水線圖 的英文怎麼說
中文拼音 [shuǐxiàntú]
水線圖
英文
plan of waterlines- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 線 : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
- 圖 : Ⅰ名詞1 (繪畫表現出的形象; 圖畫) picture; chart; drawing; map 2 (計劃) plan; scheme; attempt 3...
- 水線 : waterline; shoreline水線標志牌 subaqueous cable marker; 水線面 water plane; 水線漆 topping paint;...
-
Half breadth plan
半寬水線圖Double video s - video heft output high plane definition express 500 line image still in focus vga chase row output meet simulate 5. 1ch
復合視頻s端子分量輸出,水平清晰度高達500線,圖像更清晰Double video s - video heft output high plane definition express 500 line image still in focus vga chase row output meet simulate 5. 1ch output
復合視頻s端子分量輸出,水平清晰度高達500線,圖像更清晰On the basis of the isograms, we analyzed the variation law of yield and grain protein content with soil water content, nitrogen and p2o5,
用等值線圖描述產量和蛋白質含量的水氮和氮磷兩因素效應,分析產量和蛋白質含量變化規律及其關系,確定實現一定生產目標的水肥管理方案。Study on the arithmetic of automatically drawing isoline of groundwater level based on gis
的地下水水位等值線圖自動生成演算法研究We find that the petrology characteristic of all the samples have no characteristic of meteoric water such as geopetal structure, infiltrative sand, ( uniform cement and gravitational cement on base of the research of the dolomite in the regions. on the dot diagram of combination of mgco3 ( mol % ) and sr, the dot are all close to the line of seawater whether they are microlite - crystalline penecontemporaneous dolostone or diagenetic dolostone of various crystals. the 87sr / 86sr value of dolostone or matrix is less than the one of sparry calcite in cave or vein, and close to the value of seawater
通過本區白雲巖的研究發現:已有的白雲巖樣品的巖石學特徵沒有顯示出如示底構造、滲濾沙、新月型膠結物和重力膠結物等大氣淡水作用的特徵;在白雲石mgco _ 3mol百分數和白雲石sr含量的投點圖中,無論是準同生成因的泥?微晶白雲巖,還是粉?細晶(或中晶,或細晶以上的不等晶)的成巖白雲巖,均投在海水線的附近;白雲巖(或基質)的~ ( 87 ) sr / ~ ( 86 ) sr比值顯著低於與孔洞或脈中充填的亮晶方解石,且與海水值十分接近, ~ ( 13 ) c和~ ( 18 ) o值顯著高於孔洞或脈中充填的亮晶方解石,也偏向于海水值; mn含量則顯著低於孔洞或脈中充填的亮晶方解石。Cfx software is used to simulate flow fields of water cushion pool. contour stream line, vortex and kinetic energy in water cushion pool are found and offered as visualization form. the results of numerical simulation and piv are analyzed and compared in this paper
使用數值軟體( cfx )對此水工實驗模型的淹沒射流流場進行了數值模擬,得到水墊塘內的速度場、等流函數線圖,將這些計算結果以可視化結果的形式給出。After that, this paper centrals on xi ' an " s urban competitiveness and analyzes the advantages and disadvantages of xi ' an using boxplot method
在此基礎上,著重對西安市的城市競爭力現狀及水平進行了實證研究,並運用箱線圖方法對西安城市競爭力的優劣勢作出了分析判斷。When catchment area, average channel gradient and catchment shape factor of designed culvert or bridge are known, a user can be convenient to get local parameters c, e and b from standard contour charts and easy to calculate flood flow just by a calculator. design period of flood flow is enormously shortened as well as a high precision. estimated flood flow through culvert or small bridge by new calculation model is generally less than by traditional methods, so that much cost is cut down a s reducing the span of culvert or small bridge
以75000km ~ 2的川中丘陵地區為試點研究區,繪制了該地區新模型的參數等值線圖,率定了不同設計頻率的改正系數,使設計者只需在地形圖上獲取集水面積,河道平均坡降和流域形狀系數,在參數等值線圖上查得橋涵所在地的相應參數,使用計算器即可迅速計算出設計流量,大大縮短了設計周期,且精度較高,設計的洪水流量一般低於傳統方法,從而可減小橋涵跨徑,節省投資。Aiming at the problem that existence in the monitoring of simulate disk in local power grid, to enhance the level and efficiency of the electricity dispatch, to improve operation procedures, to change the troublesome work about 6kv line simulation disk, 35kv transformer substation and 6kv substation host cording diagram revision and maintenance from man - power, manual promotion to direct - viewing, real - time and work flow high automation level
針對地方電網「模擬盤」監視中存在的問題,為提高電力調度工作水平和效率,完善操作規程,把煩瑣的6kv線路模擬盤、 35kv變電所和6kv配電所主結線圖的修改和維護工作從人工、手動提升到直觀、實時和工作流程高度自動化水平,實現電力調度日報、月報及日常管理實現規范化、自動化。So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing
