs930 electrical dust collector, as well as chain - board elevator, chain conveyor adopted in this production line can ensure that the technology is advanced compared to other production lines with the same scale
如新型五級旋風預熱預分解系統、高效空氣梁篦冷機,節能型多通道噴煤管,戴維森高溫風機,魯奇最新技術生產的電收塵( bs930 )等,輸送設備採用了耐用、節電的板鏈提升機、鏈式輸送機,將使本工程的裝備在同規模生產線中處于領先水平。This paper takes the steel constructions workshop building of bao ji bridge girder plant as background, inquiring into using isothermal level jet airflow to cut off workshop in the middle to organize airflow in it, attempting to resolve the problem of ventilation and dust removal in large space which has changeable dust source
本文以寶雞橋梁廠鋼結構車間的噴丸打磨廠房為工程背景,探討運用等溫水平射流進行空間隔斷,合理組織室內氣流,嘗試解決具有高大空間、變動塵源特點的高大廠房通風除塵問題。The results showed that the trophic lenel of lake taihu was in the transition state, from meso - eutrophic to eutrophic, of which the meso - eutrophic made up about 70 % of the total are. the eutrophic and hyper - eutrophic waters accounted for 10 % or so
結果表明,太湖營養水平處于中富向富營養過渡狀態,中富面積約佔全湖面積的70 %以上;夏季富營養及重富營養水域出現在北部湖區的梅梁湖、五里湖和西部沿岸,約佔全湖面積的10 % 。As to the current problems existing in the identification for these flutter derivatives, the dissertation tries to trace the development in the identification for the past unsteady aerodynamic forces of long - span bridges. it also investigates the method for flutter and buffeting analysis and the flutter derivatives. based on the present methods used in obtaining the unsteady aerodynamic forces and flutter derivatives, and co - funded by a natural scientific fund from the nation and a key project fund from the railway ministry, the current research has attempted to develop a device which can be employed in the wind tunnel to test flutter derivative through a forced vibration method
鑒于目前橋梁斷面顫振導數識別的水平和存在的問題,本文通過對大跨度橋梁非定常氣動力、顫振分析方法及顫振導數識別方法的回顧和評述,基於現有的非定常氣動力和顫振導數的測試方法,在國家自然科學基金與鐵道部重點學科基金的聯合資助下,研究開發了一套在風洞中採用強迫振動法測試顫振導數的裝置。Based on measurement of strains of both horizontal stirrups in the joint core and longitudinal reinforcement passing througth the joint, in different stages, transfer mechanism and factors affacting seismic behavior of the joint, were analysed. under different shear compression ration, effect of axial force ratio on seismic behawior of the joint was also evaluated, static shear and seismic shear of the joint based on capacity design were investigated. on this basis, new governing criteria and conditions of seismic behavior of the joint were put forward
通過對節點區水平箍筋以及貫穿節點梁、柱縱筋在不同受力階段應變的精細量測,對節點的傳力機理以及影響抗震性能的因素進行了分析研究;對不同剪壓比條件下軸壓比對節點抗震性能的影響規律進行了分析研究;對不同受力階段梁筋的粘結退化規律以及節點區的剪切變形進行了分析研究;對節點的靜力抗剪與建立在能力設計思路上的抗震抗剪問題進行了深入研究,提出了建立在新思路基礎上的節點抗震性能控制準則和控制條件。The system, stable and reliable, ensures the synchronization of two platforms which are apart from each other with a distance of 24m and their own level condition
該舉升梁液壓系統成功地解決了相距24米的兩平臺在運動過程中的同步問題和自身水平狀態保持問題,工作穩定可靠。The upper body of the dam, having lost the assistance of the cantilevers, now behaves predominantly as a horizontal arch.
上部壩體已喪失掉懸臂梁的輔助作用,現在主要表現出一個水平拱圈的性狀。From the global stiffness matrix of plane frame, condensing the static force and eliminating the coupling of vertical force and displacement and other broad sense force and displacement, obtained the vertical stiffness matrix of plane frame structures subjected to vertical earthquake action considering the influence of horizontal girds and nodal
從平面串並聯多質點系結構的總剛度矩陣中,採用靜力凝聚法,消去豎向力和豎向位移與其它廣義力和廣義位移之間的耦聯關系,得出框架結構在豎向地震作用下考慮水平梁和節點轉角影響的豎向剛度矩陣。分享友人