水溫溫控開關 的英文怎麼說

中文拼音 [shuǐwēnwēnkòngkāiguān]
水溫溫控開關 英文
ctts coolant temperature thermo switch
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ形容詞(不冷不熱) warm; lukewarm; hot; gentle; mild Ⅱ名詞1 (溫度) temperature 2 (瘟) acute ...
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (使開著的物體合攏) close; shut 2 (圈起來) shut in; lock up 3 (倒閉; 歇業) close down...
  • 水溫 : water temperature水溫表 water-thermometer; water temperature gauge; 水溫自動調節器 aquastat
  • 溫控 : thermal time switch
  1. The central control room of the branch is located in the bank of communications plaza in the lujiazui, shanghai, which adopts the xbrother developed professional security and facility control system which monitors and controls 10 subsystems in the central control room, including : the ups control system ; the coulometer control system ; the leaking control system ; the temperature and humidity control system ; the air conditioning control system ; the video surveillance system ; the sensor of in out water temperature control system ; the access control system ; the switch control system and ; the fire alarm system

    交通銀行機房位於上海浦東新區陸家嘴金融中心的交銀金融大廈內,其機房監系統採用我司自主研製的專業機房監系統。對機房內的ups監系統電量儀監測系統漏系統濕度監系統空調監系統視頻監系統進出傳感器監測系統門禁監系統狀態監系統消防監系統等10個子系統進行集中監,對所有的設備和系統進行工作狀態運行參數報警處理等監視和管理。
  2. Ctts coolant temperature thermo switch

    水溫溫控開關
  3. This paper introduces the development process of wastewater disposal, it ' s auto control system, the level of nowadays and several new techniques of china and foreign countries. the immanent structure, control rules, main features and design methods of auto control systems in wastewater disposal process are studied in this paper. aiming at four typical parameters, such as temperature, dissolved oxygen, ph and the planes of water, the distributed control system is designed, composed by pc called epigyny computer and scm 8098 called hypogyny computer, and some sensors, shift deliver utensils and related meet orifices of parameters gathering and figures communication

    本文介紹了國內外污處理及其自動制系統的發展過程、當今平和提高自動化程度的若干新技術;研究了污處理自動制系統的內在結構、制規律、主要特點和設計方法;選取污處理中的典型參數度、溶解氧、 ph值和液位等為制對象,設計了以個人計算機為上位機、以8098單片機為下位機,並輔之以傳感器、變送器及相介面單元所構成的二級集散制系統( dcs ) ;介紹了幾個主要程序模塊的設計思路、工作過程,這些程序模塊是:用高級語言visualbasic6 . 0發的上位機人機交互界面程序、數據處理和圖表輸出程序,用執行效率高的匯編語言發的下位機數據採集與系統監程序、上位機與下位機之間的數據通信程序,匯編語言與vb之間的轉接程序,等等。
  4. Besides the basic requirements of a usual home heater like safety and auto - control on water temperature in tank, the new one was supposed to have more functions, the most important ones of which are temperature control on outlet and remote - switch on / off the machine

    本項目除了通常對電熱器的安全性和度的自動制等要求外,還希望所設計的制器具有恆制、遠程制等功能。
  5. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監預報預警決策系統發:為監、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及方案提供依據。
  6. This control system adopts creditable plc for real control ; it sends many simulating signals collected by old sand temperature of inlet, suction opening temperature of double disk, inner sand temperature of double disk, current of mainframe and current of fan ; meanwhile, the operation signal and switching value signal outputted by material movement transducer is inputted to switching value module of plc ; it gets evidence of water feeding after cpu account ; the operation result of cpu is outputted by switching value of plc to control unlock combination of coarse, middle and thin water feeding electromagnetically operated valve and then gets different water feeding quantity

    制系統採用高可靠性的plc可編程序制器進行實時制,傳感器所採集的入口舊砂度雙盤抽風口度雙盤內砂主電機電流及鼓風機電流等模擬量信號直接輸入plc的模擬量採集模塊,同時加砂設備運轉信號及加砂設備物料移動檢測傳感器發出的量信號輸入plc的量模塊,由cpu獲取經運算而得到加計算依據, cpu運算結果直接由plc的量輸出制粗中細加電磁閥的啟組合,而得到不同的加量。
  7. In this paper, referring to qingju water power station, temperature control analysis and study has been done : study on the match ratio of the concrete and question of modifying of the special fine sand concrete to improve resisting ability of splitting of concrete ; study on the technology of the highly mixed fly ash to reduce the adiabatic temperature rise of concrete ; in case of the condition of resisting splitting to allow, study on the temperature control measure to strengthen and water the size of building, simplify the operational procedure, accelerate the construction speed, economize the expenses of the project

    問題成為青居電站設計和施工的鍵技術問題。 、本文對工大體積混凝土問題進行了分析和總結,結合青居電站閘壩工程,度應力及制研究:研究混凝土的配合比及特細砂混凝土『改性問題,提高混凝土的抗裂能力;研究高摻粉煤灰技術,降低混凝土的絕熱升:在抗裂條件允許的情況下,研究施工過程中措施的簡化,以加大澆築尺寸,簡化施工程序,加快施工進度,節約工程費用。
  8. Ccevs coolant control engine vacuum switch

    冷卻制引擎真空
  9. The controlling box collects the temperature and the humidity of the experiment box and the temperature of the water tank with platinum resistance transducer that has three paths. then they are sent to the microprocessor 89 c55 to dispose by a / d and sent to the d / a to be an 4 ~ 20 ma output of simulant value. at the same time, the outputs of six paths switch quantity drive respectively the relaies of heightening temperature reducing temperature alarm and so on

    「恆、恆濕制箱」由三路鉑電阻傳感器採集試驗箱的度、濕度和箱的度,經12位a d送至微處理器89c55處理,送至d a輸出4 20ma模擬量,同時,輸出六路量分別驅動加濕1 、加濕2 、升、降、除濕、報警等繼電裝置。
  10. This water heater is equipped with a high limit control switch that is designed to shut off the power to the elements if the water temperature exceeds170 f ( 77 c )

    本熱器配置高限制,用於當熱超過77 c時,閉通向加熱元件的電源。
  11. Cvsco coolant vacuum switch cold open

    真空冷車打
  12. Cvscc coolant vacuum switch cold closed

    真空冷車
  13. This series of products can be applied to heating furnace, industrial kiln semiconductor stove, precise temperature control of reaction caldron, boiler heat treatment, temperature control and process control system field such as petrochemical industry light industrial machinery and so on. intelligent manipulator is matching product of pid regulator or dcs and other system, which mainly use to manual regulation under the system running or special condition and to carry out operate as a backup instrument when main machine has happened failure or maintenance. according to field regiurement

    具有5個模擬輸入in1 - in5 2個模擬輸出out1 out2 ,一個量輸入di , 2個量輸出和豐富的制演算法,適用於鍋爐汽包位三沖量制或兩沖量制並可帶汽包位壓力補償功能適用於一般工業過程中度壓力液位流量等各種過程參數的串級制,前饋制雙路制等,並可帶后備操作器。
分享友人