水庫最高水位 的英文怎麼說
中文拼音 [shuǐkùzuìgāoshuǐwèi]
水庫最高水位
英文
top water level- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 最 : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
- 高 : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
- 位 : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
- 水庫 : reservoir水庫岸防護林 reservoir bank protection forest; 水庫測量 reservoir survery; 水庫出流量 ou...
- 水位 : stage; water level
-
In order to reduce the re - deposit volume of the dredged channel, the method must be based on decreasing the oncoming sediment, changing the mouth site, builting the sediment control dam and raising the reservoir level
為了最大限度地減小疏浚挖槽的回淤量,必須依靠控制上游來沙量、調整入水口門位置、加設防淤堤及提高庫水位等手段,而不能通過調整挖泥槽寬度、位置及數量等措施來達到目的。The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation
福堂水電站位於四川省阿壩藏族羌族自治州汶川縣境內的岷江河段上,電站為低閘引水式開發。正常蓄水位1268 . 0m ,最大閘高31m ,庫容297 . 4萬m ~ 3 ,引水隧洞長19 . 57km ,裝機360mw 。福堂水電站閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。Article 33 it is forbidden to pile or deposit solid wastes and other pollutants on beaches and bank slopes below the highest water level of rivers, lakes, canals, irrigation channels and reservoirs
第三十三條禁止在江河、湖泊、運河、渠道、水庫最高水位線以下的灘地和岸坡堆放、存貯固體廢棄物和其他污染物。Utilizing the highest flood water level in reservoir to amend the original design flood
利用水庫最高洪水位修正原設計洪水To improve the management both in network and water dispatching and to obtain maximum economic profits, the reservoir operation section of north - west electricity management bureau, the superior of liujiaxia development, decides to set up a system of reservoir automation operation which includes an automatic system of hydrological situation forecasting, a important part of the automation operation system
洮河紅旗站是劉家峽水庫入庫站,其主管單位西北電管局為提高電網水調管理水平,獲得最大經濟效益,決定建立水調自動化系統,其中水情自動測報系統是個重要組成部分。The optimum normal water level is decided by the hamming approach degrees of each plan
以待選方案與最優方案間的海明貼近度來決策水庫正常高水位。( 2 ) calculation of landslide stability indicates that landslide stability is worse and worse if reservoir is sluiced and water level is going up, and the worst condition will happen when the water level drops from 175m to 145m and six degree earthquake overlaps
滑坡穩定性有限元分析表明,當水庫蓄水時,隨著水位的上升,滑坡穩定性越來越差,最為不利的工況是水庫水位從高程175m降至145m同時加度地震的情況。By the study, it proved gis to be an indispensability means in the hydrological study. it will exert important function on reasonably using real time space distributing information of hydrology and weather obtained by remote sensing technology, conveniently and rapidly updating hydrological subject database, setting up distributing course model that can reflect hydrologic phenomena and discipline, realizing hydrologic forecast real time, linking up the drainage area model, ground water model and surface water model and then establishing the gis of hydrology theme
利用gis技術進行水文模擬,仍有許多難題需逐步解決,模擬精度也有待提高,但是地理信息系統在水文研究中的作用卻顯得日益突出,它將在合理利用水文遙感技術獲得的水文、氣象等實時空間分佈信息,方便快速地更新水文專題數據庫,建立反映水文現象客觀規律的分佈過程模型庫,實現實時水文預報,實現流域地面模型、地下水模型和地表水模型的定位銜接及最終建立水文專題地理信息系統等方面發揮重大作用。The rigid limit equilibrium computation and finite element computation have been performed which concluded that the integral stability coefficient of no. 2 landslide shall be the minimum value when water level is 2145m a. s. l., then the coefficient increases slightly as the reservoir water level rises up, there exists, however, a fact that the stability coefficient of local section may tend to decrease continuously along with the rise of reservoir water level
進行了剛體極限平衡計算和有限元計算,證明號滑坡的整體穩定系數在2145m水位時最低,在此水位以上,將隨庫水位升高而略增;但局部斷面穩定系數有隨庫水位升高而不斷下降的情況。With world wheat stocks at their lowest levels for more than 25 years, and orange juice prices at record levels, how do you rate the relative prospects of hard and soft commodities
世界小麥庫存正處於25年多來最低來最低位,橙汁價格處于歷史最高紀錄水平,你對硬商品和軟商品相對前景如何評估?During this period, the company accepted the internal and external decorating projects for yantai civil aviation building, the glass curtain wall project for the building of bank of china in jinan ( it lies in the most flourishing commercial area. it is a 25 - story building with a height of about 100 meters. the project costs about 10 million rmb ), the external vertical decorating project for jinan real estate building ( the project is a key construction project in jinan city
2000年至今公司在總體規模、施工能力及管理水平上再上新臺階,在此期間,公司憑實力先後承接了煙臺民航大廈內外裝工程、濟南市中銀大廈玻璃幕墻工程(該工程位於濟南市最繁華商業區,共25層,高度約100米,專項造價約1000萬元) 、濟南市房產大廈外立面裝飾工程(該工程為濟南市政府重點建設項目,共26層,高度約150米,專項造價約1300萬元,公司為此動用了同濟大學專家設計力量及國內一流的施工隊伍) 、人民銀行濟南分行金庫單元幕墻窗工程等。It is agreed and understood that the insurers shall only indemnify the insured for loss, damage or liability directly or indirectly caused to camps and stores by fire, flood or inundation if these camps and stores are located above the highest water level recorded anywhere on the site during the last 20 years and the individual storage units are either at least 50 m apart or separated by, fire walls
茲經雙方同意,只有在被保險人將工棚、庫房落址在工地周圍高於最近20年記載中最高水位的地方,並且每一工棚、庫房或間隔50米,或由防火墻分隔的情況下,本公司對被保險人因火災、洪水直接或間接造成工棚、庫房的損失和由此產生的責任負責賠償。Sanyuan xijiao reservoir is a uniform earth dam which was constructed in the loess foundation with high water table, so the dam foundation dewatering is the main technique of the project, digging up soft clay of the dam foundation after dewatering and reducing the water in the clay which was filled in dam are also techniques of the project
三原西郊水庫大壩是建造在高地下水位黃土地基上的均質土壩,壩基的降水問題是該工程存在的最大技術難題,同時對降水后壩基的軟土開挖和上壩土料的減濕技術也是其關鍵技術之一。分享友人