本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完善堵口工程龍口水力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港洪水、計算時段的變化、多口門、多庫容、多水閘)的龍口水力計算,並進行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍口水力要素最大值等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍口水力計算,為堵口合龍提供科學依據。The results of the experiment are in good agreement with the data of theoretical calculation and the actual conditions of earthquake calamity. these data and information give a convenience for the following work. the finite element analysis ( fea ) has been completed within the environment of ansys
有限元分析主要以ansys為工具對煙囪進行了動應力計算,得出了在不同地震波水平和豎向激勵下動應力隨高度分佈情況,並據此繪制了動應力隨高度變化曲線圖。Therefore, under the certain condition of the profile of open channel, the size of long and narrow plate and installation, the flux can be achieved from the equal flux curve if the opening angle of the plate and water depth in front of the plate are accurately determined
在確定渠斷面、細長板尺寸以及安裝布置條件下,只要準確測得細長板開啟角與板前水深,便可利用等流量線圖得知此時的流量。Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed
結合陜西藺河口水電站工程實際資料,對m方案和n方案溫度場進行了施工期和運行期全過程模擬計算分析,給出了拱冠梁剖面和壩體中心縱剖面準穩定溫度場等值線圖以及施工期、運行期拱冠梁剖面和壩體中心縱剖面非穩定溫度場等值線圖,提供了施工期逐月和運行期每年最高、最低溫度等成果,分析了壩體溫度分佈規律以及高溫區形成的原因,並探討了預埋冷卻水管的效果和可行性以及預埋冷卻水管的區域。Our company is the profession produces the factory house of the metals plastics handicraft product, is a firm gathers the design and manufacturing, in the last years we are positive to set up to expand, the technique is continuously perfect, the product construction renews continuously, having owned the design, paint, make the mold and wash to press, print, throw the light, electroplate, linear production in flowing water in etc. in packing technique equipments, main creation : every kind of copper, iron, stainless steel, aluminum, zinc metal alloy, lead tin metal alloy, acryl, pvc. . etc. material of the badge, medal, key buttons up, the badge of police, memorial chapter, memorial currency, school badge, craft mark card, skin piece mark card, tie clip, knife and fork cutlery, into oil acryl, bottle opener, music speech bottle opener, resemble etc. travels the trophy, the business advertises the promotion gift and craft gift
本公司系專業生產金屬塑料工藝品的廠家,是一家集設計與製造為一體的供應商,多年來積極創新開拓,技術不斷完善,產品結構不斷更新,已擁有設計、繪圖、制模、沖壓、印刷、拋光、電鍍、包裝等流水線的生產技術設備,主要製作:各種銅、鐵、不銹鋼、鋁、鋅合金、鉛錫合金、壓克力、 pvc等材質的徽章、獎章、鑰匙扣、警徽、紀念章、紀念幣、校徽、工藝標牌、皮件標牌、領帶夾、刀叉餐具、入油壓克力、開瓶器、音樂語音開瓶器、像架等旅遊紀念品,商務廣告促銷禮品及工藝禮品。Even if numerous methods, but most of them are linear processing which have the side effect of bluring edges, so can not meet the case of detecting edges and suppressing noise. and the use of some nonlinear methods we have had are also limited for the lack of theoretical basis
在眾多的演算法中,基於頻域分割原理的線性處理方法在去除噪聲的同時會模糊圖象的邊緣,很難滿足針對水聲圖象特點的「保邊去噪」的要求;而一些非線性方法又缺乏統一的理論基礎,使其在系統整體的應用中受到限制。With the methods of parametric inputting, interactive inputting and graphic inputting, this system can build the three - dimensional models of ship and modify the model from time to time. moreover, this system can transform the models into ship line drawings that include waterline drawings, transverse section drawings and vertical section drawings
在此基礎上,本文利用參數化輸入、人工互動式輸入和圖形導入等多種方法建立船舶的立體模型,並能實時編輯修改;進一步地,系統能夠由三維模型反演出型線圖,即水線圖、橫剖面圖、縱剖面圖。The method for plotting chart on pressure - loss curve through choke of water injection well
配水嘴嘴損曲線圖版製作方法In order to enhance coding / decoding speed, we have rewritten image wavelet decomposition and composition program with c6701 assembly language in which we made use of parallel instructions and pipeline optimizing skill to lessen calculating time
為了提高編解碼速度,圖像小波分解與合成程序完全用c6701匯編指令編寫,其中大量使用并行指令和流水線優化,使運算時間大大減少。With piv technology, the flow field was measured to judge the performance of pump sump. by analyzing the pictures of velocity, streamline, turbulent kinetic energy and vorticity, we found that the turbulence was bigger while the ratio of the runoff increased. and the vortices always appeared in the field where the runoff was small
通過piv試驗,測量了封閉式水泵吸水室內部的流場,以研究該水泵吸水室的性能; ( 2 )通過分析流速圖、流線圖、湍動能圖和渦量圖,發現了流量比越大,湍動越大,漩渦總是出現在流量較小的一側。分享友人