水流穩定性 的英文怎麼說
中文拼音 [shuǐliúwěndìngxìng]
水流穩定性
英文
flow stability- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 流 : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
- 穩 : 形容詞1 (穩定; 穩當) steady; stable; firm 2 (穩重) steady; staid; sedate 3 (穩妥) sure; rel...
- 定 : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
- 性 : Ⅰ名詞1 (性格) nature; character; disposition 2 (性能; 性質) property; quality 3 (性別) sex ...
- 水流 : 1. (江河) rivers; streams; waters2. (流動的水) current; water flow; fluent; flow; [水文] stream current
- 穩定性 : antiwhip
- 穩定 : 1 (使穩定) stabilize; steady 2 (穩固安定) stable; steady 3 (物質的性能不易改變的作用) stabi...
-
This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results
本文就錦屏二級水電站(一期)深埋長隧洞的設計和施工中面臨的一些問題,選取隧洞的一個典型斷面進行滲流、滲控分析和開挖及支護的有限元數值模擬,從而就深埋隧洞不同的開挖及支護方式對地下水滲流場及圍巖穩定性的影響和所應採取的支護措施等方面進行了探索、研究。According to different flow patterns, a new transferring rule for oil - water two phases system flowing model in pipes is built in including the stability rule for stratified flow patterns and transferring border and anti - phase border for deconcentrating patterns and mixture patterns
根據管內油、水兩相流流型特徵,建立了新的油、水兩相管流流型的轉換準則。它包括:分層流型的穩定性準則、分散流型和混合流型的轉換邊界及反相界線。In this article, seepage and stability against deep sliding are studied and discussed in detail as regard to dongzhang dam which has glacis weak surfaces in the dam foundation, some valuable results are obtained
本文結合壩基含有緩傾角軟弱夾層的東張水庫大壩工程,對壩基滲流及抗滑穩定性問題進行了較為深入的研究,得出了一些有意義的結論。From the introduction of the structure and characteristic of dcs, the analyzing in process and control peculiarity of huaxin type cement kiln and the analyzing in the ordinary forms of computer control system in the cement plant, to determine the feasibility of application of the dcs in computer control system of huaxin type cement kiln ; introduced the structure of the system hardware, constitutes and characteristic of the industrial network, the characteristic and the performance in industrial control system of the software system ; illuminated the whole course of the design and the application of simatic s7 - 300 programmable controller in the industrial producing process profoundly : the protraction of a control flowchart ; the confirmation of the control scheme in every cell ; how to workout a table of the all controlling and measuring dots in the control system ; how to set up a plc control project ; the configuration of the hardware and the network in project ; illuminated the course of how to program the plc control program in detail ; how to establish a connection between the plc and the programmer ; how to download the configuration and the program of the plc project ; the configuration of control center software simatic wincc ; the whole course and the methods of the control system debugging ; illuminated the essential in the course of the design in project and program ; illuminated the problem and its respondence maybe encountered in the project ; illuminated the superiority of the new control system in inspecting, operating and its stability ; discuss the development of the computer control system in the application of the huaxin type cement kiln
