水建築物 的英文怎麼說

中文拼音 [shuǐjiàn]
水建築物 英文
release work
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞1 (建築) build; construct; erect 2 (建立; 設立; 成立) establish; set up; found 3 (提出;...
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : 名詞1 (東西) thing; matter; object 2 (指自己以外的人或與己相對的環境) other people; the outsi...
  1. Its good effect is proven by actual operation, providing reference for solving the seepage problem in water feeding structures

    為根本上解決輸水建築物接縫止滲漏問題提供了借鑒和參考。
  2. Abstract : through a series of hydraulic model tests for researching actual power tunnel operation, a conclusion is reached that in order to get a better flow pattern the profile of the wate - carrying structure should be adapted to the variation of water streamline shrinkage, flow velocity and pressure intensity. the configuration and dimension of the kinetic energy dissipator should be selected carefully to make the water tunnel safe and reliable at different levels of diversion dischage

    文摘:針對實際工程中的發電引隧洞運行的各種工況進行了工模型試驗研究,指明要獲得良好的流流態,過水建築物各部位結構輪廓的造型應適應流流線的收縮、流速及壓強的變化;為使引隧洞在各級引流量下能安全可靠地運行,需慎重確定洞內消能工的體形和尺寸。
  3. Energy dissipation and erosion control of stepped overflow structure on key dam of gully correction

    治溝骨幹工程臺階式泄水建築物的消能防沖研究
  4. With the further economic growth and the implement of development of the western regions, hydroelectric construction in our country is undergoing rapid growth, anumber of high - dam power - station is in building or in programming. in view of its higher - head and larger magnitude of spill structure outlet, it is difficult for conventional concrete or reinforced concrete structure of pier and pier room to support its vast water pressure. coupled with the improvement of prestressed method, it has been the noteworthy tool in solving the problem

    隨著我國經濟的加速發展及西部大開發戰略的實施,我國電事業也迎來了迅猛發展的大好時機,一批高壩電站正在設或規劃之中,其泄水建築物孔口及頭愈來愈大,常規混凝土或鋼筋混凝土閘室閘墩結構難以承受如此之大的推力作用,隨著預應力技術的成熟,這一技術已成為解決該問題的關鍵技術措施之一。
  5. Used to component joint water - proof, building distortion seam, construction seam and metal, concrete etc seam water - proof, for example, tunnel, substructure etc underground seam water - proof construction

    適用於裝配式結構構件砌接縫防變形縫、施工縫用和金屬、混凝土等各類預製件的接縫防,例如:隧道、人防、基礎工程等地下工程的接縫防
  6. Overall layout of discharge structures of xixiayuan counter reservoir

    西霞院反調節庫泄水建築物總布置
  7. By analyzing risk sources and those uncertain factors affecting the risk, the diversion risk is defined as the probability of the maximum discharge after being adjusted and held higher than the maximum design flood

    通過對導流風險來源和引起導流風險的各種不確定性因素的論述和分析,把施工導流風險定義為天然來(洪)經過調蓄后,導流泄水建築物的最大泄流量超過其設計最大泄能力的概率。
  8. The prestressed drainage aqueduct of through open - web truss arch structure is widely applied to cross the main canal of the mrp. it is important and significative to study the aqueduct ' s structure design and reliability thoroughly

    預應力下承式空腹桁架拱渡槽在總乾渠排水建築物中被廣泛採用,其結構設計和安全可靠性是一個非常重要且值得深入研究的問題。
  9. The comparative analysis is made firstly, which shows that the truss arch aqueduct can be built on the weak foundation and is also satisfied with the demand for large span length and the great discharge ability, so the type of aqueduct is a better for the project. then the finite element program ( super sap93 ) is applied to the structural analysis of the space structure

    首先通過對常用渡槽結構型式的對比分析,闡明該渡槽是一種可在軟弱地基上修的、能滿足大跨度、大流量要求、適用於南北調中線工程的排水建築物,然後運用有限元分析程序supersap93對桁架拱空間結構進行了受力分析。
  10. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽電站右岸旋流內消能泄洪洞是國內第一個泄量達1000m s 、頭超過100m ,即將修的旋流式內消能泄洪洞,其方案的論證與試驗研究以及成后投入使用,將在國內外旋流式內消能泄洪洞設計、研究與工程應用中具有重要的意義,將有力的推動這一新的消能形式在工程中的應用,從而為解決高壩設中泄水建築物的高速流問題與導流洞改的技術與經濟問題提供工程實例,對推動與發展力學的研究與發展均具有重要的理論與實踐意義。
  11. The geological condition for marliba reservoir project is quite complicated, for which some technical problems are to be solved there, such as the water conveyance structures have to be arranged on super - deep soft foundation

    摘要麻栗壩庫工程地質條件復雜,存在需要在超深軟基上布置輸水建築物等難點技術問題有待解決。
  12. So the labyrinth weir is particularly suited for use where the discharge structure need to enlarge the ability of outflow but the width is restricted the labyrinth weir could be divided into straight - labyrinth weir and curve - labyrinth weir in this paper

    因此,迷宮堰特別適用於泄寬度受限,但又需提高泄流能力的泄水建築物中。本文將迷宮堰分為直線型迷宮堰和曲線型迷宮堰。
  13. As the natural marvelous spectacle in the world, the qiantang bore has been increasingly focused on. so the impact that paddle structure has on tidal bore is regard as the key point in the feasibility of engineering approved

    錢塘江涌潮作為舉世聞名的自然奇觀,備受人們關注,有關部門已將涉水建築物對涌潮的影響程度作為工程可否上馬的關鍵性審批依據。
  14. Water - surrounded structure

    水建築物
  15. Hydraulics research on main conveyance structures in diversion project from south to north china

    北調工程主要輸水建築物力學研究
  16. Design of layered water intake structures for reservoir under consideration of temperature control of discharge water

    基於下泄溫控制考慮的庫分層取水建築物設計
  17. The culvert is the works buried under the fillings, which is often used in hydraulics, communication, and water supplying engineering

    涵洞是埋設在填土下的輸水建築物,它在利、交通、供排工程中被廣泛使用。
  18. The improper excavating will bear capacity, water permeability, natural structure and geological structure worsenning the base rock of foundation., this ca n ' t be allowed to the water conservancy project building, especially to block water building. lt will not only increase the expenses happened of the remedy measure, but also lengthen building straight line time limit for a project of construction

    開挖不當將降低基巖的承載能力、增大基礎的透性、惡化基巖的天然結構和地質構造,這對於,特別是擋水建築物是不能允許的,同時將會增加採取補救處理措施所發生的費用,延長施工直線工期。
  19. The large water conservancy engineering transporting water from south to north will relieve the lack of water resource of north - west and north - china regions. it has been wrote into " tenth five - year plan " of china. as a building spanning rivers to transport water, large - scale aqueduct plays an important role in this water conservancy engineering

    北調利工程是為緩解我國西北及華北地區資源缺乏而將興的大型利工程,現已列入我國「十五」發展計劃,其中大型渡槽作為跨越河流等的輸水建築物在南北調利工程中佔有重要地位。
  20. In low developed non - karat mountain area, the main water supply patten is fetching water from a river, water - fetching building is built mostly on the bank or at the bottom of the river, it seemed to be fetching water from underground, but the quantity of the water depends on the runoff of the river, so it has close relationship with surfacewater actually

    摘要人類利用開發程度較低的非巖溶山區一般以近河取為主要供方式,取水建築物多位於河岸或河底,從供形式上看屬于取用地下,但取量的大小依賴于河流流量,因此實質上和地表關系更加密切。
分享友人