水管區 的英文怎麼說

中文拼音 [shuǐguǎn]
水管區 英文
aulic region
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : 區名詞(姓氏) a surname
  • 管區 : district
  1. A large number of neurons with nig - li were seen in the anterior olfactory nuclei, accumbens nucleus, septal area, 09600045, 39970377, 39570109 ) 9 ventral pallidum, pallidum, caudate putamen, nucleus of the stria terminalis, anterior hypothalamic area, tuber cinereum area, lateral hypothalamic area, perifornical nucleus, supraoptic nucleus, arcuate nucleus, mammillar nuclei, substatia nigra, ventral tegmental area, retrorubral area, superior and inferior colliculus, periaqueductal gray, nucleus of the solitary tract, and superficial layers of the medullary and spinal dorsal horns

    大量nk3受體樣免疫反應陽性神經元出現於前嗅核、伏隔核、隔、腹側蒼白球、蒼白球、尾殼核、終紋床核、下丘腦前、下丘腦結節、下丘腦外側、穹隆周、視上核、弓狀核、乳頭體、黑質、腹側被蓋、紅核后、上丘和下丘、導周圍灰質、孤束核、及延髓和脊髓背角淺層。
  2. For the record of expenditures please refer to appendix 1 as requested, they had also prepared for community disaster prevention, other necessities including raincoats, galoshes, flashlights, office furniture such as desks, chairs and file cabinets, as well as other equipment like water pipes and water pumps

    此外,應要求亦準備了社災害防治所需用品如雨衣雨鞋手電筒及辦公室設備如桌子椅子檔案櫃等,和機等災難時所需設備。
  3. Thirdly, the correlative coefficient is computed between the pressure fluctuation signal of draft tube and the displacement signal of upper guide bearing, the thrust bearing and the head cover, with this the conclusions on the shafts response due to pressure surge in

    並與模型尾壓力脈動試驗結果進行對比?結合流動模擬試驗以及動力特性計算結果,全面分析?評定機組的實際運行狀況,劃定運行域,為電站合理調度
  4. But ken daniels who teaches plumbing at london ' s hackney community college, said : " plumbers at the very top end are earning around 150, 000a year

    而在倫敦哈克尼社大學教授維修課程的肯?丹尼爾斯則說: "最頂尖的工人年收入能達到15萬英鎊。
  5. But ken daniels who teaches plumbing at london ' s hackney community college, said : " plumbers at the very top end are earning around 150, 000 a year

    而在倫敦哈克尼社大學教授維修課程的肯丹尼爾斯則說: "最頂尖的工人年收入能達到15萬英鎊。
  6. The noise constantly is not affecting our normal life, for example ; just repaired the family, to the quiet at dead of night building about the water pipe noise, has caused you to be unable normally to rest, the senior citizen, the neurasthenia, the heart was not specially good and so on the community, was is unable to rest, the saint porch company produced " the down - flow pipe sound insulation wrap " the product, fundamentally has solved this problem, this product has used the advanced sound insulation, the sound absorption, the material, passed through the specialized technical many years research development, and experimented after the beijing ten plots different levels owner, the sound - insulated effect achieved above 90 %, satisfaction rate reached above 99 %, did not have an example suit, received the owners universal welcome

    噪音無時無刻不在影響著我們正常的生活,例如;一個剛剛裝修完的家庭,到了夜深人靜樓上下的噪聲,使你無法正常休息,特別是老年人,神經衰弱,心臟不好等群體,更是無法休息,聖軒公司生產的「下隔聲套」產品,從根本上解決了這個問題,此產品採用了先進的隔音,吸音,材料,經過專業技術多年的研究開發,並經過北京十個小不同層次業主試驗,隔音效果達到90 %以上,滿意率達99 %以上,無一例投訴,受到業主們普遍歡迎。
  7. The salt water system drawing for the kowloon south no. 2 pumping station and its reservoir andor the latest planning report would be useful to our understanding of the proposed salt water reticulation to the north of the development area via the pcwa. may we obtain a copy of them

    為了解經公眾貨物裝卸連接發展北面的擬議鹹道網,九龍南二號海站及其配庫的鹹系統繪圖及或最新規劃報告對我們甚為有用,可否給我們一份復本?
  8. It became necessary to provide drainage or sewer systems to carry such wastes away from the area.

