水方案 的英文怎麼說

中文拼音 [shuǐfāngàn]
水方案 英文
water programme
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : 名詞1 (長桌) table; desk 2 (案件) case; law [legal] case 3 (案卷; 記錄)record; file 4 (提...
  • 方案 : scheme; plan; programme; project; proposal; suggestion; formula; scenario; outline
  1. This procedure can imitate the single well pumps water the chronometer calculates at all point water level in district declines deep with horary variety ; study the sport law of the rivers ; solve definitely flow draw water issue wanton boundary the wells of termses, predict that dives under water in the location, guide and construct and excavate the progress, appraise the rationality of the precipitation scheme

    此程序可以模擬單井抽時計算區域各點位降深隨時間的變化,研究流運動規律;求解任意邊界條件下的井定流量抽問題,預測潛位,指導施工開挖進度,評價降水方案的合理性。
  2. In this paper, mainly based on arranging data with well pumping tests in dam foundation and sum up the laws of flows under the condition of deep well pumping, the useful dewatering calculation model and parameters were set up. secondly, based on the well constructing technique which was discovered under the condition of in - situ bumping test and calculating the dewatering scheme of the two dewatering units with the calculation model, the final dewatering scheme was put forward. at last, the final dewatering scheme was appraised by observation during the construction, and it satisfied with the construction request

    本文主要通過壩基現場抽試驗試驗資料整理,在揭示黃土壩基降特性規律的基礎上,確定可以反映現場抽條件的的實用降計算模型和參數;再根據現場抽條件試驗開發的成井技術和計算模型計算壩基和壩肩兩個文地質單元的降,並按工程類比法確定最終的降水方案;最後,通過施工過程中的觀測情況對降水方案進行評價,降水方案能夠很好地滿足施工的要求。
  3. According to the distribution peculiarity of the two characteristic moments, the accessibility of water quality in taizhou source of yangtze river has been analyzed based on the maximal contamination zone of entire tide and the relationship between the length of contamination zone and the pollutant load. simultaneously, every project has been analyzed and compared by using the model in wuli lake water environmental renovation for getting some theoretic gist and technical supports for the engineering

    在此基礎上進行泰州江段質數值模擬,建立排污混合帶范圍與排污量關系曲線,並對泰州江段供源地質可達性進行了分析;將模型應用於五里湖環境治理工程中,預測各引水方案下湖體質狀況並進行各分析,從而為工程實施提供一定的理論依據和技術支持。
  4. Two kinds of technical approaches, the approach of the distribute - holes and the approach of the launder, were pointed to improve hydraulic characteristics of side - inlet sump in the paper

    本文提出了改善側向進力特性的兩種技術,即配與流槽式配水方案
  5. Abstract : by considering the water resources, agriculture and channel system condition of different counties or zones in jinghui irrigation region, the large system decomposition - coordination model and fuzzy method were applied to study the optimal model of surface and underground water utilization the irrigation region optimal operation schemes of wet, normal and dry years were computed in comparison with the present schemes used in the irrigation regions, the result indicated that the optimal result is practical and feasible

    文摘:在考慮涇惠渠灌區各縣區資源、農業生產、渠系工程現狀差異基礎上,利用大系統分解協調模型和模糊技術研究該灌區地表、地下聯合優化調度模型,得出其豐、平、枯年資源利用,並與現有用水方案比較分析,表明該研究結果切合實際,可操作性較好。
  6. With the tridimensional finite element method the tridimensional seepage was computed, by the analysis and the computation of tridimensional seepage, the discharge method of the cushion could be asserted, at the same time, the discharge of pump drainage and the up - lift of cushion bottom could be got

    通過三維有限元法計算墊塘三維滲流場,通過三維滲流分析計算,確定了墊塘排水方案,並得到墊塘底板的揚壓力值及抽排系統的排量。
  7. ( 4 ) the seepage prevention structures and drainage structure is very important for the safety and stabilization of rcc dams, so their effects is discussed in this paper to the seepage field ' s characteristics of rcc dams, moreover, the seepage control schemes of rcc dam is analyzed

    ( 4 )碾壓混凝土壩的防滲與排結構對于大壩的安全與穩定極為重要,本文研究了各種防滲與排技術對大壩滲流場特性的影響作用,並分析了各種防滲與排水方案的特點。
  8. Selection of drainage scheme for extension mining of houzhuang submine

    侯莊分礦延深開采排水方案選擇
  9. The following three alternatives are used to assess the impact caused by the projects, ( l ) the entrance of tunnel is at the downstream of the huanren dam and the main purpose of the huanren reservoir is to supply water for the project, ( 2 ) the entrance of tunnel is at the downstream of the huanren dam and the main purpose of the huanren reservoir is hydropower generation and ( 3 ) the entrance of tunnel is at the upper of the huanren dam

    本文擬研究該調工程的源工程?桓仁庫的調度運行式,使工程的正面效益較大,負面損失盡可能地小。桓仁庫的調度式有三個: ( 1 )以供為主的壩下取水方案; ( 2 )以發電為主的壩下取水方案; ( 3 )庫區取水方案
  10. Impact of new operation regulation of three gorges reservoir on navigation of chongqing reach

