水泵工況運行 的英文怎麼說

中文拼音 [shuǐbènggōngkuàngyùnháng]
水泵工況運行 英文
pumping operation
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞(吸入和排出流體的機械) pump
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (情形) condition; situation 2 (姓氏) a surname Ⅱ動詞(比方) compare Ⅲ連詞[書面語] (...
  • : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
  • : 行Ⅰ名詞1 (行列) line; row 2 (排行) seniority among brothers and sisters:你行幾? 我行三。where...
  • 水泵 : water pump; compressed water pump水泵房 pump house; 水泵缸套 hoghead; 水泵工 plugman; 水泵間 [土]...
  • 運行 : move; be in motion; run; working; machine run; operation; corotation; propulsion (影片)
  1. Using the program, the thesis studied the status of the chilled water distribution in the system when operating in the practical conditions, and analyzed the performance of the system when adopting different controlling methods of pumps and the chilled water flow in the ahus ( air handling unit ) during the course of converting the constant chilled water flow system to variable chilled water flow system

    利用所編寫的程序研究了冷系統實時時,冷系統內量的實際分佈情;分析了定量系統改造為變量系統時,採用不同的控制方案及末端採用不同的量控制方法時的系統性能。
  2. ( 5 ) taking full of advantage of the ado. net and asp. net technology under the. net platform. it construct a powerful remote control and monitor system and meet the reqirment of the users. in order to achieve real - time control, it design a front environments built on the asp. net structure, from which the system can fulfill the real - time function. due to the characteristic of drain off water pump station remote control and monitor system ( big pump station need high voltage ( 6000v ) and great power ), so now do n ' t adopt the ways that client _ end controls it. in addition, the server - end design a database to manage from which the system could tackle users information and online users log in the form of winform and strengthen the safety of the system

    Net平臺下的ado . net與asp . net技術,發揮兩者的武漢理大學碩士學位論文優勢,構造了功能更強的遠程監控系統,更好的滿足用戶的需要。系統設計中以asp . net架構為前臺環境,實現了客戶端通過ie瀏覽器來實時的監控到排站的,使系統達到了實時監視,但由於大作電壓高( 6000v )功率大( 100okw )的特點,暫不採用客戶端控制系統。在服務端,設計了數據庫,並且以winform的形式來管理網路管理員和用戶的信息以及在線用戶的日誌,加強了系統的安全性。
  3. Analyses the operating condition of one machine to one pump and one machine to two pump systems adopted widely in closed circulating water system

    摘要分析了閉式循環系統普遍採用的一機一制與一機兩制的
  4. The pressure existing between the guide vane and the runner when the pump - turbine of east china tongbai pumped storage power station stops at different loads is analyzed, and the method for determining the best load at which the generator circuit breaker ( gcb ) switches off during operation of the pump - turbine is illuminated

    摘要介紹華東桐柏抽蓄能電站的時,不同負荷下停機、導葉和轉輪間壓力的變化,闡述了華東桐柏抽蓄能電站1號機組發電機斷路器開斷的最佳負荷值選定。
  5. From the experimental results, conclusions of particles " trajectories can be drawn for different densities and operating conditions. three axis segments were acquired, and three operating conditions were picked to study the distribution traits of particles inside the impeller under the different quality and concentration of the particles. based on the results, local wear of pump was forecasted and protecting measures were brought forward

    得到對單個粒子動軌跡的影響以及不同密度(質量)的單個粒子動軌跡變化規律;沿葉輪軸向取三個測量斷面,分別在三種不同下,研究各個斷面間(內)粒子分佈特徵,以及粒子質量和濃度對這種分佈特徵的影響;根據實驗結果,對輸送不同固液兩相流介質時,局部磨損進了預測並提出了一些防護措施。
  6. Experimentation of sewage pumping station based on predictive control with vvvf is carried out. the experimentation result shows that the sewage pumping station predictive control system can be running under the condition of high water level. by using this control mode, inflow sewage is pumped out entirely

    在模擬研究基礎上,搭建了模擬試驗系統,在實驗室條件下,對污站排放系統進了結合變頻調速的預測控制模擬試驗,試驗結果表明,採用預測控制,可以使系統在高位低揚程的下,使流入站管網的污等量排出,實現了節能無污的控制目標。
  7. The result of long - term operation shows that the computer control system is practical and effective, it can run in the optimal state within a long duration to fully realize data collection and process, remote data transmission and vfvs constant injection control of pumps. it speeds up the automatic procedures of the seawater treatment process, really realizes the unmanned working, decreases the physical intensity to a large extent, improves the management, enhances the management level, avoids equipment wear down as much as possible, makes the seawater treatment efficient and lessens the cost of production

    長期的結果表明,該計算機控制系統的實施切實有效,既成功實現了對被檢測參數的數據採集與處理、遠傳以及注機組的變頻調速恆壓注控制,又提高了系統的自動化程序,真正實現了無人值班作業,在很大程度上降低了作人員的勞動強度,極大的改善了現場的管理狀,提高了生產管理平,且有效避免了設備損耗,提高了處理效率,降低了生產成本。
  8. At last, through analysis on calculating results and comparison among operational schemes, it is concluded that if pull - in steady operation of pump unit can be successfully realized, then it provides the reasonable suggestions for design and operation of pump station

