水槽引水 的英文怎麼說

中文拼音 [shuǐcáoyǐnshuǐ]
水槽引水 英文
flume
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞1 (盛牲口飼料或飲料等液體的器具) trough; manger (for water animal feed wine vat) 2 (兩邊...
  • : Ⅰ動詞1 (牽引; 拉) draw; stretch 2 (引導) lead; guide 3 (離開) leave 4 (伸著) stretch 5 (...
  • 水槽 : water channel; trough; pentrough; mantle; water slide (運木材用); cistern; scoop channel; gulle...
  1. The flumes were built many years ago

    這些是很多年以前建造的。
  2. There are a variety of causes that may bring up uncomfortable usage, traffic jam, even malfunction of glass lifer, such as bad stamping part of doors, bad tolerance with inner / outer watertight seal and dimension and material of window guide - slot, problems with regulator itself, as well as unconformity of window glass application and its design specification

    起車門玻璃升降器失效的原因很多,其中車門沖壓件不規范,車門內外玻璃擋膠條及玻璃導的尺寸形狀及材質存在偏差,車門玻璃升降器本身存在問題,以及車門玻璃與設計要求不符等等都是導致車門玻璃升降不暢,卡滯,甚至失效的重要原因。
  3. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河庫供工程取頭部由、節制閘、進閘、泄閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上與泄要求,對其過流能力也要經試驗確定,為碧流河庫增建旁通管設計提供依據。
  4. Water is supplied by fluming in this mountain village

    這個山村的靠使用提供。
  5. Composed of extruder, head, cooling water tank, first puller, hot stretch able bellow, second puller, pressing device, shaping box, third puller, coiling device and electrical control system, the set has been mainly used in the production of machine used pp packing straps

    該機組主要由擠出機、機頭、冷卻、一次牽,熱風拉伸烘箱、二次牽、壓花裝置、定型箱、三次牽、卷取裝置及電器控制系統等構成,主要用於pp機用打包帶的生產。
  6. Water invasion bursten out during the railway - tunnel construction is usually the mainly problem in constructing or operating, also which brings surface water to exhaustion and pollutes environment or effects ecology, etc. the geleshan tunnel which crosses through guan - yin gorge anticline which trend is near south north, is located between tuanjie village and jingkou village of the shapingba zone, chongqing city, which is belongs to the inducting segment of yu - huai railway. the guan - yin gorge anticline appears to ridge and slot interlacing in land form, and is composed of clastic rock and carbonate rock from jurassic xintiangou group to triassic

    歌樂山隧道位於渝懷線入段重慶市沙坪壩區團結村至井口村之間,隧道穿越近南北向的觀音峽背斜,地貌上表現為脊、相間,觀音峽背斜由侏羅系新田溝組至三疊系下統碎屑巖和碳酸鹽巖組成,歌樂山頂大部分出露可溶巖地層,地表巖溶發育,有大量泉和暗河出口,並修建有多個中小型庫、大量池塘和井。
  7. A 2 - d hydrodynamic - numerical model was applied to typical rocky rapids called jiyutan by comparing different computational models. based on the comparison of different schemes, the change of the discharge and the flow current in a branch were analyzed, and the relationship between the flow condition and excavation area, scope as well as mode was discussed, the conclusions show : ( 1 ) in a branching rocky rapids, the velocity may be reduced and flow condition can be improved by excavating one channel partly

    本文在對各種數學模型比較的基礎上,應用二維動力數學模型研究典型石質汊流灘? ?廣西潯江鯽魚灘航道整治工程方案,通過各方案計算結果比較,分析了不同汊道的開挖及汊道內不同開挖面積、開挖范圍以及開挖方式所起的分流比及工程區域航道力條件的變化規律,研究結果表明: ( 1 )對于石質汊流灘來說,在某一汊道通過局部開挖河,擴大過斷面面積,可以達到降低工程段流速、改善局部流條件的目的。
  8. An experimental research on notching wet beach of the yellow river with the short - delay blasting is made for eliminating the risk that the main river channel is often threatened by some horizontal and slanting streams occurred on the downstream of the river and solving the problems from the bend cut - off for river channel harnessing, water way dredging and the siltation of the water diversion outlets along the channel

    摘要為了利用爆破解決黃河下遊河道經常出現的橫河和料河威脅河道安全的險情以及河道整治中的裁彎取直、疏浚航道和河道口淤積的問題,在黃河濕灘上進行了微差爆破開試驗研究。
  9. In a situation that this imported product demand will also be improved further in the following several years, must optimize system this purchase, transport, load and unload, store, dredge competence of link of transporting etc., introduce the advanced idea and method on the materials supplies of expressway construction abroad, adopting more advanced modern material flow thought on the software, the pitch is provided and deliver to constructing ; develop performance excellent keeping the tank wagon warm with low costs on the hardware ; supply the barge special - purpose and in bulkly ; the special - purpose pitch shipping dock stores pot, etc. to equip, thus propose that the transport way in which our country imports the pitch is chosen, and use the economic technological demonstration method to carry on the demonstration of economic technology to these ways, therefore get our country out of and impor t the imagination of transporting way reform of pitch, propose and purchase and concentrate on and melt, transport in bulk to take the whole province or the whole country this supply platform and accord with international advanced transport suggestion of technology in unison