從介紹了dcs的結構、特點和分析華新型水泥窯的工藝控制特點及當今在水泥窯計算機控制系統上採用的幾種常見形式的比較出發,分析了在華新型水泥窯應用dcs的可行性;詳細介紹了系統硬體結構、網路組成及特點、所採用的軟體體系的特點及其在工業控制應用中的性能;深入詳細地說明了西門子s7 - 300可編程序控制器在華新型水泥窯控制上應用及設計的全過程:控制流程圖的繪制;單元控制方案的確定;系統控制測點表的編制; plc控制項目的建立;項目硬體及網路的組態; plc控製程序的編制過程並詳細說明了控製程序的編制思路; plc與編程器連接的建立; plc項目組態及控製程序的下載; wincc監控軟體的組態;控制系統的調試過程及方法;對設計和使用的要點及系統調試時應注意的問題進行了說明;對項目的實施后的華新型水泥窯控制系統在操作和控制上及其在系統易維護性、系統穩定性上的優勢進行了說明並討論了華新型水泥窯計算機控制系統的發展方向。The thesis built the relation between containing water and the properties of trail dam ' s soil by geomechanical properties of trail dam ' s soil ; analysed the seep rule of water in the trail dam ' s field and the change of soakage line. the thesis applied the limited element to analyze the trail dam of baogang by the engineering item in production. it calculates the dynamic and static response about the dam using the numerical simulation method
本文通過大量的尾礦土物理力學性質試驗資料,建立了含水量與尾礦土性質之間關系曲線;分析了水在尾礦壩區的滲流規律和不同標高時浸潤線的變化情況,為分析尾礦壩的穩定性提供依據;結合生產上的工程項目,從包鋼尾礦壩的穩定性研究入手,應用有限元法,通過數值模擬分析了水對尾礦壩的靜力、動力穩定性影響。In the paper, the effects of mooring position, towing line length and towing speed on the course stability and towline tension are analyzed firstly for the ship towing system in calm water
由於在實際海況中,除了受到風、流的影響之外,波浪作用力所造成的影響更為巨大,在波力及波力矩的作用,船隻航行的航向穩定性與靜水中相去剩甚遠。Study on pressure stability of ultrahigh - pressure water jet system
超高壓水射流系統壓力穩定性研究To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction
混凝土縫面處理採用高壓水流沖毛技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用定型鋼模板施工技術,提高了壩體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提高了接頭強度和鋼筋連接速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。The evaluation on stability of seepage flow of the right dam abutment in laohe reservoir
澇河水庫右壩肩滲流穩定性評價30 % ~ 45. 3 % of extracellular mc and 30 % ~ 51. 7 % of total mc were removed by chl orination. cascade biological contact oxidation reactor was more effective and stable for the treatment of eutrophic water than one - step reactor
接近於推流反應器的三階生物接觸氧化反應器對富營養化原水的預處理效果與穩定性優于單階生物接觸氧化反應器。2. in order to deeply probe into the influence of crosslinked degree on er properties and expediently characterize the structure of the supramolecular complex, six hydrosoluble - cyclodextrin polymer / 3 - hydroxy - 2 - naphthoic acid er particles were synthesized. fluorescence analysis conformed that all the polymers can form 1 : 1 type supramolecular complex with the guest
為了進一步考察交聯度對電流變效應的影響,並便於超分子配合物顆粒的結構表徵,制備了6種不同交聯度的水溶性-環糊精聚合物,以3 -羥基- 2 -萘甲酸為熒光探針探討了不同交聯度超分子配合物的組成、穩定性及熒光性質。In china, the impacts from ice mountain degradation, including water resource shortage, frequent inundation, wet land degeneration and reduced stability of river system etc. are more obvious with each passing day
在中國,冰山的退化所產生的影響日趨明顯,其中包括水資源短缺、水患頻發、濕地退化和河流系統穩定性降低等。Hydrology regime and river channel evolution become complex because of double influences of river flow and tide. there is little appropriate method so far. therefore, when the impact us assessed of water project on flood control, the following aspects should be focused on, river evolution and stability of project - sections, design tidal level, flood - tide combination scheme, pre - project and post - project impacts on river channel, water level and flow condition
