水處理構築物 的英文怎麼說

中文拼音 [shuǐchǔgòu]
水處理構築物 英文
water treatment structure
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 處名詞1 (地方) place 2 (方面; 某一點) part; point 3 (機關或機關里一個部門) department; offi...
  • : Ⅰ名詞1 (物質組織的條紋) texture; grain (in wood skin etc ) 2 (道理;事理) reason; logic; tru...
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : 名詞1 (東西) thing; matter; object 2 (指自己以外的人或與己相對的環境) other people; the outsi...
  • 構築 : construct (millitary works); build
  1. In combination with project example of the application of microporous aeration and carrousel 2000 oxidation ditch process in a municipal sewage treatment plant, the advantages and disadvantages of the process flow compared with others were described ; the basic principle of degrading organic substance and removing phosphorous and nitrogen by means of the process flow was analyzed ; the main design parameters and economic and technical indices for various structures were put forward

    結合某城市污廠採用微孔曝氣、卡魯塞爾- 2000型氧化溝工藝的工程實例,闡述了該工藝流程相對于其它工藝流程的優、缺點;分析了該工藝流程降解有機及除磷、脫氮的基本原;並提出了該工藝流程中各的主要設計參數及技術經濟指標。
  2. In foundation treatments of buildings or structures in sandy region, the sand compacted by down - seepage water technique is adoptable to enforce the compactness and bearing capacity of sand and soil cushion to meet the design requirements

    摘要在砂土地區進行建(的地基時,採用墜砂技術可使砂土墊層的密實度和承載力達到設計要求。
  3. Hong kong gifts premium and houseware fair experienced renewed international interest which demonstrated the vitality of an international city always geared to strengthen its leading role as the " events capital of asia, " said mr cliff wallace, managing director of hkcec. hml is a subsidiary of nws holdings limited " nws holdings ", stock code : 0659, the flagship servicing company of new world development company limited stock code : 017. nws holdings embraces a diversified range of businesses in hong kong, macau and in the mainland

    新創建集團有限公司(新創建集團;股票編號: 0659 )乃新世界發展有限公司(股票編號: 017 )之服務業旗艦公司,業務遍及香港、澳門及中國內地,公司業務主要由三大部門成,計有:服務業,包括設施管(香港會議展覽中心之營運管、富城業管和大眾安全警衛) 、建機電(協興建和新創機電) 、交通運輸(新巴和新渡輪) 、金融保險及環境工程;傳統基建的投資項目則涵蓋電力、收費道路、食及污、橋梁和隧道、 ;以及港口,包括貨櫃及貨裝卸、倉庫儲存和提供流運輸網路。
  4. The thermal crack problem of the mass concrete is very complicated, and correlative with structure, building material, construction, rock, circumstance, and so on. now, in the construction field, the research on the mass concrete used during hydraulic construction is more frequent than the others, white the research on the comparatively small mass concrete used in the normal buildings is not deep enough and comprehensive, the covering area in the related codes are limited and narrow. many problems in construction practice have to be solved by the experience, rather than by theory. this phenomenon leads to much unnecessary waste of labor, material and financial resources, also the quality is unsatisfactory

    建設領域目前對工建中所使用的大體積混凝土(巨型混凝土結)研究較多,而對普通建中所使用的體積相對要小很多的大體積混凝土(相當于中體積混凝土)的研究卻還不夠深入、全面,相關的規范條文覆蓋面還不夠完善,對很多工程實踐中的問題只能依靠經驗,缺乏適當的論依據,這使得在工程實踐中造成許多不必要的人力、力、財力的浪費,大體積混凝土施工質量控制的結果也不很想。
  5. There is abundant of alga in raw water from july to september every year, a great deal of alga usually cause filter - stopping, higher turbidity and chroma of effusion, increasing the chlorine consumption, endangering the security of drinking water

    在每年的7 9月湖于高藻期,大量的藻類進入常常造成濾池阻塞、出濁度與色度偏高、氯耗增加,危及人們的飲用安全。
  6. The improper excavating will bear capacity, water permeability, natural structure and geological structure worsenning the base rock of foundation., this ca n ' t be allowed to the water conservancy project building, especially to block water building. lt will not only increase the expenses happened of the remedy measure, but also lengthen building straight line time limit for a project of construction

    開挖不當將降低基巖的承載能力、增大基礎的透性、惡化基巖的天然結和地質造,這對於工建,特別是擋是不能允許的,同時將會增加採取補救措施所發生的費用,延長建施工直線工期。
  7. Firstly, for normal high building, second - class measurement could meet the needs of sinking survey ; secondly, the location of survey should be based on the design drawing and choosing the first structure layer as a survey period ; thirdly, the arrangement of the results of sinking survey should be regular and accurate by a certain person, and if there is problem present, it should be solved or done away with in time ; finally, the results of building sinking survey should be fed back in time to survey, design and construction units as reference for the next project

    首先對一般的高層建來說,只需二等準測量即可滿足沉降觀測的要求;其次,對于沉降觀測點及觀測的周期,通常要按照設計圖紙的要求布設觀測點,觀測的周期一般以一個結層為一個觀測周期;第三,對沉降觀測結果的整,要定期定人及時準確,發現問題要及時解決;最後,建沉降觀測的結果要及時反饋給勘察、設計和施工單位,為下一步的勘察、設計和施工提供可靠的參考依據。
  8. On the other hand, city - water resources should be planned reasonably, and the regional water supply plants should be researched and carried out. 3. adopt advanced process of water supply actively

    改造庫區城鎮供廠的制工藝,優化原設計的工藝流程和制,充分挖掘其潛在的能力。
分享友人