水庫蓄水量 的英文怎麼說

中文拼音 [shuǐshuǐliáng]
水庫蓄水量 英文
pondage of reservoir
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 動詞1. (儲存; 積蓄) store up; save up 2. (留著而不剃掉) grow 3. (心裏藏著) entertain (ideas); harbour
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 水庫 : reservoir水庫岸防護林 reservoir bank protection forest; 水庫測量 reservoir survery; 水庫出流量 ou...
  • 蓄水量 : deposit of moisture
  • 蓄水 : [水文] retain water; store water; [土] impound蓄水池 pool; reservoir; source; cistern; lasher; pi...
  1. This paper establishes a model simulating dam actual placing process and considering the non - continuity of initial temperature on the boundary of new and old concrete, daily air temperature change, concrete - placing temperature, hydration heat, heat insulation on boundary, water - storing process, placing intermission and curing with water. the calculation of stress field considers the concrete weight, static water pressure, thermal stress, different autogenous volume change between rcc and normal concrete, change of elastic modulus of concrete with age and creep action

    考慮了乞今最為全面的初始條件和邊界條件,包括模擬壩體的實際升程過程,考慮了新老混凝土接觸面上的初始溫度不連續,逐日的氣溫變化,混凝土的入倉溫度,化熱溫升,邊界保溫,過程,澆築間歇以及灑養生等因素;應力場的計算考慮了混凝土的自重,靜壓力,溫度應力,常態混凝土與碾壓混凝土不同的自生體積變形,混凝土的彈性模隨齡期的變化以及徐變的作用。
  2. The high island reservoir can store a great deal of water

    萬宜藏大
  3. Reservoir impoundment do not change collecting energy level of reservoir, while make the strain energy release ahead of time according to the calculation

    根據能統計,並沒有改變區的集能平,只是促使應變能提前釋放。
  4. For studying the regulation rules of the sediment of the second phase project, and studying the reservoir capacity loss caused by deposition, the amount of sediment passing through the turbines, and the deposition and flow regime near the intake of the pump - turbines, the deposition of the reservoir was studied

    為了研究蒲石河抽能電站二期工程泥沙調度方案,對多個方案的淤積損失、過機沙、取口附近的泥沙淤積和流流態,進行了沖淤研究。
  5. The paper starts with the reservoir sedimentation, operation mode and catchment runoff characteristics. the study comprises of distributing of runoff and sediment in the catchment, the influence and trend of sedimentation and water storage under different operation mode

    課題研究主要從淤積狀況、運用方式和流域徑流特徵分析入手,闡述了流域徑流、泥沙時段分佈,研究了不同運用方式下沖淤的主要影響因素及變化趨勢,分析了不同運用方式時淤積情況和攔
  6. But as soon as the god forgets to shed his tears for months, people panic as they watch the water channel dry up and water levels in the dams drop lower and lower

    平常日子有源源不斷的自來供應,人們不會感覺的可貴。一旦連續幾個月不下雨,河道乾涸,水庫蓄水量頻頻下探新低時,民眾才會感到恐慌。
  7. The inner - plant economical operation of lijiaxia hydropower station is studied based on the disadvantageous operating mode area of the units determined by school of civil engineering of tianjin university and the actual operating experience of the lijiaxia hydropower station in the last a few years

    摘要以天津大學建築工程學院確定的李家峽電站機組的不利工況區為依據,以近幾年來該電站的實際運行經驗為參考,在綜合考慮機組初始運行狀態、機組振動特性、機組出力、下泄流水庫蓄水量和電網負荷平衡等因素的基礎上對李家峽電站的廠內經濟運行進行了研究。
  8. The load, water, and power dispatching system model based on real - time information system sis for tianhuangping pumped - storage power station is introduced in the aspects of system design, development, and debugging

    摘要就天荒坪抽能電站基於實時信息系統sis平臺的負荷、調度、電系統模型的設計、建立、開發和調試工作進行了說明和介紹。
  9. Main results are as follows : ( 1 ) the analysis about water supply source. this paper analyzed the river water without and with configuration engineering to sure the reliable quantity of surface water ; analyzed the underground water source near river and in the urban to sure the reasonable quantity of exploitation, considered the recycle of sewage, evaluated the ability to the ensure city water supply

    對地表源包括無調工程的峪(河)、有控制的峪(河)進行文分析,確定地表的可利用;對傍河地下源和城區自備井所開采地下源進行分析,確定地下的合理開采;並考慮污回用,對城市供源綜合保證能力進行全面評估。
  10. When the model is applied to a historical dam - break flood, the computational results agree well with hydrographic station records and flood tracking investigation

    依據平衡原理及流連續性條件,建立了支流容關系和支流倒回灌數學模型。
  11. What a waterfall thunderously sets off is but the accumulated potential that a reservoir has quietly stored

    在寧靜中積,瀑布在熱鬧中宣洩勢能。
  12. Construction survey technology for upper reservoir of zhanghewan pumped storage power station

    張河灣抽能電站上施工測技術
  13. Pumping water into the reservoir of a hydroelectric power plant may be a good way of storing energy captured by wind farms ( see article ) ? but what if there are no such plants to hand and no high - tension lines to reach them

