水輪發電機 的英文怎麼說

中文拼音 [shuǐlúndiàn]
水輪發電機 英文
hydraulic generator
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (輪子) wheel 2 (像輪子的東西) wheel like object; ring; disc 3 (輪船) steamer; steamboa...
  • : 名詞(頭發) hair
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : machineengine
  1. The selection of neutral - point earthing ways of the hydrogenerator of left - bank power station in the three gorges project should be related to one - point earthing protection of the stator of its generator within one hundred percent framework

    三峽工程左岸水輪發電機中性點接地方式的選擇應和100 %范圍定子一點接地保護相關聯。
  2. Specification for static commutated excitation systems and devices for large and medium hydraulic generators

    大中型水輪發電機靜止整流勵磁系統及裝置技術條件
  3. This paper utilizes computer technique and mcu, and realizes water - wheel dynamotor ' s wireless communication, vibration analysis, data acquisition and process, and so on

    本文利用現代計算與單片技術,實現智能巡檢管理系統對水輪發電機組的振動分析、數據採集與處理等功能。
  4. Based on the demand of power department, a full distributed multifuncitional monitoring device is studied. this instrument not only can measure the data of hydroelectric plant, but also integrate the funcition of control the dynamotor, by cooperate with the program of epigynous system, it can realization the auto generate electricity on the hydroelectric plant and ordinal startup - stop of the dynamotor. 2 furthermore, performance of integrated dft arithmetic enhances the acturacy and reliability of measure. by communication several devices can run online to be controlled dispersedly and managed centrally

    本文分析了國內外站自動控制裝置的研究和展狀況,尤其是國內小型站的自動化現狀,針對現有力部門的需求,設計並實現了一種單元式的微自動監控裝置,該裝置不僅實現了對站內各種模擬參數和數字信號的實時監測功能,還對水輪發電機組進行了調控,通過與上位處理程序的配合,可以實現站的自動控制、組順序啟停;在測量壓和流參數的時候,採用32點離散傅立葉演算法( dft ) ,增加了測量的準確性和可靠性;通過通訊可以實現裝置的聯網運行,做到「分散控制、集中管理」 。
  5. The cooling ways for large hydro - generator principally include four types : air cooling, half - water cooling, water cooling, and evaporation cooling

    摘要大型水輪發電機的冷卻方式主要有空冷、半冷、全冷和蒸冷卻4種方式。
  6. Fundamental technical specifications for hydro generators

    水輪發電機基本技術條件
  7. Basic specification for bulb hydro generators

    燈泡式水輪發電機基本技術條件
  8. Analysis on the magnetic pole fault of the feilaixia bulb type turbine generator

    飛來峽貫流式水輪發電機磁極故障的分析
  9. On magnetic pole faulty analysis of turbine - generator of feilaixia hydropower station

    飛來峽水輪發電機磁極故障分析
  10. There will eventually be a total of 12 turbines on the right side of the three gorges dam, which is in the midsection of the yangtze, china ' s longest river

    三峽大壩右側未來一共將有12個水輪發電機組。三峽大壩位於中國最長的河流長江的中段。
  11. Research on vibration influence of main power house induced by increment of capacity of hydrogenerating unit and improvement

    水輪發電機增容改造對主廠房的振動影響研究
  12. As a prime mover, a small hydro turbine can produce the independence power for agriculture and industrial machines without fossil fuel

    摘要小型水輪發電機作為原動能為工農業械提供自主源。
  13. Analysis and comparison of four transposition methods in the stator bar of hydrogenerator

    水輪發電機定子線棒4種換位的分析與比較
  14. The rational transient process is set by the improving td based on the classical pid controller, which effectively reduces undershoot of non - minimum phase system

    使之用於功率設定值變化的水輪發電機組有功功率控制中,模擬結果表明了該方法的有效性。
  15. A separated collecting ring with carbon brushes was designed and manufactured for the dynamic stress test of spoke plates of rotor of bulb tubular turbine generator

    摘要根據測試需要,設計自製了分體式碳刷集流環,對燈泡貫流式水輪發電機轉子輻板進行了動應力測試。
  16. Basic specifications of automatic control components devices and their related system for hydroturbine - generating sets

    水輪發電機組自動化元件裝置及其系統基本技術條件
  17. To resolve the situation that the sensitivity of present ground fault protection schemes is low for the large - sized hydro - generators, a kind of protection scheme based on the fault component of third - harmonic voltage and two kinds of protection scheme based on the fault component of zero - sequence voltage at the terminals and neutral are developed, and they can obtain higher sensitivity and reliability and provide 100 % protection for the stator windings. the influence of noise on the stator ground fault protection based on the local modulus maximum of wavelet transform is analyzed

    針對目前大型水輪發電機定子繞組單相接地保護靈敏度偏低的問題,通過分析單相接地故障后端和中性點零序壓的變化特點,提出了一種基於端和中性點三次諧波壓故障分量和兩種基於端和中性點零序壓故障分量的高靈敏度、高可靠性保護方案,並實現定子繞組的100 %保護。
  18. Therefore, the stator ground fault protection plays an important role in the protection system of generator. at present, the large - sized hydro - generators, such as the generators in three gorges power station, require that the stator ground protection must be with very high sensitivity, so that it is beyond the capacity of available protection schemes

    定子繞組單相接地保護是大型保護系統中十分重要的一項內容,而現有保護方案難以滿足目前大型水輪發電機(如三峽組等)不斷提高的定子繞組單相接地保護靈敏度要求。
  19. By analyses and compares, the conclusion is that it would be better to choose high resistance grounding of distribution transformer for hydro turbine in hydro power station. there is no certain conclusion for steam turbine in fossil - fired power plant. getting a clear answer to choose good generator grounding mode still needs practice and time

    經分析比較認為,在水輪發電機組宜選用接地變高阻接地方式;在火廠和熱廠汽組,選用何種接地方式,給出明確的結論尚需理論和實踐的進一步深入。
  20. The company produces hydro turbines, hydro generators, steam turbine generators and gas turbine generators

    哈爾濱廠生產水輪發電機、汽和燃氣
分享友人