    提供排系統或污道系統,把廢物排出市已成為必要。
  9. Multi - source water supply network for subarea based on graphic theory

    圖論法研究多網供
  10. The paper quests for several unfathomed problems in water - saving irrigation water managementand establishes the corresponding optimization model. the optimization model of water - saving irrigation water management gained from the paper can provide basis for management of agriculture water in the areas that is short of water, and it also can provide reference for similar area in the north

    論文對節灌溉理中的幾個主要有待解決的問題進行了探索,建立相應的優化模型。所得的節灌溉理優化模型可為缺的農業理提供依據,在北方相似地具有一定的參考價值。
  11. Designning well tube and drill - hole diameter in order to increase thickness of both annular packing gravel and water - resisting clay, nylon net packing around well tube filters, designing filter layer on the boundary between packing gravel and water - resisting clay and ramming the gravel by working the piston into the well after gravel packing completion and the filling clay for salt - water resisting etc. we succeeded in constructing 3 drinking - water wells in minqin county, proved the affectivity and feasibility of using it and giving a certain technical demonstration of construction of drinking - water well in the same similar to this area

    通過孔徑與徑的調配設計,增大環狀粒料層和止粘土層的厚度;濾外包尼龍紗網;粒料與止粘土接觸界面上設計反濾層;填粒后先行拉活塞利用力夯實粒料層,再投粘土球止掉上部鹹等措施,在民勤縣三口人飲井施工中取得顯著效果,證明了該套成井工藝的有效性和可行性,有望為同類地人飲井施工提供技術示範作用。
  12. It is suggested that in the regions of aqueous soil with faster seepage velocity, either the tube - wells can be spaced adequately closer or for the same spacing the number of tube - wells and length of tubes can be reduced under the condition of assuring regular heat transfer effect

    在滲流速度較大的富,在保證常規換熱效果的情況下,井間距可適當減小,或在同樣井間距下,可減少井數量或減小理長度。
  13. From the aspect of area distribution, problem of water environment and factors of population, society and economy do n ' t coordinate with each other : in those areas which are rich in water, there are serious pollution and waste ; in those which are lack of water, economy is relatively behind the times ; in those where there is less lack of water, high population density faces the water resource with great potential pressure

    環境問題與人口、社會、經濟等因素在地分佈上很不協調,如資源豐富地污染與浪費十分嚴重;缺,經濟相對落後;缺程度低的地,人口密度較高,使資源存在巨大的潛在壓力。在影響環境的相關因素中,人口因素的作用十分突出,主要表現在兩個方面:一是地人口數量與分佈的集中程度是決定資源壓力及相關環境問題的真下因素;二是人口素質與平之間具有一定的正相關關系。
  14. Abstract : with some practical examples , this paper deals with the hydrogeophysical - remote sensing combined exploration scheme , its application in stages of hydrogeological generalized survey , reconnaissance and detailed investigation , its utilization in special landscape areas , difficult areas and geologically complex areas , and its use in exploration management and harnessing of waters

    文摘:討論文物探、遙感聯合勘測方案在文地質概查、普查、詳查階段中的應用;在特殊景觀、困難地、地質條件復雜地中的應用;在找、治工作中的應用,並介紹若干實例。
  15. With some practical examples, this paper deals with the hydrogeophysical - remote sensing combined exploration scheme, its application in stages of hydrogeological generalized survey, reconnaissance and detailed investigation, its utilization in special landscape areas, difficult areas and geologically complex areas, and its use in, exploration management and harnessing of waters

    摘要討論文物探、遙感聯合勘測方案在文地質概查、普查、詳查階段中的應用;在特殊景觀、困難地、地質條件復雜地中的應用;在找、治工作中的應用,並介紹若干實例。
  16. Approved drainage authority area plan

    核準排圖則
  17. Drainage authority area

  18. The effluent conduit joints, fuel gas pipe valves, elevator brakes and such electromechanic products of ezhou sanwei casting co., ltd are exported to britain, the us and germany, etc. of which, the port tappets are exported to cummins which leads in power equipment manufacture worldwide ; pipe joints and valves are exported to the us mueller group which is the biggest supplier of such products in north america

    鄂州三維鑄業有限公司所生產的出道接頭、燃氣道閥門、電梯制動器等機電產品及汽車零部件出口到英、美、德等國家,其中汽門挺桿出口到世界領先的動力設備製造商美國康明斯公司,道接頭及閥門出口到此類產品北美地最大供應商美國mueller集團。
  19. The victoria harbour phase ii water control zone was declared in 1995, and this in turn enabled the epd to begin the task of identifying and removing expedient connections that were polluting the nullah

    1995年,政府劃定了維多利亞港第二期,環保署先調查內非法接駁排污渠污染的情況,繼而拆卸非法接駁的污道。
  20. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺河口電站工程實際資料,對m方案和n方案溫度場進行了施工期和運行期全過程模擬計算分析,給出了拱冠梁剖面和壩體中心縱剖面準穩定溫度場等值線圖以及施工期、運行期拱冠梁剖面和壩體中心縱剖面非穩定溫度場等值線圖,提供了施工期逐月和運行期每年最高、最低溫度等成果,分析了壩體溫度分佈規律以及高溫形成的原因,並探討了預埋冷卻的效果和可行性以及預埋冷卻域。
分享友人