    壓入利發電站的可能是儲存風電場所獲能的好方法(見文) ,但是,如果沒有可利發電站或可傳輸電能的高壓電線,那麼情況又將如何呢?
  14. Qualitative analysis on the effect of flood control and engineering safety -, seizing lots of water conservancy effective adjust storage. then making water level risen and reservoir backwater enlarged in the same flow level ? effect on beach and the buildings across river, soil salinization caused by flow from a lower to a higher place and unsmooth groundwater drainage destroy of travel resource caused by disorder enclose tideland for cultivation in reservoir silt up flood plain are given, then presents enclose tideland for cultivation dyke is important cause which water level rise in reservoir

    本文從青銅峽泥沙淤積入手,分析泥沙淤積特性和區圍墾堤開發利用淤積灘地的現狀,對防洪安全及工程安全的影響、侵佔大的有效調容、造成同級流位抬升上延、對沿岸及過河建築構成影響、因位抬升致使區周邊灌區地下不暢乃至倒灌而造成土地鹽堿化、對區大淤積灘地無序圍墾造成旅遊資源破壞等五方面影響的定性分析,提出區圍墾堤是位抬升的重要原因。
  15. When the paper uses the optimization regulation, it divides the management time into " t " stages according to ten days to make up the decision having many stages of the reservoir ' s optimization regulation, and it takes the reservoir ' s retain quantity of water or retain status of water and confiscated quantity of water a s condition variable, takes the water quantity of drawing off or quantity of electricity as decision variable. when the confiscated quantity of water can be known or be forecasted in every stage during the period of management, that is to say the confiscated water process can adopt the determined process, we can make up determine dynamic plan model with many stages and take the minimal lacking water as objective function

    在動態規劃方法中把的整個調度期,按句劃分為t個時段,以s或位z和入q作為狀態變,以q或電站出力n或發電e作為決策變,構成一個多階段決策過程,當計劃調度期內各時段的入徑流已知或可以預報,即入徑流過程可以採用確定性徑流過程時,分別按缺d最小作為目標函數建立多階段確定性動態規劃數學模型。
  16. By analyzing relevant data of 1980 - 2004, we have gotten the inflow and outflow water distribution of the two reservoirs, and calculated evaporation and seepage quantity

    通過分析1980 - 2004年資料,得出兩的入來源和出分配情況,同時根據推求兩的蒸發、滲漏損失
  17. Based on the analyses of the flow and sediment characteristics and evolution trend of the river bed of the fuling reach in the yangtze river before and after the impoundment of the three gorges reservoir, the water level, velocity variation and influenced range in the fuling reach before and fifty years after the operation of the three gorges reservoir with the construction of the fuling dock and four discharge combinations are calculated by using a two - dimensional flow mathematic model

    摘要在分析長江涪陵段的沙特性和三峽前後該河段河床演變趨勢的基礎上,運用二維流數學模型,分析了4種流組合情況下在三峽運用前和運用50年,涪陵港區碼頭修建前後的位、流速變化及其影響范圍。
  18. According to our analysis, the farmers in quzhou are in the second phase, which means they already have enough food and put much more inputs for earning high yield and high income. ( 4 ) the ground water table was getting down, caused by precipitation decreasing, no river water coming due to the upstream reservoir, complete drainage in rainy season and irrigation using groundwater

    ( 4 )自然降的降低、上游的攔,使平原失去了獲得源的機會;內部防洪排瀝體系的完善,致使入滲補充地下減少;耕地灌溉率的增加,導致農業用不斷加大,這些因素共同作用使區域資源失去平衡,引起地下位的下降,從而促使鹽漬土表層脫鹽。
  19. Based on the analyses of the relationship between the power generation and the stored energy of multi - year regulating storage reservoirs, a fuzzy multi - objective decision - making model for year - end drawdown level of multi - year regulating storage reservoirs in cascade reservoirs is developed

    摘要在分析多年調節電站發電關系的基礎上,建立了確定梯級中多年調節年末消落位的模糊多目標決策模型。
  20. Meanwhile, according to the assessment cell of small watershed, the paper evaluates each index and compositive index. the paper can provide scientific bases for both protection and use of wetland by disclosing the spatial distributing rules and analyzing the impact on environment brought because of exploiting. the study shows that 1 ) in the structure of wetland ecosystem health of panjin city in 2000, better area accounts for 22 %, generic area 52 %, worse area 26 % ; 2 ) in shuangtaizi national wetland nature reserve, the health of many regions is better, the one of partial regions is threaten, the area of wetland is decreasing ; 3 ) in the period from 1986 to 2000, paddy field, shrimp and crab pool were increased, swamp and biodiversity were decreased gradually, and the environment of wetland was polluted gradually

    本文以生態系統學、景觀生態學、生態系統健康、區域可持續發展等理論為基礎,根據聯合國經濟合作開發署提出的壓力-狀態-響應( psr )框架模型,以遙感數據及統計監測數據為基礎,採用rs 、 gis 、 gps技術,結合數理統計和數學模型方法,提取土地利用/土地覆蓋信息、濕地類型信息、小流域信息、濕地景觀指數、濕地初級生產力、濕地人口壓力指數、濕地、濕地污染物負荷、濕地變化等數據,建立盤錦市濕地生態系統健康數據,以小流域為評價單元,對每個小流域濕地進行單因子和綜合評價,揭示盤錦市濕地生態系統健康狀況的空間分佈規律,同時對濕地資源開發造成的環境影響進行剖析,為濕地資源的保護與利用提供科學依據。
分享友人