    最後,通過對計算結果的分析及方案對比,判斷機組能否順利牽入同步和揚,最終進入穩定,從而為站的設汁及提出科學合理的建議。
  9. On the platform of windows xp, depending on the model of the hydraulics computer simulation and the algorithm, aiming at the general main pump station ( gmps ) of yrdp, from wanjiazhai reservoir to shentongzui reservoir, the hydraulics computer simulation program has been programmed and implemented with ms vb 6. 0, which is able to simulate the hydraulics characteristics of a series of transient working conditions between gmps1 and gmps2 of yrdp

    在windowsxp環境下,以上述模擬計算模型和演算法為基礎,使用visualbasic語言,編程實現了引黃程從總干萬家寨庫至申同嘴利學模擬計算程序,對總一、二級站的多種力學瞬變特徵進了模擬計算。
  10. Computing about five work conditions of slurry pump, the fields of velocity, compression and turbulence intensity are obtained, and the pump performance curves are also achieved to check the computation credence. based on the results of flow fields, particle tracks in varied conditions are achieved by using lagrange method

    本文對渣漿的在5個下(包括設計)的清流場進了計算,得到了描述流場的速度、壓力、紊流強度等參數場的分佈情,最後計算了性能曲線來校核計算的可靠性。
  11. This experiment include many contents, in a word, that is summer condition experiment, winter condition experiment > summer - winter transition condition experiment and winter - summer transition condition experiment, furthermore summer condition experiment still include flux changing experiment and winter condition experiment still include thermal balance experiment this article dealt with the data of the test, calculating out energy absorbing ( energy discharging ) of buried pipe in winter condition ( summer condition ), input power of heat pump x heat exchanging of piece buried pipe length x co - efficiency performance ? op ( energy efficiency rate ? er ) and average heat exchanging coefficient ; in additiont this article compares the inlet water temperature and outlet water temperature of underground the first layer and the second layer buried pipe when heat pump was running, the results are that the heat exchanging ability of the second layer buried pipe outgos the first layer buried pipe, and heat exchanging is more stable ; and still analyse earth temperature resuming in the transition season. the results are earth temperature resume fast in the first week when the heat pump runs off

    本文測試內容相當多,概括地說就是四個的測試,即夏季製冷的測試、冬季供熱的測試、夏?冬過渡季測試和冬?夏過渡季測試;另外在夏季的測試中還進了變流量測試,在冬季的測試中還進了熱平衡測試。本文對測試數據進了處理,計算出了冬(夏)季埋管吸(放)熱量、熱空調器供熱量(製冷量) 、熱空調器輸入功率、埋管單位管長換熱量、供熱性能系數(製冷能效比)和平均傳熱系數等;另外,還比較了熱時地下一二層埋管進出溫度變化情形,得出地下二層埋管換熱能力優于地下一層埋管,且換熱很穩定;並分析了過渡季地下一二層埋管溫度恢復情形,得出熱系統停機一周內地溫恢復特別快。
  12. Considering the esp operating condition and the character of produced fluid, the calculation method of practical conditions and parameter is determined with five characteristic point data of esp performance curve

    採用潛油電特性曲線上的5個特徵點,考慮潛油電、產出液的特性等參數,建立反映潛油電實際參數和曲線的計算方法。
  13. Study the working condition on the relayed drainage system for large - scale submersible motor pump

    大型潛接力排系統研究
  14. So, it is quite necessary to save energy of water systems to lower the total energy consumption of the whole systems. in about 90 % operating times, the air conditioning system runs at 65 % load, the designed condition and part - load operating condition are different, so 1 the operating mode of pumps and chiller should be decided by the actual operating condition of part load in order to distribute the chilled water flux soundly

    由於在部分負荷下的空調系統與設計並非一致,而空調系統近90的時間在65的負荷下,因此空調系統需要根據實際要求來決定和冷機組的方式,以合理分配冷凍和節約系統能耗。
  15. According to the supply system composed by parallel connection water pump, many kinds of operation proposals in a single pump were put forward to provide the greatest possible flow on both sides of the demarcation point in the scope of the flux changes ; identified the system of pumps, electromotor, speed governor imitate method of characteristics curve of the power device and its rotating speed, efficiency, energy consumption calculation under different condition ; the analytical methods used for the operational plan for comprehensive evaluation of the economic and safety and optimal results

    摘要針對由並聯組成的供系統,提出了在以單可能提供最大流量為分界點的兩側流量變化范圍內具有多種方案;確定了在不同下,該系統中、電機、調速器特性曲線的擬合方法及其各動力裝置中轉速、效率、能耗的計算式;採用解析的方法對各種方案進了經濟性和安全性綜合評價,並給出最優結果。
分享友人