    三峽庫新蓄水方案對重慶河段航道的影響
  11. This treatise taking " the pipeline project of yin - da - ru - gang water transportation " as an example, explains some question which should be paid attention to in the pipeline project of water transportation design from three aspects : the comparison and selection in route and scheme of water transportation, the choices of pipes material and water hammer defence

    摘要以「引大(大浪淀)入港(黃驊港)管道輸工程」為例,從輸線路及輸水方案的比選、管材選用、錘防護3面闡述了在管道輸工程設計中應注意的問題。
  12. Recent years, the discharge of yellow river is decrease, so the water volume diverted from yellow river will also be in short supply. aimed at the irrationality use of the water resources, such as attaching importance to yellow river, insufficient use of ground water, the paper gives the maximum net benefits and corresponding water volume both yellow river water and ground water, through the use of linear programming

    本文針對目前引黃區重引黃、輕井灌,地下開采量不足及不合理的狀況,分不同黃河來水方案和不同引黃價(成本),用線性規劃對全灌區總引黃量和地下量按凈效益最優原則分配給各種作物,從而得到灌區最大凈效益及相應引黃量及地下實際使用量。
  13. The north - to - south water diversion project is a large water a i locat i on project from one river basin to another r i ver basin in the northeast of china. one of the main problems of the project is how to determine the scale and amount of water allocated. since the scenarios of water allocation involve many factors, some of them are quantitative, some are qual itative, it is hard to solve using classical methods

    南調工程是東北地區一項大型的跨流域調工程,確定調規模、調量是其核心問題之一,而北南調調水方案涉及許多影響因素,既有定性的,又有定量的,難于用經典理論技術和法解決。
  14. ( 2 ) the method of finite element discrete and optimal parameter back analysis is adopted. ( 3 ) concentrated on the question of high external water pressure of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied. ( 4 ) based on jinping cascade 2 hydropower station, numerical simulation rain infiltration of seepage field under different drainage pattern and grouting pattern are studied, also, the high external water pressure is analyzed and studied and some seepage control measures are put forward

    ( 2 )採用有限元離散?優化法進行參數的反演分析; ( 3 )針對深埋隧洞的高外壓力問題,進一步分析和研究了襯砌荷載及外壓力的作用機理和計算法; ( 4 )以錦屏二級電站深埋長引隧洞作為本文的主要研究對象,採用考慮降雨入滲滲流場分析的法對排水方案和灌漿封堵不同情況下的滲流場的頭分佈進行了數值模擬,並對其外壓力進行了分析和研究,提出了滲流控制的具體措施。
  15. Fuzzy matter - element model for the ecological evaluation of nature reserve

    模糊物元模型在生態園區配水方案優選中的應用
  16. 4. the paper also discussed ways to resolve water problems in binhai district including sewage reusing, seawater desalination, water saving agriculture and then put forward a suggested plan for water allocation in this area. 5

    ( 4 )在濱海新區資源供需分析的基礎上,從污資源化、海淡化、節農業、用結構分析等幾面探討了濱海新區資源合理配置的內容,並提出了配水方案
  17. To solve this problem, the method of " sucking - spouting " water has been put forward by lin bingnan, based on the theory of boundary layer control, namely, sucking part of the discharge at the upstream - side of the convex barrier and spouting it at the downstream - side

    林秉南院士提出了兩種: 1 、吸、噴水方案,即在邊界(突出山體)的順面將邊界層流吸走,並在下游面噴增加流動量,以控制迴流尺度。
  18. By use of the model, the gdp change, the benefit per unit water, the water flow into sea and the discharge change of main river section are obtained for beneficial regions of the south - to - north water transfer

    通過模型框架,將資源系統中的宏觀經濟子系統和資源子系統相互作用通過內生變量聯接起來,分析南北調西線工程對黃河流域受區的影響,得到黃河流域二級區不同配水方案相對于無調情況的gdp變化、單效益、人海量和主要斷面流量過程變化等。
  19. With a powerful and professional researching and exploiting team, keep the pace with the international advanced solar water heater product line, insure the excellent quality of the hinon ' s product, at the same time, picking the australia sydney university ss - c / cu plating technique of selective complex absorption coat, both the product performances and the technique indexes have reached the international advanced level

    依託英國集團總部雄厚的技術力量支持,與國內多所工程設計研究院建立廣泛合作平臺的優勢,喜能公司一直致力於成為解決中心,公司的專業技術顧問將為您提供全面卓越的優化技術和法,通過中心長期的技術積累,能夠以最優的用水方案幫助客戶實現最低的運營成本,讓客戶從技術優勢中獲取最大經濟效益。
  20. Combined with the nation 973 emphases study programming item, according to the basic study mission of resolving the lack of water resources in the yellow river, this paper is consist of three parts : forecasting of water requirement study on revival critical theory and distribution project of water resources

    結合國家973重點基礎研究發展規劃項目,本文以解決黃河資源短缺為基本研究任務,全文共分為三篇,需預測部分、可再生臨界理論研究部分以及分水方案研究部分。
分享友人