    在未來幾年這一進口產品需求量還將進一步提高的情況下,必須優化這一體系在采購、運輸、裝卸、貯存、疏運等環節的平,進國外在高速公路建設的原材料供應上的先進思想和做法,軟體上採用較先進的現代物流思想,對施工瀝青進行配送;硬體上研製成本低、性能優的保溫車;專用散裝供應駁船;專用瀝青裝卸碼頭貯罐等裝備,從而提出我國進口瀝青的運輸方式選擇,並運用經濟技術論證方法來對這些方式進行經濟技術方面的論證,由此提出我國進口瀝青運輸方式改革的設想,提出采購集中化、運輸散裝化這一全省或全國統一供應平臺且符合國際先進運輸技術的建議。
  10. Application of u - type trough structure under interchange approach at high water level in severe cold

    結構在嚴寒高位下穿立交道的應用
  11. The results show that the weather process occurs because of typhoon trough with cold air, deep upper trough ; the southeast low - jet by typhoon transported large water vapour and great energy of instability to heavy rainfaill area ; cold air, lower convergence and upper divergence by deep upper trough lead to development of the east - ocean low pressure and occurd strong wind

    分析結果表明:這次天氣過程是由臺風倒和冷空氣及深厚的高空共同作用起的;臺風環流起的東南低空急流為暴雨區輸送了大量的汽和不穩定能量;冷空氣的侵入加上深厚的高空起的低空輻合、中高層輻散,促使了東海低壓的劇烈發展,產生了猛烈的大風。
  12. Demonstration and replication effects are refer to the local foreign - funded enterprises which have more than advanced technology and products for local enterprises have a role model ; competitive effects are the increasing pressure that the original foreign bringing to. the situation is that domestic rivals have to raise their technological level ; contact effect refers the direct interaction between enterprises outside purely market transactions, including forward linkages and backward linkages ; effect refers to the movement of foreign - funded training skilled workers 、 managers entering in host country, or foreign - funded staff in the host country having a certain level of technology after the " switch " to domestic enterprises

    示範和模仿效應指由於外資企業有比當地企業更為先進的技術和產品,從而對當地企業產生了示範作用;競爭效應指外資企業打破了市場原有的均衡,增加競爭壓力,迫使國內競爭對手提高技術平,使國內企業在競爭中壯大,並起當地企業的模仿;聯系效應指的是純粹的市場交易以外的企業間相互影響的直接關系,它包括向前聯系和向後聯系;人員的流動效應指的是外資企業培訓的技術工人、管理人員進入東道國國內;或東道國內的外資企業工作人員在掌握了一定的技術平后經過「跳」后為國內企業服務。
  13. The silicon core pipe line is mainly consists of sj90 x30 extruder, sj45x30 extruder, sj30x25 extruder, vacuum calibrating box, cooling flume, tractor, rolling machine and others. its total length is about 43 meters

    本硅芯管生產線主要由sj90x30擠出機sj45x30擠出機sj30x25擠出機,真空定徑箱冷卻機收卷機等幾個單元組成,總長約46m 。
  14. While the precipitation of southeast of inner - mogolio is attributed as the strong convective precipitation, the rainfall of liaoning and northeast of heilongjiang is induced by subtropical high and westerly trough, and that of west of heilongjiang is influenced directly by vortex in upper air

    各區域產生極端降的天氣背景也不相同:內蒙古東南部的降是前傾起的強對流降天氣,遼寧和黑龍江東北部的降是由於副熱帶高壓和西風的共同作用起的。黑龍江西部的降是由於高空渦的直接作用起的。
  15. Artificial periodic disturbances are introduced to the outer field of turbulent boundary layer in an closed - circuit open water channel. statistical method is employed for analyzing the velocity - fluctuation - time - series. the effect of the disturbance to turbulent structure in boundary layer is studied

    在開口式循環底部湍流邊界層外區中入周期性擾動,對湍流場的速度脈動時間序列信號進行了統計分析,研究了湍流邊界層中周期性人工擾動對湍流結構的影響,結果表明高頻擾動的湍流中she - leveque簡稱sl湍流層次相似律成立。
  16. Man washing hands from water that is diverged by wooden troughs made of hollowed branches from a stream to where people can use it

    人們利用中空的樹枝製造木,把河到他們可到達的地方作洗手之用。
  17. Through the experiment, four engineering questions are answered : 1. whether the notching construction can be done on the wet beach of the downstream of the yellow river with the blasting method ; 2. whether the ditches can be created by the blasting and how long can be maintained ; 3. whether the ditches can be used to divert water and form a new river channel by water flushing ; 4. the impacts on the safety of the existing projects therein from the blasting concerned

    通過試驗,回答了在黃河下游濕灘上能否進行爆破開施工;爆破能否形成溝,形成的溝可以保持多長時間;能否作為,通過沖刷形成新河;爆破開對已有工程的安全影響等四方面的問題。
  18. Abstract : the mountain wave induced by a ridge in two - layer stratifiedfliud has been successfully simulated in a tank. the wave pattern is almost the same compared with the linear theory result qualitatively

    文摘:利用不同密度分層的鹽模擬穩定層結大氣條件,在中成功地模擬了兩層大氣分層流中二維山脊起的地形波,得到的波動圖像與線性理論模式結果在定性上基本一致。
  19. Once the spray mist settles, the collected water undergoes a second heat exchange with fresh air inducted from the bottom and then stored for recycle

    ( 3 )噴灑滴降落後,由底部入之新鮮空氣再作二次熱交換后,蓄供循環使用。
  20. Abstract : corresponding on the overall attangement of middle and small pumping station, this paper advance a frame structure form and some view of the design is put forward forreference

    文摘:就中小型抽站的總體布置問題,提出一種渡渡式的結構形式,較之傳統式方案能節省動力20 %左右,節省工程量30 %以上。同時還就渡式抽站的設計,提出幾點粗淺的看法,以供大家參考和討論。
分享友人