長江河口段為潮流河段,徑流潮流的雙重作用使得區域水文情勢、河道演變規律錯綜復雜,開展防洪影響評價研究時,河道演變及工程段穩定性分析,設計潮位的分析計算,洪潮組合方案擬定,工程前後對河道及水位流態影響的模擬等均是目前尚無十分成熟的方法,需要進一步研究的課題。Soil embankment is widely used in water conservancy and flood prevention projects because of its being able to drawing on local resources and other advantages. how to analyze and calculate the seepage and stabilities of levees under high level flood reasonably, and supply reliable technological support for dangers removing and strengthening are of great engineering significances
土質堤防因具有能就地取材等優點而為水利及防洪工程廣泛採用,合理分析與計算高洪水位作用下堤防的滲流及穩定性、為除險加固提供技術支撐具有重要的工程實際意義。The stress condition ; overall stability ; effect of filling gravels into the hole of the block of the precast concrete interlocking blocks in the water flow during the flood period as well as the resistance parameters of the blocks are studied through experimental simulation ; in which a comprehensive analysis is made on the mechanical stability and the anti - erosion properties of the blocks, and then the requirement and the safety degree of the gravel filling are given
摘要通過試驗模擬研究了預制混凝土連鎖塊在洪水期水流中的受力狀況、整體穩定性、孔內填充碎石的作用及連鎖塊阻力參數,綜合分析了連鎖塊結構的力學穩定性和抗沖性,給出了碎石填充的要求及安全度。The dynamic adjustment of an alluvial river has a tendency that the entropy production or the rate of energy dissipation of flow is minimum rather than the entropy is maximum when a river is in a relative equilibrium condition
當河流處于相對平衡狀態時,水流的熵產生或能耗率為最小值。最小熵產生原理或最小能耗率原理保證了河流在相對平衡狀態的穩定性。The pin silicon photodiode made by alice - china group, which has a large area and high performances, is an important part of the photon spectrometer ( pros ) pbwo4 detector read - out system on the alice experiment. the pin diode has a sensitive area of 16x17 mm2. its leakage current is lower than 5na at room temperature
本工作研製的pin硅光電二極體的靈敏區面積為16x17mm2 ,常溫漏電流小於5na ,紫光區量子效率約為83 % ,結電容為110 - 120pf ,以及由pin光電二極體與電荷靈敏前置放大器組成的讀出系統的噪聲水平在- 25下小於527個等效噪聲電荷,並經過了長期性能穩定性的考驗According the key factors we find, we bring forward a new conception : multilevel suppressor and design a new high performance suppressor whose ion - exchange membrane has bigger areas and using three electrodes including one cathode ( anode ) and two anodes ( cathode ), at the same time we fill the suppression compartment with one kind of ion exchange resin which has moderate exchange capacity. according to our experiment ' s results, we find the new type suppressor has quite high working current efficiency and suppressing capacity. in most cases, the suppressor ' s current efficiency is over 90 % ; the suppressor can transform the naoh ( concentration : 200mmol / l, flow rate : i. oml / min, conductance : over 10000 i - i s cm " ) to pure water ( conductance : 8. 9 it s cm in chapter 3, the high performance suppressor is applied in determination some trace - amounts ions in plating solution, sewage. in this chapter, we also have a research on the gradient ion chromatography
第二章首先以xyz - 1型電化學抑制柱為例,分析了電化學抑制柱的抑制過程得出影響抑制容量的主要因素主要是抑制柱的電流效率和離子交換膜的極限電流密度,因此採用中等交換能力的離子交換樹脂作為抑制室的填料以提高電流效率,在通常情況下電流效率可達到90以上;在選用同種離子交換膜的前提下,可通過增加離子交換膜的有效面積達到提高極限電流的目的從而提高抑制柱的抑制容量,因此提出了多級抑制的概念並據此研製了共電極式高容量電化學抑制柱,該抑制柱最高可將流速為1 . 0ml / min ,濃度為200mmol / l電導率超過10000 s ? cm ~ ( - 1 )氫氧化鈉溶液抑制為電導率低至8 . 9 s ? cm ~ ( - 1 )的純水,並且具有穩定性高、分析結果準確等優點。The study shows that the soil erosion of this region is getting worse
經評估,該區水土流失正處于青年期,潛在不穩定性。The seepage stability analysis for the embankment of a hydropower station
某抽水蓄能電站圍堰滲流穩定性分析分享友人