水平鉆孔 的英文怎麼說

中文拼音 [shuǐpíngzhēnkǒng]
水平鉆孔 英文
horizontal borehole
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ形容詞1 (沒有高低凹凸 不頃斜) flat; level; even; smooth 2 (高度相同; 不相上下) on the same l...
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • 水平 : 1. (跟水面平行的) horizontal;level2. (達到的高度) standard; level
  1. Benthic foraminifer fauna, ams14c dating and acoustic sub - bottom profile was analyzed in the core ey02 - 2 and ey02 - 1 drilled from the muddy deposit in the middle southern yellow sea and the mid - shelf of north east china sea. considering the results of core qc2 ? dz4 and the standard oxygen isotope curves, we discussed the late - quaterenary paleo - environment evolution, benthic foraminifer fauna, paleo - climate, the climate events and water mass in postglacial period, average sedimentation rates, paleo - water depth, origin of sediments, average sea level rise rate in the shelf of south yellow sea and east china sea. at last we discussed the condition of sea level rise in the east china, green house effect and the protection of coastal zone

    本文根據南黃海中部泥質區和東海中陸架的兩個巖芯的古生物、 ams ~ ( 14 ) c測年、淺地層剖面等,參考qc _ 2 、 dz _ 4成果及標準氧同位素曲線探討了黃東海陸架晚第四紀古環境演化、底棲動物群特徵、古氣候、冰後期以來氣候事件、古團、沉積速率、古深、沉積物源、海均上升率,討論目前中國東部海面上升的狀況、溫室效應及海岸帶保護。
  2. Pistol drilling, 6 - 8mm glass hole - maker, 6 - 8mm glue grain, level ruler or level pipe mainly for installation of suspended door, 68 expansion bolt, cross and subtraction sign screw driver etc

    手槍6至8mm玻璃開器6至8mm膠粒尺或者管主要用在吊趟門安裝6x8膨脹螺絲十字批和一字批
  3. Mine plans - drilling and cavern - part 2 : brine caverns

    礦山測量面圖.洞.第1部分:鹽
  4. Abstract : this article discusses the formation of the drilling rig platform, selection of the hole forming equipment and treatment of some incidents occurred during the construction of the bored pile foundation of the qi ? ao bridge in zhuhai under different geological conditions. it also studies such issues as the embedment of the steel casing and bottom elevation of the bored pile on the inclining rock and katarock

    文摘:筆者介紹了淇澳橋主橋灌注樁基樁施工中,在不同地質條件下,臺的搭設、成設備的選型、事故的處理,並對鋼護筒的埋設及破碎帶傾斜巖面上嵌巖面上底標高問題作了探討
  5. Pujiang tianhe crystal craftwork factory is a manufacture in all kinds of crystal frame crystal craftwork glass craftwork acrylic craftwork hotel commodity and crystal glass houseware and so on we have rebuilded design by ourselves milling machine profiled machine carve machine roll machine bevel edge machine and all kinds of produced machine such as drill machine press model machine inner - carve machine facet hot flex machine and silk - screen machine etc own professional designers machanician have immovable worker 120 thereinto high - grade antificer 5 intermediate 10 professional qc 15

    廠里有自行改造設計的晶玻璃磨機異型機雕刻機滾圓機斜邊機,以及各類用於工藝品加工和生產的機器如機壓型機內雕機刻面機熱彎機絲印機等。
  6. And it is used successfully in shield tunneling, horizontal drilling, deep drilling, slotted walls and bore piles construction projects

    主要應用於盾構隧道挖掘,水平鉆孔,深層,開鑿圍墻和樁的建築項目。
  7. Applied research on gas drainage technology with horizontal bore hole near mine roof level

    頂板高位水平鉆孔瓦斯抽放技術應用研究
  8. The works included 24 bored piles of 2. 5 meters in diameter and 55 meters in depth, 500 meters long underground concrete diaphragm wall of 0. 8 meters thick and 25 meters deep, 450 pre - cast concrete pile of 0. 5 meters in diameter, 12 meters deep soil excavation with multi - layer post - tensioning shoring system, reinforced concrete pile caps and basement slabs

    其工程內容包括了24支直徑2 . 5米,深達55米直入巖層的樁,周長500米,深度25米,厚度0 . 8米的地下連續混凝土墻, 450支直徑0 . 5米預制混凝土樁, 12米深開挖,多層鋼支撐系統,混凝土樁承臺及地庫底板結構。
  9. Nakano forging employs a sub press to carry out stamp forging of brass materials, which have superb hot - forging forming characteristics and can be punched in both the horizontal and vertical directions using the horizontal method and the closed die method

    熱鍛造成型性優越的黃銅材料在模型鍛造時可通過模架模實現及垂直方向進行式,合模式,可滿足顧客省材,省切割加工的需要,特別是數量越多其特點越明顯。
  10. Standard guide for use of maxi - horizontal directional drilling for placement of polyethylene pipe or conduit under obstacles, including river crossings

    包括渡口在內的障礙物下聚乙烯管線更換時最大方向法使用的標準指南
  11. Research on rationally arranging position of horizontal boreholes in roof rock stratum

    頂板巖層合理布層位的研究
  12. The paper draws some valuable conclusions : the limited bearing capacity of manual excavation filling pile is much higher than the limited bearing capacity of machine drilled filling pile ; through grouting injection around the pile shaft, the pile bearing capacity can be effectively improved ; proportion of resistance force around the pile side in total load is much larger than that of pressure on the pile tip, and the intensity of resistance force around the pile side is 30 - 50kpa on average

    得出一些有價值的結論:人工挖灌注樁的極限承載力明顯高於灌注樁的極限承載力;地下位對樁基承載力有顯著影響;利用樁側注漿可有效提高樁的承載力;樁側摩阻力所佔總荷載的比例遠大於樁底壓力,樁側土的摩阻強度均值為30 50kpa 。
  13. The model assimilates the latest results in the research and is solved by numerical approach which is called finite - difference equation 。 combined with experimental system, this model simulates the temperature of the water which comes from ground heat exchangers and the round temperature field

    結合實驗系統和傳熱模型,我們對製冷運行中地下換熱器的出溫度及周圍溫度場分佈進行了模擬分析,並給出了均傳熱系數的公式。
  14. Design and application of horizontal long bore hole drilling rig

    機的設計及應用
  15. Abstract : treatment of no. 2 dumping platform landslide of chang an refuse site in chengdu were introduced in this paper. bore pile and drainage project combinated with pressuregrouting engineering were carried out, and the comprehensive treatment gained good effects, not only controlling the landslide, but also meeting the user s needs

    文摘:概述成都市長安垃圾場2傾倒臺滑坡的整治手段,實施灌注樁與疏排相結合的壓漿工程,採取的綜合治理措施,獲得了良好的治理效果,既可根治滑坡,又能滿足2臺的使用要求。
分享友人